Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

For RailFans, Platform Announcements are more musical than Bollywood songs. - Prince Maan

Search Forum
<<prev entry    next entry>>
Blog Entry# 2231046
Posted: Apr 11 2017 (14:37)

5 Responses
Last Response: Dec 15 2018 (10:10)
General Travel
20122 views
17

★★
Apr 11 2017 (14:37)   12688X/Dehradun - Madurai SF Express (PT) | DDN/Dehradun (5 PFs)
brucewayne~
brucewayne~   2901 blog posts
Entry# 2231046            Tags   Past Edits
*****Dehradun Survey Part-2*****
Yard, Platfroms, Restyard, and rebult new PF-4
1. SB showing up Lahori Express as well as Doon Express standing parallely to Shatabdi at PF-3 and the washing lines.(zoom rhe bic a bit.. HDR effect hazed it)
2. View from Platform 3 endside towards washing line and Platform 4.
3.
...
more...
Washing line Board at extreme end.
4. Pit Line No.6 the only board left out....to show...😀😀
5. & 6. Zoomed and Curved view of the mini washing yard of Dehradun. Trains standing in the tow are... starting from Shatabdi @ PF-3
Amritsar-Dehradun Lahori next to it
Mussorie Express (Dehradun to DEE via Gajraula)
Doon Express
Nanda Devi AC Express.
and at last Link Express (Allahabad-Kathgodam) at PF-4 which juat arrived with some bizzare delay led by EMD hunk 4D beast.
7- #SB for Platform 4 while photobombed by Tuglakabad EMD.
8. #SB as well as #TB for Dehradun-Madurai Superfast Express which was standing at last Pitline of Dehradun aside PF-1. Due to its lengthy coach composition this one shares two lines in yard aside platform.
Clicked simultaneously up and down. Captured it with SB for PF-1.
9. The resting Diesel power....
EMD from TKD 4B later hauled Varanasi bound Janta Express (40004 usually hauls Shramjeevi and DBRT Rajdhani)
Frieght Power LKO G-3A standing simultaneously to EMD in resting mode.
Last was the Aloco Bull Power from TKD M-3A resting.(this one is usually seen resting.
This loco shed is the last part of the NR Railway Dehradun which was previously a pitline and godown.
From Platform 4 ylthe over bridge is under repair do if you have to take exit than just cross the whole yard and than exit or if you are a local commuter than juat cross it via Railway Line towrds SGRR college.
Sorry for late upload guys. (D.O.P 8-4-17)
Do Enjoy one of the finest city of North. The Dehradun.
Rate if you Like.
Thanks

Translate to English
Translate to Hindi
Show AI Response

1 Public Posts - Tue Apr 11, 2017

2 Public Posts - Wed Apr 12, 2017

12688 views
0

Apr 13 2017 (10:50)
brucewayne~
brucewayne~   2901 blog posts
Re# 2231046-9              
dunn know brother but only 18 coach can accomodate platform..... length wise no idea..!!
Translate to English
Translate to Hindi
Show AI Response

1 Public Posts - Sat Dec 15, 2018
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy