Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bhrigu Express: बलिया की आन बान और शान , भृगु एक्सप्रेस है तुम्हारा नाम। हर रविवार तुमसे मिलना है मेरा काम। - Shanzil Kabir

Search Forum
<<prev entry    next entry>>
Blog Entry# 2272192
Posted: May 11 2017 (11:25)

5 Responses
Last Response: Oct 06 2017 (01:10)
Travelogue
17034 views
16

★★
May 11 2017 (11:25)   12382/Poorva Express (Via Gaya) (PT) | NDLS/New Delhi (16 PFs)
Anirudh Mukherjee
Anirudh Mukherjee   532 blog posts
Entry# 2272192            Tags   Past Edits
TRIP REPORT: Poorva Express (NDLS-BWN, 1/7/2016) /diary/trip/86999 (Going to be a multiple part report)
It was a much-awaited trip for me as a traveler and as an RF. It was my first trip in any LHB 130Kmph SF so excitement was justified with another good reason. I was all set for the ride and was praying that may BSB-MGS section not make much of pain for me as some track work was going on there (near janghai) which made UP Poorva horribly late (That time 12381 used to be very punctual, reason we all know), in addition to all these, one more thing was haunting me.. that was of DN Poorva being rescheduled, as UP one was much delayed and
...
more...
still not at NDLS. Many of RFs here in IRI was also discussing rescheduling of DN Poorva which was only making me anxious and often with sweating episodes which were soon being overshadowed by the excitement of the journey. Within all these mood transitions the clock ticked 2 and I checked NTES, knowing that 12382 is going to be rescheduled for sure but NDLS was about to surprise me showing a completely unexpected thing, DN Poorva Wasn't rescheduled!! Firstly I thought NTES is doing what it does the best.. 'Drunk Reports' but the report turned to be correct when I realized it with my own eyes at NDLS @1515HRS. The same rake (which came with 12381) was about to depart from platform only (Pic 1). I did a bit of inspection and found that only loco was detached(Pic 2) and HWH P4 22336 was about to take charge of Poorva that day, that day something very rare happened at NDLS, the coupling of Loco at Platform (Pic 3)!! which is a very rare thing to see at NDLS. Now it was time to grab my seat which was the window seat in moving direction of the train, as I told before that rake was made to depart from the platform so no maintenance was done only normal cleaning was performed in SL coaches. At 1615hrs, The journey started with a jerk of LHB(Pic 4) which provided some relief from the continuous heat waves which we were suffering from, at NDLS. As we were speeding up (i must say P4 acceleration was amazing) The King came honking with HWH 30311(Pic 5) and some sort of Parallel overtake was happening, King was taking us out but finally it ended with a stop of both the trains, 12302 was being placed at platform hence it stopped but I don't know why Poorva was made to stop, chain pulling might be the answer.
======================================Part 2(NDLS-ALJN) will be published later============================

Translate to English
Translate to Hindi

10781 views
0

May 11 2017 (11:32)
Anirudh Mukherjee   532 blog posts
Re# 2272192-1              
Ahmad Sir was also a part of the journey that day. (NDLS-GAYA in 3A)
Translate to English
Translate to Hindi

8739 views
0

Jun 26 2017 (17:10)
~   5281 blog posts
Re# 2272192-2              
Nice narration ...😎
Translate to English
Translate to Hindi

7484 views
0

Sep 20 2017 (20:31)
Baaz_SGUJ_WDP4~
Baaz_SGUJ_WDP4~   1620 blog posts
Re# 2272192-3              
In such situations, it is good to do some fast cleaning works of trains, to reduce chain of delays. First LHB 130kmph!! Finally you did it!
Translate to English
Translate to Hindi

8134 views
0

Sep 24 2017 (02:35)
Mridul^~
Mridul^~   46650 blog posts
Re# 2272192-4              
Where is part 2?
Translate to English
Translate to Hindi

7109 views
0

Oct 06 2017 (01:10)
Anirudh Mukherjee   532 blog posts
Re# 2272192-5              
Phir man nahi kiya tha likhne ka... ab likhunga
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy