Full Site Search  
Sun Feb 19, 2017 17:24:39 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 901961  
Posted: Nov 10 2013 (14:37)

13 Responses
Last Response: Sep 03 2014 (20:36)
  
015
Station Tip
Amenities
0 Followers
5550 views
Nov 10 2013 (14:37)   CRLM/Karmelaram (2 PFs)

BMTIR*^~   21260 blog posts   7421 correct pred (63% accurate)
Entry# 901961            Tags   Past Edits
Though a suburb of Bangalore its a mere country side station with no amenities- there's no proper entry or exit point for the station and the main building structure is just as much as a small ticket room- The platform is at a very low level and is not suitable for senior citizens as welll as people with luggage or children as getting down or boarding will be a major issue.
Station is not well lit except some points and the main road connections is almost a km away and will take minimum 10 mins to walk to the minimum stop. Theres no auto stand or pre-paid counter and autos charge exhorbitant rates
Carmelram
...
more...
bus stop located a km away on Sarjapur Road provides the following connections
342 series buses- to WIPRO, Agara, Jakkasandra, Koramangla bus stand,Koramangla Water Tank, Dairy circle, Forum mall- 342H terminates at St. Johns Hospital- 342F runs to Majestic via Shantinagar bus stand. Major 342's run to k.R.Market
G-2: WIPRO, Agara, Koramangla bus stand, Sony World Junction, National Games Village, Trinity Circle
On opposite side you can take 342 till Dommasandra where 328B and 328H will take you to gunjur, Varthur, Hope Farn, Kadugodi and Hosakote

7 posts - Jan 2014

1 posts - Wed Apr 09, 2014

  
Apr 15 2014 (20:48)
BMTIR*^~   21260 blog posts   7421 correct pred (63% accurate)
Re# 901961-9            Tags   Past Edits
Platform being raised at Carmelram station

  
2139 views
Apr 16 2014 (13:47)
Kartheeswaran   469 blog posts   1414 correct pred (75% accurate)
Re# 901961-10            Tags   Past Edits
Yes sir... PF1 only the work is about to complete, after that they will start in PF2. Thanks for posting picture... I couldn't click pic since i was there in the station at 10.00 PM

  
2044 views
Apr 16 2014 (16:50)
BMTIR*^~   21260 blog posts   7421 correct pred (63% accurate)
Re# 901961-11            Tags   Past Edits
Yes- If they have to build PF-2 then Fob should also be provided

  
1537 views
Aug 29 2014 (17:55)
BMTIR*^~   21260 blog posts   7421 correct pred (63% accurate)
Re# 901961-12            Tags   Past Edits
Platform raised but still extension required- travelled by 16232 this time and my coach S-11 was the last to enter the platform from bangalore end- S-12 and UR were outside the platform

  
1837 views
Sep 03 2014 (20:36)
RailFanSBC~   368 blog posts
Re# 901961-13            Tags   Past Edits
Even KJM station itself is waste. There are no rooms to sit. No annoucement made in proper time. Just imagine a pasenger sitting at PF 2 & 3 in biting cold in winter. Dogs freely roam about. When trains get delayed , no announcements are made
Scroll to Top
Scroll to Bottom


Go to Desktop site