Search Forum
Blog Entry# 4234842
Posted: Feb 17 2019 (20:13)
1 Responses
Last Response: Feb 18 2019 (11:29)
1 Responses
Last Response: Feb 18 2019 (11:29)
Valsad Railway Station getting Upgraded to A1 Category.
- New RCC Foundation made for Plinting some BG loco/coach at station outer road.
- Stainless Steel Fonts installed on Station Building (Valsad)
- New POP and LED lights getting installed on pf#1
-...
more...
- New RCC Foundation made for Plinting some BG loco/coach at station outer road.
- Stainless Steel Fonts installed on Station Building (Valsad)
- New POP and LED lights getting installed on pf#1
-...
more...
Wow , that’s so awesome , I also read that the station is upgraded to a1 category long back ago but I am still wondering that if they will allow more trains halts , more trains stoppage is required for people of Valsad