Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

RailFans - we wander, but never get lost - Shaurya Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 3986838
Posted: Nov 09 2018 (09:51)

13 Responses
Last Response: Nov 10 2018 (08:12)
Rail Fanning
11824 views
20

★★★
Nov 09 2018 (09:51)   12134/Mangaluru Jn. - Mumbai CSMT SF Express (PT) | KT/Kumta (2 PFs)
KT_Railfan^~
KT_Railfan^~   2010 blog posts
Entry# 3986838            Tags  
12134 Mangaluru Jn. - Mumbai CSMT SF Exp. led by KYN WDG3A chugging towards North after departing Kumta under Evening Golden Sun.
Date: 06-Nov-18.
Translate to English
Translate to Hindi
Show AI Response

8 Posts

3860 views
2

Nov 09 2018 (20:34)
KT_Railfan^~
KT_Railfan^~   2010 blog posts
Re# 3986838-9              
Agree... During Non-Monsoon, Even Passenger train Stopping & Accelerating at all stations when Section is clear, brings MPS Charm.
Doubling once done, will definately change KR like Anything.
Translate to English
Translate to Hindi
Show AI Response

3308 views
0

Nov 09 2018 (22:05)
SingleTraveller^~
SingleTraveller^~   3245 blog posts
Re# 3986838-10              
Will both the lines between MAO and MJO be electrified? Or just the one that belongs to KR?
Translate to English
Translate to Hindi
Show AI Response

3483 views
2

Nov 09 2018 (22:42)
KT_Railfan^~
KT_Railfan^~   2010 blog posts
Re# 3986838-11               Past Edits
Yes, Coz the section between MAO - MJO belongs to KR & Presently The only Double line section in KR. Also heard this section will be upgraded to Automatic Signalling.
Translate to English
Translate to Hindi
Show AI Response

3178 views
1

Nov 09 2018 (23:37)
SingleTraveller^~
SingleTraveller^~   3245 blog posts
Re# 3986838-12              
Yes, I know both are maintained by KR.
But thought that one belonged to SWR but maintained by KR.
I was under the impression that one line of KR will be electrified and SWR one left as it is.
Are both single lines like SBC - YPR or double line?
Auto
...
more...
signalling for 8 Kms? Will it make any difference?

Translate to English
Translate to Hindi
Show AI Response

3122 views
3

Nov 10 2018 (08:12)
KT_Railfan^~
KT_Railfan^~   2010 blog posts
Re# 3986838-13               Past Edits
Double line - Considered as Up & Down. SWR has nothing to do inbetween MAO- MJO. During VSG-QLM Doubling, Only SWR will have lay lines till Outer (bothsides), Connection & Interlocking works will have to be done by KR.
Lots of freights run from/to VSG/LD along with KR Traffic, So Looks like Auto Signalling to reduce Sectional clearance wait, Quick dispatch & reduce delays.
Translate to English
Translate to Hindi
Show AI Response
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy