Search Forum
Blog Entry# 5789516
Posted: Aug 03 2023 (10:51)
6 Responses
Last Response: Aug 04 2023 (20:39)
6 Responses
Last Response: Aug 04 2023 (20:39)
IR Affairs
WCR/West Central
Rohittkarwal^~ 214 news posts
मौजूदा समय 46 रूटों पर दौड़ रही हैं वंदेभारत एक्सप्रेस.
Bhopal-Indore...
Bhopal-Indore...
3 Posts
I don't mind if they start from Gwalior but Operational Constraints always go hand in hand with Gwalior. Ab ye baat Gwalior Bina Railfan Brigade ko baht chubhegi but it's true. Halt timings of All trains have already reduced from 5 to 2 minutes and limited number of platform 2 for UP traffic, 1 for DN, 3&4 from Terminating/Originating Trains.
And as per existing timings feasibility of catering a train for 35-40 minutes would be a challenge
And as per existing timings feasibility of catering a train for 35-40 minutes would be a challenge
Vskp SC turnaround time at SC is 45mins with 16 coach and the train has max traveller footfall using both sides at SC. So a 8 coach rake with lesser traveller footfall at GWL can have a turnaround of 30mins.
I hope you are aware, NCR stands in front of the queue to reject train proposals giving an excuse of path and operations constraints.
Anyway will see whenever extension happens. Right now it's just in cards.
Anyway will see whenever extension happens. Right now it's just in cards.
Any thing can happen in IR with VB and in any zone. VSKP Vijayawada section is not in 130kmph upgrade timelines which was given 3 yrs ago. From KGP upto Vskp they have given timeliness with 3 yrs time. But Khurdha Vskp is not yet certified (may be by end of 2023-24) yet Vskp Vja section was upgraded to 130kmph certified and VB is running from Jan 2023.
I recently travelled in khurda Vskp section
12845 BBS SMVT Bengaluru SF clocked 130 km/hr in this stretch upto Brahmapur
I observed it at Chilika Railway station but I didn't observed whole complete 130 km/hr run because for some reason ECoR given priority to run Rourkela Gunupur Intercity just ahead of 12845 till Palasa
Later Palasa 12845 run behind Brahmapur VSKP ICE...
more...
12845 BBS SMVT Bengaluru SF clocked 130 km/hr in this stretch upto Brahmapur
I observed it at Chilika Railway station but I didn't observed whole complete 130 km/hr run because for some reason ECoR given priority to run Rourkela Gunupur Intercity just ahead of 12845 till Palasa
Later Palasa 12845 run behind Brahmapur VSKP ICE...
more...