Full Site Search  
Sat Apr 29, 2017 05:22:18 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by SCR Godavari Express~
Page#    1187 Blog Entries  next>>
Departure: Yesterday @ 17:15
18645/East Coast Express (PT)
Trip# 107270    Traveller: Raj KishoreB    Linked PNR Entry# 2238846
Class: Sleeper - SL
From: BHC/Bhadrak
To: SC/Secunderabad Junction
Train Status: 18m late
Last Update: at KUR/Khurda Road Junction @ Yesterday (21:08)
Next Station: BVM/Bayyavaram
Next Halt: YLM/Elamanchili


Blog  Time-Table

1 posts are hidden. Click to open.

  
396 views
Yesterday (17:40)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2238846-2            Tags   Past Edits
Happy Journey ...

  
231 views
Yesterday (20:26)
Raj KishoreB   154 blog posts   691 correct pred (62% accurate)
Re# 2238846-3            Tags   Past Edits
Thank u frnd

3 posts are hidden. Click to open.
  
★  General Travel
0 Followers
1110 views
Apr 27 2017 (17:51)  

Swaroopmohaparta2799   13 blog posts
Entry# 2253072            Tags   Past Edits
As electrification between raichur n adoni is completed links of many trains will be changed. Also, dhone gooty track has also been fully electrified... Expected changes in links r as below
1.Sc-Ypr Garibrath express with LGD WAP4
2.Rayalaseema express with LGD WAP4 end to end
3.SBC Rajdhani express with LGD WAP7 end to end from July 1st as stated
4.Kcg-Sbc
...
more...
SF express with LGD WAP7 from dhone to Bangalore
5.Venkatadri express with LGD WAP4 from dhone to chitoor
6.Dee-Ypr Duronto express with LGD WAP7 end to end..
.......n many more....These changes may be seen from the 1st week of May
Hope to see GTL e-loco shed soon by next year....😇😇😇😊

2 posts - Thu Apr 27, 2017

  
355 views
Apr 27 2017 (18:11)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2253072-3            Tags   Past Edits
Waingana will not get sir... as it runs via KCG..

2 posts are hidden.

  
414 views
Apr 27 2017 (19:19)
Swaroopmohaparta2799   13 blog posts
Re# 2253072-6            Tags   Past Edits
Sir.... these r not yet decided.But Garibrath is gonna get a WAP4. I'm sure abt this.These day venkatadri n sbc SF r running very late....Even more than an hour due to their diesel links asboth use twin alcos n their acceleration is pathetic...So this is just a petition made to the Scr senior officers in the recent days...N also GPU is electrified..Even before raichur adoni railway line

  
414 views
Apr 27 2017 (22:17)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2253072-7            Tags   Past Edits
Okay.. if Via GPU is electrified..then no problem at all.. these will get Eloco... I thought kallur-GTL via GPU electrification is still in progress.....

2 posts are hidden.

  
175 views
Yesterday (08:17)
Queen of SWR Rani Chennamma~   2009 blog posts   726 correct pred (70% accurate)
Re# 2253072-10            Tags   Past Edits
Even Rajdhani & Duronto run via Kalluru-GTL route. If they have to get e-loco then they have to be diverted via GY.
SBC-Nanded exp runs via GY, it has chances to get e-loco.

5 posts are hidden.

  
105 views
Yesterday (13:28)
Saurabh®~   1841 blog posts   36 correct pred (68% accurate)
Re# 2253072-16            Tags   Past Edits
ok... then in dhone - ypr section they may get eloco. but , kjm shed should now be turned into eloco cum dloco shed

17 posts are hidden.
  
Rail News
0 Followers
390 views
New Facilities/TechnologySWR/South Western  -  
Apr 27 2017 (09:31)   Speed of some trains in Mysuru division likely to be increased

NEED MORE TRAINS AT BAY~   41 news posts
Entry# 2252537   News Entry# 300903         Tags   Past Edits
A proposal in this regard has been submitted to the railway headquarters for approval
Section of speeds of some trains in the Mysuru division of the South Western Railway is likely to be increased and a proposal for the same has been submitted to the railway headquarters for approval.
As per the proposal, the top speed of trains to Nanjangud, which is restricted to 70 kmph at present, will be increased to 90 kmph. This is subject to completion of ballasting which is in progress and the tentative date of completion of the
...
more...
ongoing ballasting work is June 30, 2017.
The proposal to speed up the train on the section was sent on the railway headquarters on December 30, 2016 and is expected in due course. Once the trains are speeded up, the 25-km stretch between Mysuru and Nanjangud can be covered in shorter duration as against nearly 45 minutes that it takes at present. Incidentally, the four-laning of the highway between Mysuru and Nanjangud has reduced the tedium of motoring on the road and the distance is covered in around 25 to 30 minutes by the motorists.
Similarly, for trains plying in the section between Nanjangud and Chamarajanagar, which has a route length of 35 km, the top speed at present is 70 kmph and the proposal is to increase the same to 100 kmph to reduce the running time of the trains.
The Chamarajanagar-Mysuru trains are the lifeline of the daily wagers from the rural hinterland as thousands of workers with Izzat pass use the services daily and seek employment in the construction sector.
On the Mysuru-Bengaluru section, the newly completed broad gauge double line 6-km stretch between Mysuru and Naganahalli has a speed limit of 70 kmph at present. It is proposed to increase it to 100 kmph and the tentative date of completing the ballasting work is June 30, 2017, according to railway officials.
The Hassan – Sakleshpur section, with a route length of 42 km, has a sectional speed of 65 kmph and it is proposed to increase it to 70 kmph and this is expected to be cleared once the ballasting works are completed in another two months.
Trains on the Shivamogga Town-Talaguppa sections are also to be speeded up and the current speed limit on the 97-km stretch varies from 50 kmph to 70 kmph between different points. This is to be increased to 70 kmph to 90 kmph for which the proposal has been sent to the higher authorities.

1 posts are hidden.

  
816 views
Apr 27 2017 (13:47)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2252537-2            Tags   Past Edits
Tirupati passenger has been converted to Express by speeding up 20 mins between MYS and SBC i.e. it will depart 10 mins late from MYS and reach TPTY 10 mins early... But if section speed of MYS and Chamarajanagar is increased.. it can be speeded by 15 more mins

1 posts are hidden.

  
500 views
Apr 27 2017 (16:34)
Vinay Bharadwaj*^~   4733 blog posts   953 correct pred (74% accurate)
Re# 2252537-5            Tags   Past Edits
It is 10 mins b/n MYS and SBC and 20 mins b/n MYS-TPTY. My point was from end-end. If MPS of CMNR-MYS section is increased to 90, TPTY Passenger/express can be speeded up almost by 1 hr b/n CMNR and MYS
  
General Travel
0 Followers
326 views
Apr 27 2017 (12:01)   22655/Thiruvananthapuram - H. Nizamuddin SF Express (via Alappuzha) | ANKL/Ankola (1 PFs)

TheRiderBeest   1080 blog posts   7 correct pred (100% accurate)
Entry# 2252558            Tags   Past Edits
Rare overtake!
click here

  
246 views
Apr 27 2017 (12:30)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2252558-1            Tags   Past Edits
What is the other train and the one you are on board?

  
217 views
Apr 27 2017 (12:40)
TheRiderBeest   1080 blog posts   7 correct pred (100% accurate)
Re# 2252558-2            Tags   Past Edits
MAS MAO Special and MAO MAQ Passenger.
Departure: Thu Apr 27 2017 @ 12:15
12792/Danapur - Secunderabad SF Express (PT)
Trip# 107776    Traveller: siddharthanand82^~    Linked PNR Entry# 2252290
Class: AC 2-tier - 2A
From: DNR/Danapur
To: ALD/Allahabad Junction
25 wishes
HJ Happy journey ! HJ HJ HJ HJ Sid 😎 HJ HJ HJ bro HJ HJ 😎 HJ HJ HJ HJ HJ HJ HJ HJ HJ HJ HJ HJ Happy journey bro 🤗🤗 HJ
TRIP HAS ENDED.
Blog  Time-Table

21 posts are hidden. Click to open.

  
104 views
Apr 27 2017 (12:23)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2252290-22            Tags   Past Edits
Happy Journey...

133 posts are hidden. Click to open.
  
General Travel
0 Followers
258 views
Apr 26 2017 (22:45)   16508/KSR Bengaluru - Bhagat Ki Kothi (Jodhpur) Express (PT)

Increase SL fare Reduce AC fare   387 blog posts   60 correct pred (70% accurate)
Entry# 2252067            Tags   Past Edits
One First AC Coach in 4 trains in place of SLEEPER Coach...

4 posts are hidden.

  
188 views
Apr 26 2017 (22:56)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2252067-5            Tags   Past Edits
They should have added 2A or 3A
Departure: Wed Apr 26 2017 @ 06:25
22416/Andhra Pradesh AC SF Express
Trip# 107558    Traveller: VSKP WAP7~    Linked PNR Entry# 2218756
Class: AC 3-tier - 3A
From: NDLS/New Delhi
To: VSKP/Visakhapatnam Junction
3 wishes
Happy journey HJ HJ
TRIP HAS ENDED.
Blog  Time-Table

1 posts are hidden. Click to open.

  
121 views
Apr 26 2017 (06:10)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2218756-2            Tags   Past Edits
Happy Journey boss...

30 posts are hidden. Click to open.
Departure: Mon Apr 24 2017 @ 15:55
12612/Hazrat Nizamuddin - Chennai Central Garibrath Express
Trip# 107625    Traveller: Special Status Zone~    Linked PNR Entry# 2248706
Class: AC 3-tier - 3A
From: NZM/Hazrat Nizamuddin
To: BZA/Vijayawada Junction
14 wishes
HJ HJ HJ HJ HJ HJ.bro HJ HJ enjoy the MPS action HJ HJ HJ HJ HJ HJ
TRIP HAS ENDED.
Blog  Time-Table

22 posts are hidden. Click to open.

  
239 views
Apr 25 2017 (06:48)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2248706-23            Tags   Past Edits
Happy Journey... 55 min late running SC Duranto is ahead of this Garibrath..

2 posts are hidden. Click to open.

  
267 views
Apr 25 2017 (08:10)
Special Status Zone~   192 blog posts   40 correct pred (68% accurate)
Re# 2248706-26            Tags   Past Edits
I think we may see it in BPQ.

16 posts are hidden. Click to open.
  
Rail Budget
0 Followers
821 views
Apr 20 2017 (08:10)   GNT/Guntur Junction (7 PFs)

✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~   3991 blog posts   149 correct pred (71% accurate)
Entry# 2242687            Tags   Past Edits
construction of piduguralla - savalyapuram(part of nadikudi - srikalahasti) may complete this year and start the trains...

1 posts are hidden.

  
425 views
Apr 22 2017 (21:42)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2242687-2            Tags   Past Edits
This article is about the new line connecting SC-Guntur line and Guntur-Nandyal line...

  
355 views
Apr 24 2017 (12:03)
highvoltageeee2k3~   147 blog posts
Re# 2242687-3            Tags   Past Edits
Is there anyway to know the pgresss of the line apart from reading in the papers ?

2 posts are hidden.
  
General Travel
0 Followers
702 views
Apr 23 2017 (10:27)   12214/Delhi Sarai Rohilla - Yesvantpur AC Duronto Express | NDLS/New Delhi (16 PFs)

swaroophegde5~   440 blog posts   95 correct pred (67% accurate)
Entry# 2246841            Tags   Past Edits
which train would be comfortable from nzm to sbc? is it duranto or rajdhani keeping aside the source station problem of duranto

1 posts are hidden.

  
518 views
Apr 23 2017 (14:11)
SCR Godavari Express~   2372 blog posts   11 correct pred (92% accurate)
Re# 2246841-2            Tags   Past Edits
KSK via KCG is also a good option... but it starts in the morning and reaches in the evening..

  
544 views
Apr 23 2017 (14:14)
Gajendra Sahu~   1364 blog posts   160 correct pred (81% accurate)
Re# 2246841-3            Tags   Past Edits
Now it's a worst train ,i had suffered ,always get delayed by 3 or 4 hours,see arr/depart history.

2 posts are hidden.
Page#    1187 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site