Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Start RailFanning NOW, learn to live - before you run out of time - Varun

Search Forum
<<prev entry    next entry>>
Blog Entry# 4279560
Posted: Apr 03 2019 (10:27)

7 Responses
Last Response: Apr 23 2019 (18:31)
General Travel
33654 views
17

★★
Apr 03 2019 (10:27)   11107/Bundelkhand Express (PT) | ALD/Allahabad (10 PFs)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Entry# 4279560            Tags   Past Edits
Refer to blog post /blog/post/4259469 and my blog post /blog/post/3654115
I walked on ganga railway bridge (newly made one for doubling of Prayag-Phaphamau line) yesterday from south end (prg side) to north end (pfm side). I was surprised that from 04th March when kumbh mela ended, to 02 April, in less than one month, the remaining 04 beams is completed. Very fast work as 25 beams took more than two years. Now all 29 beams completed. Only gaps between some beams and side barriers at some places remains to be completed on the bridge. See pictures
Pic
...
more...
1: View of bridge from below (east side). See iron support for construction of last beam being removed.
Pic 2: South end (prg side) of the ganga bridge
Pic 3: North end (pfm side) of the ganga bridge

Translate to English
Translate to Hindi
Show AI Response

2 Public Posts - Wed Apr 03, 2019

22659 views
3

Apr 03 2019 (11:31)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Re# 4279560-4               Past Edits
Railway never wants to finish work in time. Prg Station se Rambag ROB ke 200 metres west tak double line daal di gayi thi teen mahine pahle hi.
But they are not starting work from this place to Ald station east place where Ald-Nyn NCR, Ald-Aly NER and Ald-Prg NR line meets.
This remaining work is only 400 metres out of which 300 metres already has a old line (military siding) of british era, whose sleepers have entered/pressed in soil and tracks have rusted. The railway just have to replace sleepers and tracks
...
more...
in this 300 metres and no soil levelling required. Only 100 metres require clearing of jungle, soil levelling and track laying.
There is no problem of land also in this 400 metres as railway quarters are there adjacent to it and space for laying two more lines is there. The only small problem, which contractors may be pretending is presence of two 25kv wires coming perpendicular from SSP to feed the Ald-Prg section (single wali present line).
Pic 1: Rambagh ROB and Ald-Prg line in view. The left new line for doubling is laid upto here and 400 metres left for laying starts from here to Ald east yard end.
Pic 2: 90% pole erected for electrification of Ald-Prg double line.
Pic 3: One of the last poles being erected for the electrification of the dbl line.

Translate to English
Translate to Hindi
Show AI Response

1 Public Posts - Wed Apr 03, 2019

1 Public Posts - Mon Apr 08, 2019

1 Public Posts - Fri Apr 12, 2019

1 Public Posts - Tue Apr 23, 2019
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy