Full Site Search  
Wed Jan 25, 2017 06:59:45 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by हिसार जंक्शन
Page#    390 Blog Entries  next>>
  
Quiz
0 Followers
1131 views
2 votes
Jan 17 2017 (20:07)   24228/Varuna Express | LKO/Lucknow Charbagh NR (9 PFs)

12952 नई दिल्ली मुंबई राजधानी ➡द किंग~   5280 blog posts   280 correct pred (75% accurate)
Entry# 2130592            Tags   Past Edits
Guess the train and station.
Quiz has ENDED
Hint.- Station is in india100%2

25 posts are hidden.

  
477 views
Jan 20 2017 (10:36)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 2130592-26            Tags   Past Edits
12555/56
  
★★★  General Travel
0 Followers
12008 views
Oct 27 2015 (19:01)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 1630444            Tags   Past Edits
Headlines from today's Function of Laying of Foundation Stone for #CoachCareComplex by #RM Mr Suresh Prabhu.
The CCC contains....
- A washing line (24+2 coaches but RM announced it will be of 28 coaches)
- A sik line/Shed for fully inspection of coaches
-
...
more...
An Office Complex which is environmently green
- A Depot for daily uses instruments & Spare Parts.
The representatives of Hisar (MP-Dhusyant Chautala , MLA- Kamal Gupta) demanded of-
1-Re develop of Hisar Junction (build 115 years ago and after that no such chnages is come here)
2-Make Hisar as Head Quartr as official have to travel 600km for work which is way lone and hisar is surrounded by three division (Delhi,Ambala,Bikaner) which means we have to talk three divisions for a project to took place.
More over that the farmers are ready to give there land at Nyoli Kalan (10RKM away from HSR on HSR-BTI line )
3-Senction work for Hansi-Jind (35km) & Uklana-Narwan (29km) whose survey report has been come to GM and found feasibily positive & work for HNSI-ROK rail line.
4-Senction work for ROB's at Surya nagar & Dabra Chawk (whose DPR is done) & RUB at patel nagar.
5-Allot fund for railway line as official only senction rs 10000 For the project.
#RM Mr Suresh Prabh replies,
1-Hisar is one of the 400 station whose development is done under PPP model.
2-Hansi-ROK rail line is having some issue about land acquisition , as soon it resolved we'll be on the ground.
3- The ROB at surya nagar will be soon on earth & i believe i'll get the chance for laying the foundation stone.
4- I have senction 60 lacs for the washing line project right now and remaining will be provided as it requires.
5-A DEMU train will be run after the complition of Washing Line.
Before leaving he said , i have all the demands from the representatives as my style of work is that " I do first then i speak, qouted about her grandmother " and i am not promising right now but you'll surely see better for your city.

15 posts - Oct 2015

5 posts - Apr 2016

4 posts - May 2016

6 posts - Jun 2016

1 posts - Sun Nov 20, 2016

2 posts are hidden.

  
2181 views
Nov 20 2016 (15:58)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1630444-34            Tags   Past Edits
Update as on 20/11/2016 #Hisar
1- Front View of Washing Line
2- End View of Washing Line
3- Extension of Washing Line
4- Entry View of Sick Line
5-
...
more...
Another View of Sick Line
6- Track Laying for Washing Line
7 & 8 - Wall for washing line !!

  
1332 views
Dec 09 2016 (09:14)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1630444-41            Tags   Past Edits
Update !!

  
Dec 09 2016 (20:22)
रोहित सिंह मुंदालिया   364 blog posts   429 correct pred (65% accurate)
Re# 1630444-42            Tags   Past Edits
same design as of mumbai..# mumbai cst coaching complex (wadi bunder)

  
1182 views
Dec 11 2016 (17:10)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1630444-43            Tags   Past Edits
As of now !!
Good pace of work ...preparing materials for track laying !!

  
Jan 20 2017 (10:32)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1630444-44            Tags   Past Edits
As on 15/01/2017
Pic 1- Washing Line
Pic 2- Track laying for washing line
Pic 3- Coach Maitaince Depot
  
General Travel
0 Followers
1660 views
Dec 24 2016 (12:12)   12555/Gorakhdham SF Express (PT) | NDLS/New Delhi (16 PFs)

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 2102871            Tags   Past Edits
Jab se P4 mila h ...ye to phle se bhi gayi !!😕

  
Dec 24 2016 (12:15)
Indian Railways the life line of our Nation~   10328 blog posts   133 correct pred (85% accurate)
Re# 2102871-1            Tags   Past Edits
Lagta hai is Train ko WAP4 hazam nahi hua.

  
1513 views
Dec 24 2016 (12:24)
GZB WAP5 30036 WITH AC sf AT GORAKHPUR JN~   5043 blog posts   10 correct pred (50% accurate)
Re# 2102871-2            Tags   Past Edits
Fog+Lko nr special treatment=7hrs late................:P

  
1504 views
Dec 24 2016 (12:25)
A capella*^~   9311 blog posts   2447 correct pred (76% accurate)
Re# 2102871-3            Tags   Past Edits
haha :p iska slot aisa hai UP and Down mai ki jara bhi late hui tou OT hona tay rehta hai iska.. aur tou idea hoga hi LKO NR ka tou ye silsila jaari rahega dont wry bas ye manao ki jldi feb aa jaye taaki atleast NCR isko sahi se priority pe chala ske...
  
General Travel
0 Followers
818 views
Dec 23 2016 (11:29)   12556/Gorakhdham SF Express | CNB/Kanpur Central (10 PFs)

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 2101374            Tags   Past Edits
What happen to GD lead by P4 at Kanpur Central ...halted for almost 1 hr !
  
★★★  Info Update
Dec 03 2015 (21:50)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 1669885            Tags   Past Edits
Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
◆◆Doubling
...
more...

●RE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
●KSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
◆◆◆Overall work done 65-70%
◆◆Electrification
●Railway is setting up TSS at STD & RE
●RE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
●KSI-MHU work for pole basic structure is in progress
●MHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
●●Work for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
●● Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
◆◆◆ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
●Doubling
●Electrification
●HSR-RE Pxgr - 54835
●JP-HSR Fast Pxgr - 59721
●DEE-BDTS GR - 12215
●BDTS-DEE GR - 12216
●SLN-ADI Exp - 19404
●VARIOUS WDG LOCO PICS
●Various Station pics
#Hisar

27 posts - Dec 2015

1 posts - Jan 2016

2 posts - Feb 2016

28 posts - Mar 2016

4 posts - Apr 2016

1 posts - May 2016

5 posts - Jul 2016

3 posts - Aug 2016

16 posts - Sep 2016

3 posts - Oct 2016

11 posts - Sat Nov 19, 2016

11 posts are hidden.

  
1243 views
Nov 19 2016 (20:03)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1669885-107            Tags   Past Edits
May be it will get in last quarter of 2017

  
Nov 19 2016 (20:07)
UP me ek baar phir Akhilesh Sarkaar^~   77536 blog posts   5080 correct pred (77% accurate)
Re# 1669885-108            Tags   Past Edits
⊂_ヽ
  \\ _
   \( •_•) F
    < ⌒ヽ A
   /   へ\ B
  
...
more...
/  / \\ U
   レ ノ   ヽ_つ L
  / / O
  / / U
 ( (ヽ S
 | |、\.
 | 丿 \ ⌒)
 | |  ) /
ノ )  Lノ__
(/___

  
2205 views
Nov 19 2016 (20:25)
रोहित सिंह मुंदालिया   364 blog posts   429 correct pred (65% accurate)
Re# 1669885-109            Tags   Past Edits
rok - bnw basic structure kab se

2 posts are hidden.

  
1460 views
Dec 06 2016 (21:37)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1669885-112            Tags   Past Edits
Update by Official !!

  
1237 views
Dec 12 2016 (22:47)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1669885-113            Tags   Past Edits
TSS at STD !!
  
★★★  Info Update
1 Followers
27086 views
May 20 2015 (09:36)   BNW/Bhiwani Junction (3 PFs)

Bhiwani*^   526 blog posts   198 correct pred (76% accurate)
Entry# 1476321            Tags   Past Edits
Rewari Bhiwani Hisar Double and Electrification work Pic , eatrh work of Double line is 75-80% done upto Manheru and Poles are also reached at almost all station and upto Jharli
Pic taken on 15 May 2015

4 posts - May 2015

9 posts - Jun 2015

10 posts - Aug 2015

4 posts - Sep 2015

17 posts - Oct 2015

3 posts - Jan 2016

28 posts - Feb 2016

15 posts - Oct 2016

1 posts - Tue Dec 06, 2016

  
833 views
Dec 11 2016 (10:27)
saini100mohit   97 blog posts
Re# 1476321-95            Tags   Past Edits
Why this report is not true?

  
798 views
Dec 11 2016 (15:42)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1476321-96            Tags   Past Edits
In report saying is...Rewari-Hansi completed while it is not !! See comment by railway offical

  
771 views
Dec 11 2016 (18:47)
saini100mohit   97 blog posts
Re# 1476321-97            Tags   Past Edits
But in newspaper this news has come too

  
853 views
Dec 11 2016 (18:52)
Aditya*^~   4197 blog posts   2413 correct pred (69% accurate)
Re# 1476321-98            Tags   Past Edits
Newspaper reported about Electric signal system. whereas tweet is about Electric Traction.
so might be newspaper report is correct.

  
1364 views
Dec 11 2016 (19:44)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 1476321-99            Tags   Past Edits
Newspaper saying that electrufication bw RE-HNS has been completed !!

4 posts are hidden.
  
★  Rail Fanning
0 Followers
1280 views
Dec 11 2016 (17:24)   HSR/Hisar Junction (6 PFs) | KYN/WDG-4/12763

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 2087701            Tags   Past Edits
Special Capture for you my loving friend #1182743 Mr Jangra ji !!

  
1207 views
Dec 11 2016 (17:38)
19027 मुंबई बांद्रा टी जम्मू तवी विवेक Exp~   2973 blog posts   601 correct pred (62% accurate)
Re# 2087701-1            Tags   Past Edits
Thanks A Lot Bhai.. Great Capture..!!

  
1164 views
Dec 11 2016 (17:57)
22481 जोधपुर दिल्ली सराय रोहिल्ला सुपरफास्ट^~   2191 blog posts   244 correct pred (56% accurate)
Re# 2087701-2            Tags   Past Edits
ye 2 WDG4 kis train ke saath aaye hai ??
  
★  Rail Fanning
0 Followers
2366 views
Dec 11 2016 (17:34)   19027/Mumbai Bandra Terminus - Jammu Tawi Vivek Express | HSR/Hisar Junction (6 PFs) | VTA/WDM-3D/11543

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 2087707            Tags   Past Edits
Entering 15 min before TT at #Hisar Jn.... the Silent Killer from WR lead by VTV boy WDM-3D !!

  
Dec 11 2016 (17:38)
19027 मुंबई बांद्रा टी जम्मू तवी विवेक Exp~   2973 blog posts   601 correct pred (62% accurate)
Re# 2087707-1            Tags   Past Edits
Thanks Akki..

  
2195 views
Dec 11 2016 (17:44)
UP me ek baar phir Akhilesh Sarkaar^~   77536 blog posts   5080 correct pred (77% accurate)
Re# 2087707-2            Tags   Past Edits
pic is upside down..

  
2176 views
Dec 11 2016 (17:53)
22481 जोधपुर दिल्ली सराय रोहिल्ला सुपरफास्ट^~   2191 blog posts   244 correct pred (56% accurate)
Re# 2087707-3            Tags   Past Edits
kitna coach tha ??

  
2134 views
Dec 11 2016 (17:55)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 2087707-4            Tags   Past Edits
Fon rotate krlo bhai ...

  
2141 views
Dec 11 2016 (17:56)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 2087707-5            Tags   Past Edits
21 tha bhai
  
Info Update
0 Followers
1379 views
Nov 27 2016 (11:21)   BNW/Bhiwani Junction (3 PFs)

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 2072730            Tags   Past Edits
#Admins & #Moderator sir....Plz change the colour of ROK-BNW Section to blue ( Under Elecrification ) as he work is in progress there !!

  
1383 views
Nov 27 2016 (11:23)
IR no more Safe   17478 blog posts   93264 correct pred (74% accurate)
Re# 2072730-1            Tags   Past Edits
  
General Travel
0 Followers
1367 views
Nov 04 2016 (20:07)  

हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Entry# 2048361            Tags   Past Edits
#moderator & #Admins Sir ! I have requested to unlock my blog for many time but there is no action is taken by my respected seniors ! I request you to plz unlock my blog..so that i can provide updates !
/blog/post/1630444

  
953 views
Nov 06 2016 (19:18)
हिसार जंक्शन   1049 blog posts   11 correct pred (57% accurate)
Re# 2048361-1            Tags   Past Edits
sir plz look into this #moderaor

  
910 views
Nov 20 2016 (10:23)
रोहित सिंह मुंदालिया   364 blog posts   429 correct pred (65% accurate)
Re# 2048361-2            Tags   Past Edits
/blog/post/1630444 #moderator #admin plz unarchieve this post i want to update it
Page#    390 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site