Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

रेलफैनों को आता है ज़िन्दगी का मज़ा लेना

Search Forum
<<prev entry    next entry>>
Blog Entry# 2280643
Posted: May 17 2017 (19:03)

16 Responses
Last Response: May 19 2017 (12:10)
Rail Anecdote/Joke
10244 views
8

May 17 2017 (19:03)  
z
z   239 blog posts
Entry# 2280643               Past Edits
प्रभु जी के द्वारा लोअर बर्थ विंडो सीट के लिए किराये बढ़ाये जाने के बाद कुछ और भी सुझाव मिले हैं,
१) इंजन के साथ वाले डिब्बे का किराया ज्यादा होना चाहिये क्योंकि ये सबसे पहले पहूँचता है
~l 😁
२) प्लेटफार्म 1 पर ठहरने वाली गाड़ियों का किराया भी ज़्यादा वसूला जाना चाहिए
~
...
more...
😁
३) पत्नी को मायके छोड़ने जाते हुए पुरुषों से ४ गुना किराया भी लिया जा सकता है
~😁
४) ट्रेन में लटक कर यात्रा करते हुए स्पाईडर मैन की फीलिंग लेने पर एक्स्ट्रा चार्ज लगना चाहिए
~ 😁
५) पायदान पर गमछा बिछाकर बैठने पर दुगुना किराया होना चाहिए
~ 😁
६) पंखा चलाने, मोबाइल चार्जिंग करने का 50 रुपये सरचार्ज भी लिया जाना चाहिये
~ 😁
७) ट्रेन में बैठकर ताश खेलने पर मनोरंजन कर भी वसूल किया जा सकता है
~ 😁
८) सुबह पटरियों पर प्रेस कांफ्रेंस करने वालों से ५-५ रुपये वसूल करके भी सालाना अरबों रुपए की आय बढ़ाई जा सकती है
~ 😂
९) एक्सप्रेस ट्रेन से ज्यादा, पैसेंजर ट्रेन सैर कराती है, जंगल, पहाड़ और खेतों के बीच रोककर यात्रियों को प्रकृति से संबंध बनाने का अवसर भी प्रदान करती है, अत: उसका किराया भी बढ़ाकर उसे पर्यटन रेलगाड़ी भी घोषित किया जा सकता है
~ आपका अपना , भक्त
😊😊😜😜😜

Translate to English
Translate to Hindi

11 Posts

2904 views
1

May 18 2017 (18:29)
Railfan_bihari
Railfan_bihari   5266 blog posts
Re# 2280643-12              
Conventional coaches with CBC couplers aur LHB coaches me kya fark hai batana ?? Yehi Na ki LHB 160 PE run kar sakte hain par aap 160 ya 130 PE kahan run karwaoge IR network me jahan 90 % tracks dhang SE 110 fit bhi nahi hai.
Translate to English
Translate to Hindi

2742 views
0

May 18 2017 (22:29)
vipinpv~
vipinpv~   316 blog posts
Re# 2280643-13              
Since you asked for difference, Gist of things.
1. Fully stainless steel body, less weight, lesser stress on the rails.
2. Coupling as you mentioned different (its not exactly same as CBC in ICF)
3. Fiat bogie, different kind of suspension, (LHB coaches have axle mounted suspension system whereas ICF coaches have dashpot type suspension system) reduces the standard oscillation we are so used
...
more...
to.
4. Wheel design LHB coaches have a shorter wheel base thus improved ability to negotiate curves at higher speeds.
5. Disc brakes against thread brake system in ICF.
6. LHB coaches requires less maintenance (intermediate hauling every 5 Lac kms, and periodic hauling every 10 Lac kms) whereas an ICF coach has a shorter maintenance schedule (intermediate hauling every 2 Lac kms and periodic hauling every 4 Lac kms)
More in below two links
Quora: click here
More detailed technical information: click here

Translate to English
Translate to Hindi

2722 views
0

May 18 2017 (23:05)
Railfan_bihari
Railfan_bihari   5266 blog posts
Re# 2280643-14               Past Edits
Here is the answer
1) Can't IR make conventional coaches using stainless steel ?? If yes then what's the use LHB ?
2) Even if coupling is different but it's effect is still the same I.e coaches will not roll over each other in case of a mishap
3)In India as I already told that 90 % tracks aren't even properly 110 fit so
...
more...
oscillation and all that is not something to worry about when train is running at just 100 kmph..LHBs should be used in train having MPS of 130 or above.
4)Even with LHB coaches trains are running at the same average speed as it ran with ICF coaches so that means that atcurves even LHB trains slow down.and the difference will be just that ICF train will run at a curve suppose at 40 kmph then LHB can do it at 50 kmph and as there is no tilting mechanism so speed at curves willnt affect the average speed of train by even a minute.
5)at a speed less than 110 kmph even conventional braking mechanism is efficient
6)that's right but still keeping the cost of LHBs in mind I will say that for an in debt organisation like IR it's better to use cheapaer technology..

Translate to English
Translate to Hindi

2689 views
0

May 19 2017 (09:35)
vipinpv~
vipinpv~   316 blog posts
Re# 2280643-15              
"Can't IR make conventional coaches using stainless steel ?? If yes then what's the use LHB ?"
The moment you are going to alter current ICF and manufacture stainless steel ICF the cost is going to any way increase, so your whole argument fall short there. Cost of LHB is not there because of the name LHB, its because of the input raw materials.
Have a simple question, for argument sake. just because your parents have to borrow money to educate you as well as make ends meet does that mean
...
more...
they should have to provide you substandard education or no education and give you unhygenic food ? instead of providing you good food and education ?

Translate to English
Translate to Hindi

2619 views
0

May 19 2017 (12:10)
Railfan_bihari
Railfan_bihari   5266 blog posts
Re# 2280643-16              
Bro my parent will borrow money to educate me only then when they will feel that I can earn enough to return the borrowed amount..If I can't earn enough money then they will not educate me that's it..
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy