Search Forum
Blog Entry# 5876075
Posted: Nov 09 2023 (09:18)
10 Responses
Last Response: Nov 11 2023 (09:08)
10 Responses
Last Response: Nov 11 2023 (09:08)
I have seen in Many Timetable that Loco Change is Done in 2 Minutes is it Too Easy And Fast to Do A Loco Change within 2 Minutes that too From Electric to Diesel and Visa Versa
8 Posts
LJN was much better..i remember when i used to travel in 2007 to 2012 by 12591, the moment train stopped at station, the railway employees would detach the engine..then engine would reverse and the new crew took over..all within 20 mins time.
You said it correctly. If a different loco is attached to the other end of a train, then the process can be completed in 20 mins easily. However, if the same loco has to undergo from front end of a train to back end and then reconnecting it, it often takes more time. It can still be done swiftly, but depends on how willing the railway folks there are to do so.