Full Site Search  
Sat May 27, 2017 19:26:18 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by Break from RF~
Page#    1822 Blog Entries  next>>
  
★★  Rail Fanning
0 Followers
2953 views
Mar 26 2017 (16:17)   12049/Gatimaan Express | AGC/Agra Cantt. (6 PFs) | GZB/WAP-5/30020

↪ abbas*^~   4091 blog posts   450 correct pred (73% accurate)
Entry# 2211502            Tags   Past Edits
Gatimaan's Loco Link Ghaziabad WAP-5 #30020 in "Blood Stains" waiting for Cleaning and Inspection At Agra Cantt, after Colliding & mowing down 2 Neelgai (Blue Bull) near Kitham Yesterday. Train was detained for 25 Minutes and Got Lt by 13 min at AGC.
This was it's Third Accident at the Same Site over the period of One Year. In news reports it was mentioned CattleGuard Was Damaged, Seeing it at the AGC i'm Not sure about it.
At the Front Air brake Pipes are missing also One can Find the
...
more...
remains of the Bull behind the coupler of the Loco and the Blood Stains at top of the loco.

11 posts are hidden.

  
Mar 29 2017 (15:54)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2211502-12            Tags   Past Edits
for 160 fit rake test you need to testing at 180 (176 actually i.e. 10% greater than MPS of rake). this in fact did happen with gatiman, before its launch one of its final test was done at 180 Kmph, so the tracks can withstand 180. The OHE is having issues though, so nothing is going to go beyond 160 for now.

  
1538 views
Mar 29 2017 (15:58)
©The Dark Lord™~   7144 blog posts
Re# 2211502-13            Tags   Past Edits
Tension not for OHE...:D CLW is working on to develop 200 km/hr capable diesel Locomotive.

  
1404 views
Mar 30 2017 (00:47)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2211502-14            Tags   Past Edits
nice way to circumvent the whole issue :P
Highly salivating prospect as a D-loco fan to see EMD's thunder by at 200 :)

  
775 views
Apr 30 2017 (19:07)
2238722388 Black Diamond Express deserves LHB~   705 blog posts   39 correct pred (80% accurate)
Re# 2211502-15            Tags   Past Edits
WDP4s touched 200 right ?

1 posts are hidden.
  
Rail News
0 Followers
2135 views
Other NewsECR/East Central  -  
Apr 22 2017 (09:03)   सुस्त गति से चल रहा प्लेटफॉर्म का निर्माण

Tushar Shandilya~   254 news posts
Entry# 2245437   News Entry# 300395         Tags   Past Edits
सहरसा: पूर्व मध्य रेल सहरसा में प्लेटफार्म निर्माण कार्य सुस्त गति से चल रहा है। तीन महीने से अधिक दिन हो गए, लेकिन प्लेटफॉर्म निर्माण कार्य पूरा नहीं हो पाया है। 590 मीटर लंबाई में बनने वाले अब प्लेटफार्म में मिट्टी भराई कार्य चल रहा है। हालांकि प्लेटफार्म नंबर तीन के अलावा चार एवं पांच प्लेटफार्म पर जमीन भी नहीं बनीं है। रेल निर्माण विभाग के देख रेख में चल रहे निर्माणाधीन प्लेटफार्म निर्माण कार्य में प्लेटफार्म का किनारा हिस्सा को बनाया जा रहा है। पूर्व मध्य रेल सहरसा-थरबिटिया रेलखंड के बीच आमान परिवर्तन कार्य को लेकर सहरसा में नये तीन प्लेटफार्म का निर्माण कार्य दिसंबर 16 माह में ही शुरू किया गया। 31 मार्च 17 तक आमान परिवर्तन कार्य को पूरा करने का लक्ष्य निर्धारित था, लेकिन तीन माह गुजरने के बाद भी अब तक पचास प्रतिशत काम भी नहीं हो पाया है। है।
----------------------------
...
more...

नहीं बना फुट ओवरब्रिज
सहरसा स्टेशन पर प्लेटफार्म निर्माण कार्य को लेकर पांच नंबर प्लेटफार्म से प्लेटफार्म नंबर एक पर जाने के लिए फुट ओवरब्रिज बनना प्रस्तावित है। सहरसा स्टेशन पर पूर्व से एक फुट ओवरब्रिज पहले से ही है। आमान परिवर्तन कार्य को लेकर प्लेटफार्म नंबर पांच से सीधे प्लेटफार्म नंबर एक पर जाने के लिए एक ओवरब्रिज बनाने का काम तीन महीने से अधिक दिन गुजर गए लेकिन काम शुरू नहीं किया गया। दूसरा फुटओवरब्रिज पूर्व के फुट ओवरब्रिज से जोड़ने की तैयारी में रेल प्रशासन है।
----------------------------
तीन नए प्लेटफार्म का निर्माण कार्य युद्ध स्तर पर चल रहा है। समय रहते ही प्लेटफार्म निर्माण कार्य पूरा कर लिया जाएगा।
वाचस्पति उपाध्याय, कार्यपालक अभियंता, रेल निर्माण

18 posts - Sun Apr 23, 2017

  
376 views
Apr 23 2017 (14:50)
BRC WAP 7~   668 blog posts   743 correct pred (78% accurate)
Re# 2245437-19            Tags   Past Edits
What u mean to say ?

  
389 views
Apr 23 2017 (14:50)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2245437-20            Tags   Past Edits
english kamzor hai??? Ki marathit bolu???

  
400 views
Apr 23 2017 (14:52)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2245437-21            Tags   Past Edits
WR doesn't treat its stations equally, and definitely not MCT division.
if you stay south of Virar, life is good. If you stay north of it life gets screwed as you have few trains and many of those have pathetic quotas for the intermediate stations.

  
462 views
Apr 23 2017 (14:55)
BRC WAP 7~   668 blog posts   743 correct pred (78% accurate)
Re# 2245437-22            Tags   Past Edits
Very first here the debate is on division maintaence and not on occupancy or intermediate stsn

  
515 views
Apr 23 2017 (14:58)
BRC WAP 7~   668 blog posts   743 correct pred (78% accurate)
Re# 2245437-23            Tags   Past Edits
And for north sides there is quite better facility from VR itself.
EMU ppassenger are there so there is no difficulty at that route also
Infact WR gives more priorities to its route with compare to CR
As CR still do not have any bombardier rake on its teritory

7 posts are hidden.
  
General Travel
Apr 20 2017 (16:56)  

Iri rules are different in different cases^~   81853 blog posts   5227 correct pred (78% accurate)
Entry# 2243392            Tags   Past Edits
#Karnataka many new trains

15 posts are hidden.

  
431 views
Apr 23 2017 (14:50)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2243392-16            Tags   Past Edits
Even JnS shows availablity till last day (when i traveled i booked my tickets on previous day and got window seats :P) but on day of travel the train was completely filled up and the TTE threw some people out who didn't have valid ticket.

6 posts are hidden.
  
General Travel
0 Followers
2436 views
Apr 23 2017 (11:12)   HRI/Hardoi (5 PFs)

भूत हूँ मैं~   3445 blog posts   3082 correct pred (82% accurate)
Entry# 2246900            Tags   Past Edits
I was going through the U.P. map, and thought an idea about making this station as the junction station, as shown in the map. This new route can also be the alternative to congested NDLS-CNB route, especially for CNB terminating trains, coming from NDLS side.
Example Shram Shakti Express, via GZB-MB-BE-HRI-ON-CNB. This overall route may take 8 hours for a superfast, but will improve the timings for NDLS-CNB pax of this train.
Also the trains from Farukhhabad (like JP-LJN Express) can come to Hardoi directly from Farukhhabad, skipping CNB (JP-CNB section
...
more...
already have too many trains).
Among BSK, Vaishali, Gorakhdham etc, those take LKO-CNB-ETW-TDL route, a one or two can be diverted via LKO-HRI-FBD-SKB-TDL route. With so many trains from NDLS and Bihar to CNB, I dont think CNB will have any problem in diverting 1-2 trains.
In future, after electrification and speed upgradation of the section, Even a few Rajdhani's can also be diverted through this route.
Also, Can be an alternate NDLS-ALD route via: MB-BE-HRI-ON-UCR.
Suggestions please.

5 posts are hidden.

  
395 views
Apr 23 2017 (14:42)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2246900-6            Tags   Past Edits
alternative routes exist even now, the primary issue is of MPS.
unfortunately, even the new lines being built aren't being build with an eye on the future and most of them are at most 110 fit; many are usually cleared for 80 or 100
As sanjeev sir said below, even if the main alternative route is made 130 fit it will go a long way in alleviating the problems of the people, beside giving the people on the alternative line faster options to travel, but no steps are being taken in that regard.

23 posts are hidden.
TRIP HAS ENDED.
Blog  Time-Table

2 posts are hidden. Click to open.

  
975 views
Apr 23 2017 (01:42)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 1790520-3            Tags   Past Edits
Current Booking section on Indianrail site.
  
★★  Rail Fanning
0 Followers
1317 views
Apr 21 2017 (23:26)   TATA/Tatanagar Junction (5 PFs)

SRKs upcoming The Ring 😊^~   34421 blog posts   28151 correct pred (78% accurate)
Entry# 2245243            Tags   Past Edits
SureshPPrabhu flags off India's first privately operated freight train from Tata Steel Ltd Jamshedpur plant...
Source-click here

  
343 views
Apr 22 2017 (00:02)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2245243-2            Tags   Past Edits
why private sector in an already profit making business?

  
346 views
Apr 22 2017 (00:04)
SRKs upcoming The Ring 😊^~   34421 blog posts   28151 correct pred (78% accurate)
Re# 2245243-3            Tags   Past Edits
railway private companies ko apni khud ki freight trains chalane k ly invitation de rha h taaki usse aur profit mile

  
372 views
Apr 22 2017 (00:05)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2245243-4            Tags   Past Edits
any idea about profit sharing model?
also, who supplies the rake?? i guess tata steel would own and operate this

5 posts are hidden.

  
687 views
Apr 22 2017 (14:25)
Tabbys star and the Alien outpost~   2548 blog posts
Re# 2245243-10            Tags   Past Edits
The Idea is that organizations offering logistics services, will utilize the Special Freight Train Operator (SFTO) scheme to support their customers. The rakes will be privately owned by the SFTO or leased over to them for a stipulated period and are not put into IR's wagon pool. TATA steel would be running this freight to other SFTO terminals ( which are privately owned ) or non-SFTO owned private terminals subject to IR's approval.
The SFTO's will charge their customers for the railway haulage and other operational costs. In turn, IR would charge the normal freight loading charges from the SFTO. These freights will be served on a first-cum-first-serve basis and IR will ensure that the freights are
...
more...
not delayed beyond the stipulated time.
RDSO recently developed new, high capacity BFNSM (22.9 ton axle load) rakes to specifically cater to the SFTO ventures and operations on the DFC.
  
General Travel
0 Followers
1375 views
Apr 21 2017 (20:09)  

भूत हूँ मैं~   3445 blog posts   3082 correct pred (82% accurate)
Entry# 2245034            Tags   Past Edits
I myself edited and cutshort the number of zones from 17 to 9. Just see between these 2, which is would be more apt? The one with NWR and ECR or the one with NCR and NFR?

15 posts - Sat Apr 22, 2017

  
260 views
Apr 22 2017 (01:14)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2245034-17            Tags   Past Edits
but Mumbai has EMU's, which also means most of the passengers in WR's network are actually those who travel in locals :P I sometimes doubt a single zone can manage operations of entire Mumbai while also handling rest of MH, already CR is getting stretched thin here.
many people suggest that the region around Mumbai should be separated from from both CR and WR, and operated as single entity, that would finally allow them to focus on EMU's more without bothering about other areas, though that opinion isn't very popular with people who stay there. :P

  
260 views
Apr 22 2017 (01:17)
JBP ET OHE OMG 😲 SUPPORTS KKR 😎~   12818 blog posts   22 correct pred (42% accurate)
Re# 2245034-18            Tags   Past Edits
That could be a very good step
Supervise the cr & wr local under another new head & let cr focus more on rest of MH & adi as on a central location be the wr hq

  
262 views
Apr 22 2017 (01:21)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2245034-19            Tags   Past Edits
1 compliments
Lol 😆😆
yep, but it isn't a very popular opinion with people who stay here :P
there were rumours about WR's HQ being shifted to ADI in the early days of Modi rule, the people and political parties almost unanimously objected and the Railway ministry clarified that no such move was on cards.

  
288 views
Apr 22 2017 (01:23)
JBP ET OHE OMG 😲 SUPPORTS KKR 😎~   12818 blog posts   22 correct pred (42% accurate)
Re# 2245034-20            Tags   Past Edits
People won't allow anything to change from current scenario
Railway would have to take tough decisions
Although wr's handling is going onn smooth so no problem visible in near future

8 posts are hidden.

  
399 views
Apr 22 2017 (10:11)
©The Dark Lord™~   7144 blog posts
Re# 2245034-38            Tags   Past Edits
Itihaas gawah hai, kamata koi aur hai or khata koi aur. Lower OR waale zones se freight earnings jyada hai to Railway ko lagta hai ki wahan aadmi rehte hi nahi hai. IR ka sabse jyada ghate me chane wala zone NER ko haal filhaal me jis tarah Chappar phar ker trains mile hai usse saaf hai ki Politics hai deciding factor na ki Operating ration or profitability.
  
★  Rail Fanning
0 Followers
1572 views
Apr 21 2017 (21:27)   12371/Howrah - Jaisalmer SF Express | RE/Rewari Junction (8 PFs) | BGKT/WDG-4/12193

rdb*^   31277 blog posts   374164 correct pred (80% accurate)
Entry# 2245134            Tags   Past Edits
Nearing Rewari - the hub of EMD actions

1 posts are hidden.

  
1362 views
Apr 21 2017 (22:43)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2245134-2            Tags   Past Edits
most probably because he was on board
  
General Travel
0 Followers
1296 views
Apr 21 2017 (01:28)   12137/Punjab Mail (PT) | CSTM/Mumbai Chhatrapati Shivaji Terminus (18 PFs) | GZB/WAP-5/30005

♕ ❤️ ⚡ WAP5™ ⚡ ❤️ ♕   6514 blog posts   278 correct pred (91% accurate)
Entry# 2243957            Tags   Past Edits
And again....(20/04/2017) 😎😎😎
The WAP5 mania continues 😋😋

  
1287 views
Apr 21 2017 (01:32)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2243957-1            Tags   Past Edits
1 compliments
Seems so 😂
engaged to 30005 :P
  
General Travel
0 Followers
1874 views
Apr 20 2017 (11:24)   19041/Mumbai Bandra Terminus - Ghazipur City Weekly Express

rajeshphilip0824   145 blog posts   12 correct pred (63% accurate)
Entry# 2242897            Tags   Past Edits
How can WR be merciful to give halt of this train at valsad station?? I think there is some mistakes time table printing :P

2 posts are hidden.

  
1322 views
Apr 21 2017 (01:17)
Break from RF~   2913 blog posts   1269 correct pred (71% accurate)
Re# 2242897-3            Tags   Past Edits
makes sense, but 2 minutes for crew change isn't something anyone would think.
is GGC crew also going to handle this train??

2 posts are hidden.
Page#    1822 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site