Search Forum
Blog Entry# 5440448
Posted: Aug 07 2022 (21:43)
4 Responses
Last Response: Aug 31 2022 (09:20)
4 Responses
Last Response: Aug 31 2022 (09:20)
Possible route to CPU -SGRL section from DDU and BSB, possibly reducing reversal time at CAR.
Not possible because of DFC line . If by-pass has to be made then a tunnel needs to be dug out beneath the DFC
The idea was to develop a elevated route over DFC and IR existing route.
Elevated route will require much investment. Rather than flyover on top of dfc a under pass can be made beneath dfc near chunar