Search Forum
Blog Entry# 933266
Posted: Dec 13 2013 (09:47)
20 Responses
Last Response: Dec 14 2013 (12:04)
20 Responses
Last Response: Dec 14 2013 (12:04)
Dec 13 2013 (09:47) 15025/Mau - Anand Vihar Terminal Express (Via Ayodhya Cantt)
TheRailRoute^~
TheRailRoute^~ 10017 blog postsUrgently need to take care of this train else it would become one of the White Elephant of IR. If not,
it will not serve the purpose.
1. Train needs to extended upto Delhi.
2. Convert it into Superfast train.
3....
more...
it will not serve the purpose.
1. Train needs to extended upto Delhi.
2. Convert it into Superfast train.
3....
more...
16 Public Posts - Fri Dec 13, 2013
The problem with AMH and Mau is that there is only single line connecting to lko and that to with no electric signals the average speed is slow, dont you think Shahganj Loco Reversals taking 25 min is waste of time. i Know asking double electric line is bit too much but with major traffic passing through ALD-BSB or MSG or through Lko GKP we will conti. to lag behind in development, We don't need a superfast 15025 we need better infrastructure then automatically IR will give train passing through AMH and MAU. what do u say
1 Public Posts - Fri Dec 13, 2013
2 Public Posts - Sat Dec 14, 2013