As electrification between raichur n adoni is completed links of many trains will be changed. Also, dhone gooty track has also been fully electrified... Expected changes in links r as below
1.Sc-Ypr Garibrath express with LGD WAP4
2.Rayalaseema express with LGD WAP4 end to end
3.SBC Rajdhani express with LGD WAP7 end to end from July 1st as stated
4.Kcg-Sbc...
more...
1.Sc-Ypr Garibrath express with LGD WAP4
2.Rayalaseema express with LGD WAP4 end to end
3.SBC Rajdhani express with LGD WAP7 end to end from July 1st as stated
4.Kcg-Sbc...
more...
5 Public Posts - Thu Apr 27, 2017
Sir.... these r not yet decided.But Garibrath is gonna get a WAP4. I'm sure abt this.These day venkatadri n sbc SF r running very late....Even more than an hour due to their diesel links asboth use twin alcos n their acceleration is pathetic...So this is just a petition made to the Scr senior officers in the recent days...N also GPU is electrified..Even before raichur adoni railway line