Search Forum
Blog Entry# 829609
Posted: Aug 17 2013 (10:12)
No Responses Yet
No Responses Yet
Aug 17 2013 (10:12) 52965x/Indore Mhow MG Passenger (UnReserved) | FTD/Fatehabad Chandrawatiganj Junction (3 PFs)
avivips
avivips 597 blog posts4 August. While returning from Ujjain after waiving off the INDB-YPR Inaugural Express, I captured these pics with the drowning Sun later in the evening at Fatehabad, which shows lot of work still remains on site.
PF 1 is ready to welcome the first BG train from Ratlam but there are no sheds on the PF yet. The foot over bridge is not more than 30 per cent ready.
As heavy rain fall continuous throughout this season, lot of construction work is still going on at FTD and en route towards Ratlam and...
more...
PF 1 is ready to welcome the first BG train from Ratlam but there are no sheds on the PF yet. The foot over bridge is not more than 30 per cent ready.
As heavy rain fall continuous throughout this season, lot of construction work is still going on at FTD and en route towards Ratlam and...
more...