Search Forum
Blog Entry# 6008544
Posted: Mar 25 (14:50)
3 Responses
Last Response: Apr 03 (18:01)
3 Responses
Last Response: Apr 03 (18:01)
IR Affairs
SWR/South Western
Exynos9611~ 11833 news posts
BENGALURU: The Bengaluru Railway Division is planning a big terminal at Devanahalli with maintenance facilities to decongest other key railway stations in the city. It is...
So What abt SMVT?SMVT was made with the same intention to decongest other terminals ri8
Yes but SWR still restricts to only east bound trains towrads jolarpet. It has lot of scope to introduce new train with PM or SM and station turnaround to east and also to North Dharmavaram but SWR is rejecting the proposals saying limited connectivity but they can give halt at KR Puram and Byappanahalli.
If you observe train routes and timings, no train passes through Bangalore to other cities (for example JTJ SA towards DVG/ DMM side). This is because of loco reversal at SBC or at SMVB. At SBC, no link to JTJ and YPR lines.
These restrictions lead to less connectivity.
If BWT Chikkaballapura line gets linked to DMM line at Gauribidanur/ Hindupur, part of problem can be solved. If Devanahalli Doddaballapura gets linked, it is also ok. If Doddaballapura gets linked to Tumkur line, it will be superb.
These restrictions lead to less connectivity.
If BWT Chikkaballapura line gets linked to DMM line at Gauribidanur/ Hindupur, part of problem can be solved. If Devanahalli Doddaballapura gets linked, it is also ok. If Doddaballapura gets linked to Tumkur line, it will be superb.