Full Site Search  
Sat Mar 25, 2017 07:33:28 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by RVNL worst organization ever^~
Page#    41034 Blog Entries  next>>
  
★  General Travel
0 Followers
1319 views
Mar 16 2017 (17:58)   22122/Lucknow - Mumbai LTT AC SF Express

RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Entry# 2199735            Tags   Past Edits
2014 m announce hui train finally 2017 me start hogi.... After delay of 3 years.

9 posts - Thu Mar 16, 2017

  
760 views
Mar 17 2017 (00:42)
Bina Jn   159 blog posts
Re# 2199735-10            Tags   Past Edits
Bina Jn. Per halt dena chahiye tha is train ka.

  
726 views
Mar 17 2017 (00:59)
I hate Yogi in reality bt his work proves me wrong^~   32110 blog posts   22996 correct pred (76% accurate)
Re# 2199735-11            Tags   Past Edits
Try to click Inaugural run

  
578 views
Mar 18 2017 (12:59)
Saif Ali^~   7148 blog posts   129 correct pred (76% accurate)
Re# 2199735-12            Tags   Past Edits
Booking Kab khulegi?

  
436 views
Mar 18 2017 (16:07)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2199735-13            Tags   Past Edits
8 April ko inaugural Hai to shyad usse 3-4 din pehle shuru hogi

  
93 views
Yesterday (23:22)
vfirke~   613 blog posts   11 correct pred (73% accurate)
Re# 2199735-14            Tags   Past Edits
Finally the regular special gets regularised :P
  
Rail Fanning
0 Followers
91 views
Yesterday (22:23)   AEL/Ateli

RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Entry# 2209698            Tags   Past Edits
Owner @RailAteli on twitter
  
★  Info Update
0 Followers
661 views
Yesterday (18:25)   12558/Sapt Kranti SF Express (PT) | GKP/Gorakhpur Junction (10 PFs)

Aditya   3352 blog posts   14730 correct pred (79% accurate)
Entry# 2209386            Tags   Past Edits
DRMLJN Reply On Sapt Kranti Express Eloco Issue.

9 posts are hidden.

  
98 views
Yesterday (20:57)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2209386-11            Tags   Past Edits
lagta hai bgkt emd aur sappu thode din aur sath-sath ghumenge....

  
94 views
Yesterday (21:00)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2209386-12            Tags   Past Edits
Aaj sappu ko talgo loco Mila hai

8 posts are hidden.

  
123 views
Yesterday (22:03)
Aditya   3352 blog posts   14730 correct pred (79% accurate)
Re# 2209386-21            Tags   Past Edits
Ji Haan,Amrish Puri Sir Ka Dialogue Yaad Aa Gaya,"जा सप्पू जा जिले अपने भगत की कोठी के साथ ओये"😀😂🙏

  
159 views
Yesterday (22:04)
Aditya   3352 blog posts   14730 correct pred (79% accurate)
Re# 2209386-22            Tags   Past Edits
20089 The Great😍

5 posts are hidden.
  
Timeline
0 Followers
27 views
Yesterday (20:25)   Rajgir Danapur Passenger (UnReserved)/53229   Train - Regular/Technical Halt - HRT/Harnaut (3 PFs)

sauryasharma999~   4 Conf TLs   3 Void TLs
HRT/Harnaut (3 PFs); Regular Stop; Arrival: 07:03; Departure: 07:08

1 posts are hidden.

  
65 views
Yesterday (20:38)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2209496-2            Tags   Past Edits
source of timings ?
  
Rail News
0 Followers
394 views
New Facilities/Technology
Yesterday (10:15)   To boost fare revenue, Indian Railways may allow private passenger trains to use its tracks once DFCs become operational

a2z~   19 news posts
Entry# 2209024   News Entry# 297431         Tags   Past Edits
To accelerate its eroding fare revenue, the Indian Railways (IR) plans to allow private passenger trains, luxury trains and container operators to use its existing tracks once the dedicated freight corridors (DFCs) become operational, as it will move 70% of the freight traffic to the new routes.
While one railway official said there is a definite thinking in this direction and a study is already going on for utilisation of the released capacity on the IR network, another railway official confirmed that the carrier is open to all such possibilities. Both officials spoke on the condition of anonymity.
Though
...
more...
private container operators, albeit a few, already use the IR network by paying haulage charges, “private passenger train operators are yet to come in India”, said the first official quoted above. The Dedicated Freight Corridor Corporation of India (DFCCIL), a special purpose vehicle of the Indian Railways, has been mandated to develop six DFCs across the country, of which the Eastern DFC and the Western DFC are under construction at present, with funding assistance from the World Bank and Japan International Cooperation Agency, respectively.
The total track length of the two DFCs is around 3,300 km. The surveys of the other four DFCs are done, but the work is yet to start.
These DFCs, 80% of which will be built aligned to the existing IR tracks, will carry 70% of the existing freight traffic of the railways which will result in huge released capacity. “If you do not want to invest in rolling stock, you can lease these spaces to private parties,” said the first official. By December 2020, both the Easter DFC and Western DFC will be operational, though sections of each corridor will be commissioned as and when they are ready.
Once the slow-moving freight traffic moves to DFCs, the speed differential will come down drastically. “Right now there is a Gatimaan Express running at 160 km per hour and also others running at 75 km per hour, and goods train at 25 km per hour. Now, if these goods trains are taken off the IR track, there will be only express trains running at high speed. So, speed difference will be minimum. As a result, the throughput will increase as there could be more number of trains. If there are trains running at same speed, the sectional capacity goes up,” said the first official.
A consultant, which is a consortium, is being hired to recommend the possible ways to monetise the released capacity and the revenue potential is expected to be substantial.
Sectional capacity is referred to in terms of paths, which means the number of trains that can be pushed into a section. It is different for each section as some may predominantly have only passenger trains, and capacity released will be lower.
The Indian Railways’ freight-loading target for 2017-18 is 1,165 mt, a meagre increase of 71.5 mt from the revised estimate for 2016-17. The earnings from goods, contributing around 60% of the transporter’s total traffic receipts, have been estimated to be R1.18 lakh crore for 2017-18 compared with an estimated R1.17 lakh crore in 2016-17. The passenger revenue, meanwhile, at R50,125 crore is a little below last year’s target.

7 posts are hidden.

  
251 views
Yesterday (19:15)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2209024-8            Tags   Past Edits
DFC takes 10-15 years
5 years for full planning
And then 10 years for construction.
  
General Travel
0 Followers
279 views
Yesterday (11:28)   SOE/Sheopur Kalan (1 PFs)

RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Entry# 2208906            Tags   Past Edits
Gwalior Sheopur Kalan work to start soon

  
198 views
Yesterday (13:22)
YAM1YCG1   41 blog posts
Re# 2208906-1            Tags   Past Edits
Can you provide the link to the document?

  
120 views
Yesterday (17:15)
Bina Jn   159 blog posts
Re# 2208906-2            Tags   Past Edits
30 cr me 680 hectare zameen ye kya mazak hai.
  
★  Info Update
0 Followers
737 views
Yesterday (15:55)   12816/Nandan Kanan Express | NDLS/New Delhi (16 PFs)

I hate Yogi in reality bt his work proves me wrong^~   32110 blog posts   22996 correct pred (76% accurate)
Entry# 2209223            Tags   Past Edits
From 1st April #Vikalp scheme is being further expanded to provide shifting waiting list pass of 1 train across all categories of trains..
Source-click here

3 posts are hidden.

  
351 views
Yesterday (16:31)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2209223-8            Tags   Past Edits
Station also

  
367 views
Yesterday (16:48)
DhnEcr~   4907 blog posts
Re# 2209223-9            Tags   Past Edits
The circular stated can be nearby station too, but booking upto Rajdhani halts isn't bad either. As u can deboard at any station of yr preference, even at unscheduled halt. But seriously pity the Railways stubborness to fill empty seats with low sf passenger but still continue with DYNAMIC fare.

5 posts are hidden.
  
General Travel
0 Followers
104 views
Yesterday (16:36)  

RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Entry# 2209263            Tags   Past Edits
रेलवे की वर्तमान ट्रेन समय सारणी की वैधता 30 सितंबर, 2017 तक बढ़ी, 01 अक्टूबर, 2017 से लागू होगी नई ट्रेन समय सारणी
  
General Travel
0 Followers
404 views
Yesterday (14:57)   22679/Yesvantpur - Hassan Intercity Express

Venkat వెంకట్   2585 blog posts
Entry# 2209173            Tags   Past Edits
WOW 63 KMPH avg speed, super speed for a new line.

  
177 views
Yesterday (15:17)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2209173-1            Tags   Past Edits
new line has no congestion, empty tracks, Highest priority.

2 posts are hidden.

  
148 views
Yesterday (15:48)
Venkat వెంకట్   2585 blog posts
Re# 2209173-4            Tags   Past Edits
But many new tracks with single trains has less avg speeds. Like DMM-Pakala

1 posts are hidden.

  
155 views
Yesterday (16:09)
March Madness~   623 blog posts   28 correct pred (83% accurate)
Re# 2209173-6            Tags   Past Edits
think they will divert BTPGLN Tanker consist via this route from MAQ port to devangothi,and freight too

5 posts are hidden.
  
General Travel
0 Followers
357 views
Yesterday (11:51)   14155/Kanpur - Udhampur Express

Meri Rail   45 blog posts
Entry# 2208935            Tags   Past Edits
14155 >> 24155
ye superfast kaise hogi....?
Superfast trains ka number to 12 ya 22 se shuru hota hai ....

7 posts are hidden.

  
164 views
Yesterday (15:05)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2208935-8            Tags   Past Edits
old no 14155
new no 24155
2 indicates superfast..

  
168 views
Yesterday (15:06)
RVNL worst organization ever^~   79586 blog posts   5092 correct pred (78% accurate)
Re# 2208935-9            Tags   Past Edits
new no already allotted 24155 means superfast.

  
120 views
Yesterday (15:55)
Meri Rail   45 blog posts
Re# 2208935-10            Tags   Past Edits
2 nhi 12 & 22 indicates sf...

1 posts are hidden.
Page#    41034 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site