May 17 2017 (12:40) MFP/Muzaffarpur Junction (8 PFs)
Subrat Shrivastava
Subrat Shrivastava 29709 blog postsMuzaffarpur Hajipur Doubling Update.
Some days ago sppoted Katni WDG3A with BOBYN Rakes at brand new tracks that laid between Muzaffarpur to Hajipur.Loco is reversing the rake towards Hajipur at very low speed.Probably a trail run is going of this new track.Doubling is almost done but the tracks are not electrified.OHE Poles are buried but still wiring is incomplete.Work is going on in full swing
Some days ago sppoted Katni WDG3A with BOBYN Rakes at brand new tracks that laid between Muzaffarpur to Hajipur.Loco is reversing the rake towards Hajipur at very low speed.Probably a trail run is going of this new track.Doubling is almost done but the tracks are not electrified.OHE Poles are buried but still wiring is incomplete.Work is going on in full swing
Bohut achchi khabar sunayi bhai aapne,MATLAB Ab jald hi kaam khatm hoga
1 Public Posts - Wed May 17, 2017
3 Public Posts - Sat May 20, 2017