Search Forum
Blog Entry# 6027876
Posted: Apr 12 (15:01)
8 Responses
Last Response: Apr 17 (18:23)
8 Responses
Last Response: Apr 17 (18:23)
New Facilities/Technology
WR/Western
Sameer2905^~ 683 news posts
Currently, Vande Bharat trains between Mumbai and Ahmedabad are running at 130 kmph speed and it takes nearly 6 hours 30 minutes to complete the journey....
8 Posts
Yes IR is upgrading Mumbai - Ahmedabad section to 160kmhr but regarding the timing mentioned for VB that it will travel in less then 6 hrs, which VB is already doing.
After checking that, even I also wondered the same thing as what the other RFan had mentioned... I'll try to find the latest news and update that.... if confusions has arose, it's my apology...👍
There is no need for any apology, everything is good.
I was just mentioning how these news reporter write the news and mention it which crores of people read, they should be sensible and should think before writing anything like this.
These are incorrect information which they are mentioning.
I was just mentioning how these news reporter write the news and mention it which crores of people read, they should be sensible and should think before writing anything like this.
These are incorrect information which they are mentioning.
Agreed.... but I'm sure, leaving this news, this MMCT GNC and ADI MMCT will be able to reach their destinations in very less time... I can guarantee that... by the way, any idea when will the trial run happen?? Any info from the dept???
The time of both these trains would be reduced to around 5 hours or so.
For some parts in this section the tripling is done, the plan of WR is that they will run high speed and semi-high speed trains on the bullet train line and already WDFC is in progress for goods trains.
For some parts in this section the tripling is done, the plan of WR is that they will run high speed and semi-high speed trains on the bullet train line and already WDFC is in progress for goods trains.