Search Forum
Blog Entry# 5957983
Posted: Feb 01 (09:05)
15 Responses
Last Response: Feb 01 (16:57)
15 Responses
Last Response: Feb 01 (16:57)
This train is again extended for another 4 weeks!
Cutting down one of the slacks, preferably between TPJ-MDU may possibly enable the option to extend up to Tirunelveli for SM. Less turn around time might be a barrier to get extended beyond Tirunelveli, since it requires enough time for SM.
Moreover, South TN regions like Tirunelveli, Tuticorin, Nagercoil, Kanniyakumari don't have direct train to interior western regions like OKHA. So, this needs to be addressed.
Cutting down one of the slacks, preferably between TPJ-MDU may possibly enable the option to extend up to Tirunelveli for SM. Less turn around time might be a barrier to get extended beyond Tirunelveli, since it requires enough time for SM.
Moreover, South TN regions like Tirunelveli, Tuticorin, Nagercoil, Kanniyakumari don't have direct train to interior western regions like OKHA. So, this needs to be addressed.
11 Posts
EKNR also doesnot serve saurastra region. Organising saurastra tamil sangamam but chennai deprieved of saurastra region direct train is not fair. Chennai and Coimbatore needs saurastra weekly connections.
Firstly EKNR is not in saurashtra region at all. coimbatore atleast has a weekly train to saurashtra (CBE RJT), whereas chennai doesn't have any. Agree that the frequency can be increased for the former but the latter is very much required.
Agreed WR or SR should think About Bhuj Chennai/ Porbandar Chennai/ Bhavnagar Chennai or any other train which connects Chennai with Saurashtra (Kathiawar) & Kutch region