Search Forum
Blog Entry# 5983984
Posted: Mar 01 (20:13)
7 Responses
Last Response: Mar 02 (07:55)
7 Responses
Last Response: Mar 02 (07:55)
IR Affairs
SR/Southern
Sameer2905^~ 687 news posts
With the Railway Board yet to take a final call on introducing Vande Bharat Express service in the lucrative Ernakulam-Bengaluru corridor, the demand is rife to...
10 Posts
They're planning to extend CBE BNC VB till ERS... so in a way not ruining that train but yes for Uday it would be a problem... but am wondering why they wish to start very early morning at 5 am (considering that they're planning to extend till ERS)... isn't that quite tough for ppl to come at 5 am and board that train to BNC??? I'd prefer to depart at 6 am and reach BNC by 2:30 PM....
I feel, the recent rescheduling is helping ERS in some way to consider about extension and it is a good measure rather than introducing one more VB in the same section. This will not ruin UDAY further I think. The damage was already done by VB and in this case, same VB is getting extended.
NCJ would be ideal than TVC. lot of ppl in Kanyakumari district need bangalore train. island is not sufficient.
Who will take responsibility on elephant corridor between madukarai and walayar?