Search Forum
Filters:
Blog Posts by enjy6321
Feb 25 2020 (12:49) 17211/Kondaveedu Express (PT) | DHNE/Dhone Junction (5 PFs)
GntGtl~
GntGtl~ 134 blog postsSoon in 7 days Pendikallu to Dhone section will be doubled.
This is the bottle neck for the express trains running between ATP to KRNT and Nandyala sections.
With this advantage we will get more and fastest trains between ATP/SBC to GNT/VSKP.
This is the bottle neck for the express trains running between ATP to KRNT and Nandyala sections.
With this advantage we will get more and fastest trains between ATP/SBC to GNT/VSKP.
1 Public Posts - Tue Mar 03, 2020
Finally the bottle neck of GTL GNT section doubled.
it will easy and increase the the traffic between GTL- GNT, Ynk- KCG, KCG- RU/TPTY. soon we will see a additional daily express train between SBC to VSKP via DHNE .
it will easy and increase the the traffic between GTL- GNT, Ynk- KCG, KCG- RU/TPTY. soon we will see a additional daily express train between SBC to VSKP via DHNE .
1 Public Posts - Wed Mar 04, 2020
Mar 01 2020 (20:25) 22708/Tirupati - Visakhapatnam AC Double Decker Express
Rajesh~
Rajesh~ 2353 blog postsThis train is running with only 10 coaches it's totally waste of resources... At least some 4-5 3tier, 2 2Tier coaches should add...
2 Public Posts - Sun Mar 01, 2020
1 Public Posts - Mon Mar 02, 2020
This is the time to add few second seating coaches to this train.
add 5 2S like Shatabdi.
5 DD + 5 2S/SL/3AC
If we combine one normal rake and existing DD rake, we will get 2 mixed rakes so that they can run this train as daily. general public will attract towards daily trains than Weeklies (by/tri).
add 5 2S like Shatabdi.
5 DD + 5 2S/SL/3AC
If we combine one normal rake and existing DD rake, we will get 2 mixed rakes so that they can run this train as daily. general public will attract towards daily trains than Weeklies (by/tri).
Feb 28 2020 (12:45) 18048/Vasco-da-Gama - Shalimar Amaravati Express (PT) | UBL/SSS Hubballi Junction (Hubli) (8 PFs)
GntGtl~
GntGtl~ 134 blog postsRSA - Rake Sharing
NO RSA . 3 ( 2 ICF + 1 Uthkrist ) Rakes. PM - PDPK
GTL to Londa doubling is completed and it can run with e-loco till GTL. Change it as SF with speed up to reach VSG by 11 am, so that the same rake will return at 2 PM. with this 3 rakes they can run as daily.
NO RSA . 3 ( 2 ICF + 1 Uthkrist ) Rakes. PM - PDPK
GTL to Londa doubling is completed and it can run with e-loco till GTL. Change it as SF with speed up to reach VSG by 11 am, so that the same rake will return at 2 PM. with this 3 rakes they can run as daily.
1 Public Posts - Fri Feb 28, 2020
PRASANTHI from BBS to SBC will returning at SBC with in 1 hour time, the SM is rake sweeping and watering done at PF.
They can have RSA with a hwh to Puri express.
They can have RSA with a hwh to Puri express.
Soon SYM/Savalyapuram will become junction for piduguralla, GNT/Guntur- GTL route.
Trail run with loco on New line successfully completed between piduguralla to vinukonda.
Trail run with loco on New line successfully completed between piduguralla to vinukonda.
Feb 04 2020 (12:19) 17211/Kondaveedu Express (PT) | NLPD/Nallapadu Junction (3 PFs)
GntGtl~
GntGtl~ 134 blog postsis the circled portion is still single line at nallapadu hope it is doubled.