Search Forum
Blog Entry# 5775695
Posted: Jul 13 2023 (22:51)
51 Responses
Last Response: Jul 18 2023 (19:42)
51 Responses
Last Response: Jul 18 2023 (19:42)
Jul 13 2023 (22:51) 16382/Kanniyakumari - Pune Express (PT)
CivilEngineer_cum_Railfan^~
CivilEngineer_cum_Railfan^~ 8777 blog postsGuys cant understand why this train is running is there a humongous demand for Pune by this train. Instead if it would have been permenantly cancelled or would get diverted via KR it would be better as via Pune 16339/40 and 16351/52 is also there along with 16331/32. If there are 3 trains via this mentioned route then why this train iss running then?? And if it is running then why it got partially cancelled till Pune?? Whats the reason here?? Is it the slot inavailability or what??
47 Posts
Good TT
Also What about shifting Chalukya slot trains to 00:05 or 00:15 Dep from DR ? So 21:30 will be free
And giving this slot to Mahalaxmi
Old Mahalaxmi slot to Sahyadri
For...
more...
Also What about shifting Chalukya slot trains to 00:05 or 00:15 Dep from DR ? So 21:30 will be free
And giving this slot to Mahalaxmi
Old Mahalaxmi slot to Sahyadri
For...
more...
Looks good but shifting Sharavathi to 15:15 would mean having an altogether new slot for a weekly train.. don't know how feasible it is. As far as Chalukya Express is concerned, it can be shifted to 00:15 slot as 00:05 is taken by Tutari Exp
Also I am a little skeptical about the 20:20 Mahalaxmi slot since it trails 17317/18 DR-UBL all the way to Miraj with a very small time gap making speedy run difficult, so better to have a different slot
Also I am a little skeptical about the 20:20 Mahalaxmi slot since it trails 17317/18 DR-UBL all the way to Miraj with a very small time gap making speedy run difficult, so better to have a different slot
Agree
Can Sharavati exp run daily ? As MP/MLA demanding extension of Udyan upto MYS which runs with full capacity
Can Sharavati exp run daily ? As MP/MLA demanding extension of Udyan upto MYS which runs with full capacity
The only train connecting Mysore and Mumbai should ideally run daily. It should have RSA with DR-UBL and run daily. DR-UBL arriving Mumbai in the morning can depart as Sharavathi to reach next day early morning at Mysore. Return train can start from Mysore in the evening to reach Mumbai the next day in the evening. The same rake can then go to UBL as DR-UBL Exp. Primary maintenance at MYS.