Search Forum
Blog Entry# 946356
Posted: Dec 26 2013 (12:26)
15 Responses
Last Response: Dec 28 2013 (10:08)
15 Responses
Last Response: Dec 28 2013 (10:08)
Very bad train in terms of punctuality runs as a real superfast only between mysore to nagpur n rest leg of journey very bad even cleanliness is an issue
10 Posts
u mean sc route less conjested r u serious?
sc-sbc single route hai jam pack no space for other zone trains at all
u r from darbanga so i feel u want this train to sc ?
already sc-darbanga train is there
sc-sbc single route hai jam pack no space for other zone trains at all
u r from darbanga so i feel u want this train to sc ?
already sc-darbanga train is there
SC is no where in discussion as a train is already available for DBG from SC.
Our demand is: run this train via MAS-BZA-NGP-G-RNC-DHN-BJU (my old posts are very clear on this do't know how you are confused).
The existing route: NGP-ET-JBP-MGS-PNBE-BJU is very congested and worst in operating.
Our demand is: run this train via MAS-BZA-NGP-G-RNC-DHN-BJU (my old posts are very clear on this do't know how you are confused).
The existing route: NGP-ET-JBP-MGS-PNBE-BJU is very congested and worst in operating.