Search Forum
Blog Entry# 5695492
Posted: Apr 15 2023 (19:46)
9 Responses
Last Response: Apr 14 (21:56)
9 Responses
Last Response: Apr 14 (21:56)
Apr 15 2023 (19:46) 12245/Howrah - SMVT Bengaluru Duronto Express | VSKP/Visakhapatnam Junction (8 PFs)
SCoR~
SCoR~ 1812 blog postsIt is bypassing Visakhapatnam. Okay fine
But why technical halt at Simhachalam North. Why can't it be converted into commercial stop
But why technical halt at Simhachalam North. Why can't it be converted into commercial stop
4 Posts
What is the reason behind the technical halt out there?
Is there any such technical halt for this train at Southern Railway zone? because it skips the entire zone
Is there any such technical halt for this train at Southern Railway zone? because it skips the entire zone
Atleast DVD can be given a proper halt. I think watering is also available at DVD
DVD doesn't have watering facility PF1 main line PF2 is loop always occupied by freight to let passenger trains from Vskp pass. Realignment needs to be done at SHM north or SHM to halt bypass trains for 5mins as regular stop with crew change.
Crew change point. As Vskp main station is skipped crew change the train at SHM north. Vijaywada Visakhapatnam is a section for crew and Chennai/Renigunta to Benguluru region is a section for crew.