Modasa - Shamlaji New Line Tender issued
Construction of New Line between New Modasa (MDSA) at take off point at Km :99.00 (from
Nadiad) Chainage Ch.:0.00 m to Shamlaji Road (SJS) at Ch.:26595.40 m (26.595 km)
covering...
more...
Construction of New Line between New Modasa (MDSA) at take off point at Km :99.00 (from
Nadiad) Chainage Ch.:0.00 m to Shamlaji Road (SJS) at Ch.:26595.40 m (26.595 km)
covering...
more...
19 Posts
Design, Supply, Installation, Programming, Testing and Commissioning of Electronic
Interlocking (E.I) system at Kapadvanj station of Nadiad-Modasa Section along with outdoor
S&T work in connection with the work of "Kapadvanj station: Converting SP class into "B"
class station with Electronic Interlocking "
Interlocking (E.I) system at Kapadvanj station of Nadiad-Modasa Section along with outdoor
S&T work in connection with the work of "Kapadvanj station: Converting SP class into "B"
class station with Electronic Interlocking "
Kya isi station s junction point banega new modasa station k lia samaji route pr
Nahi... Yaha se toh kafi aage se route niklega Modasa - Shamlaji wala...
Modasa - Shamlaji New Line Tender will open on 8 May.
Now this project will be completed in 18 months which was previously 24 months.
Now this project will be completed in 18 months which was previously 24 months.