Search Forum
Blog Entry# 3801617
Posted: Sep 12 2018 (22:52)
31 Responses
Last Response: Jan 17 2019 (09:55)
31 Responses
Last Response: Jan 17 2019 (09:55)
Sep 12 2018 (22:52) 11139/Mumbai CSMT - Hosapete SF Express (PT) | IDR/Indi Road (3 PFs)
SingleTraveller^~
SingleTraveller^~ 3252 blog posts8 Public Posts - Thu Sep 13, 2018
BSRX onwards land levelling is done and pillars for the bridge across River Krishna opposite to Almatti dam is finished. Further some places rock cutting and carving the sides of small hills is going on.
-
The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.
-...
more...
-
The speed after the bridge is 75; and the train does 180 degree turn right from the front of the dam to the rear through a massive curve at the high speed. The scenery and the screeching of the wheels during the turn at that speed is exhilarating.
-...
more...
3 Public Posts - Thu Sep 13, 2018
2 Public Posts - Fri Sep 14, 2018
7 Public Posts - Sat Sep 15, 2018
1 Public Posts - Mon Sep 17, 2018
2 Public Posts - Tue Sep 18, 2018
2 Public Posts - Wed Oct 10, 2018
3 Public Posts - Mon Oct 22, 2018
1 Public Posts - Tue Oct 23, 2018
1 Public Posts - Thu Jan 17, 2019