Search Forum
Blog Entry# 5393510
Posted: Jun 28 2022 (17:09)
43 Responses
Last Response: Jul 02 2022 (17:51)
43 Responses
Last Response: Jul 02 2022 (17:51)
Jun 28 2022 (17:09) 17015/Visakha Express
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~ 46455 blog postsNo halts in between GNT to SC and even speed is 44 KMH why IR/SCR playing with this train like this? Any idea? Even ACSF of VSKP has same issue, Track is electrified so what is the problem in increasing speed?
Thanks
Thanks
40 Posts
RSA vachei varaku, kastam impossible ane anipistadi .. u never know... and there is no logic for saying a blunt NO. Only during winters, Dakshin will face delays . I opine that SCR should gear up to handle such delays by providing extra rake instead of running 3 rakes for visakha all thru the year .
Meeru Pettina Timinigs ki Dakshin RSA kudaradu ani cheppa. Dakshin HYB early ga vachina PM ayye timings 10:00 to 18:00. So meeru cheppina Visakha timings ki Dakshin RSA possible avvadu
Poyi poyi deeniki pettaavaa link.. falcon ki a slot isthav baaaa mari?
Hwh bound falcon ke ga... anduke kada +/- 30 mins anaa .. falcon venakale start aite sari.