Full Site Search  
Mon May 29, 2017 20:39:00 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by Waiting for UBL MAQ exp~
Page#    1403 Blog Entries  next>>
  
General Travel
0 Followers
259 views
May 27 2017 (18:18)   17325/Vishwamanava Express

Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Entry# 2295668            Tags   Past Edits
Running with 2 AC coaches in the end today, must be for POH at Ashokapuram Workshop.

  
167 views
May 27 2017 (20:30)
Ragi Sangati and Mutton Pulusu   249 blog posts
Re# 2295668-1            Tags   Past Edits
Any pics of the train?
  
Rail News
0 Followers
160 views
Commentary/Human InterestSWR/South Western  -  
Jul 05 2014 (08:51)   Belgaum – Dharwad new railway line details

rdb*^   129386 news posts
Entry# 2295641   News Entry# 183308         Tags   Past Edits
The much awaited details of the Belgaum – Dharwad new railway line - The 97 kms stretch will need Rs.545.550 crores and the Rate of return estimated by railways is 7.08%. The first basic survey was done in 2003. The survey was submitted to the Railway board for approval and also the planning commission in 2012.
Belgaum Dharwad New rail line map
There would be 13 stations in-between Belgaum and Dharwad namely: Halga, Ganikoppa, Tigudi, Sampagaon, Bailvadi, Bailhongal, Naginhal, Hunshikatti, Kittur, Teguru, Heggeri, Mommingatti, Kyrakop. Belgaum is proposed to be made as a
...
more...
junction along with Kyrakop. It is to be seen in this years budget if any allocation is made for the actual work to commence.

  
164 views
May 27 2017 (17:54)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2295641-1            Tags   Past Edits
Any news about this new line ??
  
General Travel
0 Followers
1270 views
May 24 2017 (18:18)   17325/Vishwamanava Express

Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Entry# 2291043            Tags   Past Edits
Running with KJM WDP4D and the train is running with good patronage, seen at NYH.

7 posts - Wed May 24, 2017

9 posts are hidden.

  
612 views
May 25 2017 (09:54)
IR no more Safe^~   21851 blog posts   97878 correct pred (75% accurate)
Re# 2291043-12            Tags   Past Edits
any PR mentioned this name for this ?

2 posts are hidden.

  
May 27 2017 (09:48)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2291043-15            Tags   Past Edits
The South Western Railway has named the newly introduced Hubballi-Mysuru train (number 17325/17326) that runs via Bengaluru as 'Vishwamanava Express’.
The name was suggested by journalist Krishna Prasad, who explained the christening of the train in his blog. "(Mysuru MP) Pratap Simha had called for suggestions. His own picks were Kapila Express (after the river which supplies much of Mysuru’s drinking water), Nalwadi Express (after Maharaja Nalwadi Krishnaraja Wodeyar), and Ambari Express (after Dasara motif),” he wrote.
Though they considered the name 'Mysore Mallige Express’, they abandoned it "because some punster might call
...
more...
it 'Mysore Mellage’ if the train runs late”.
"Eventually, we went literary and zeroed in on 'Vishwa Manava Express’,” Prasad wrote.
"Vishwa Manava’ was the idea espoused by Kuvempu which he explains in an essay: "Every child, at birth, is the universal man. But, as it grows, we turn it into a 'petty man’ (through caste, creed, religion and race). It should be the function of education to turn it into the original 'universal man’.”
The South Western Railway has decided to temporarily augment with one second class sleeper coach for train no. 82653 Yeshwantpur-Jaipur Suvidha Weekly Express with effect from June 22 to September 21 and train no. 82654 Jaipur-Yeshwantpur Suvidha Weekly Express with effect from June 24 to September 23.
Train no. 82653/82654 Yeshwantpur-Jaipur-Yeshwantpur Suvidha Weekly Express will have the revised composition of two AC 2-tier coaches, four AC 3-tier coaches, 10 second class sleeper coaches, one pantry car and two luggage-cum-brake van with generator.
South Western Railway will also permanently augment with one AC-3 tier coach for Train No. 17323 Hubballi-Varanasi Weekly Express with effect from June 2 and 17323 Varanasi-Hubballi Weekly Express with effect from June 4.
Train No. 17323/17324 Hubballi-Varanasi-Hubballi Weekly Express will have the revised composition of one AC 2-tier coach, two AC 3-tier coaches, six second class sleeper coaches, six general Second class coaches, two second class luggage-cum-brake van with disabled friendly compartment.
- See more at: click here

  
299 views
May 27 2017 (13:58)
UBL ICE~   440 blog posts
Re# 2291043-16            Tags   Past Edits
"journalist Krishna Prasad" ---- is it our IRI Admin?

  
264 views
May 27 2017 (16:01)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2291043-17            Tags   Past Edits
I too think he is our own KNK Prasad sir.

1 posts are hidden.

  
197 views
May 27 2017 (16:52)
Vishwamanava Express   5 blog posts
Re# 2291043-19            Tags   Past Edits
not IRI Admin Krishnaprasad
Journalist Krishnaprasad from famous Churumuri blog
  
★  Info Update
0 Followers
1821 views
May 26 2017 (13:04)   22140/Solapur - Mumbai CST SF Express | SUR/Solapur (5 PFs)

Solapur Superfast~   1655 blog posts   66 correct pred (71% accurate)
Entry# 2293786            Tags   Past Edits
In yesterday's meeting with Solapur MP Mr. Sharad Bansode at DRM office, it is decided that SUR Division will be sending proposal of Solapur - Pune - Solapur new Intercity Express due to increased demand in this route.
It is brought to notice that rake of 22139/40 is idle at Solapur for whole day. So CR is decided to use that rake for running day time Intercity between Solapur and Pune with Kurduwadi, Jeur & Daund hault.
Timings of this train likely to be reverse of 12169/70 in both directions.
...
more...

5 posts are hidden.

  
391 views
May 27 2017 (16:18)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2293786-7            Tags   Past Edits
Instead of SUR-UBL ICE, extension of Mumbai-SUR exp is sought till GDG. And the rake of SUR-UBL ICE can be used to run SUR-Pune ICE.

18 posts are hidden.
  
General Travel
0 Followers
151 views
May 27 2017 (13:03)   17318/Mumbai LTT - Hubballi Express (Via Belagavi)

Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Entry# 2295263            Tags   Past Edits
Some problem in Belagavi-Londa-Alnavar section, today it took 2.5hrs to cover BGM-Londa. Also Chalukya is delayed by 2hrs today in this section.
  
General Travel
0 Followers
728 views
May 26 2017 (15:38)  

Prometh Suresh~   284 blog posts   366 correct pred (58% accurate)
Entry# 2294022            Tags   Past Edits
When will doubling work at Shrirangapattana and electrification work b/w Yeliyur and Mysore be completed?

15 posts are hidden.

  
207 views
May 27 2017 (09:41)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2294022-19            Tags   Past Edits
I think we can expect e loco for Night Queen pass too.
  
★  General Travel
0 Followers
737 views
May 26 2017 (20:33)  

New train should be sanctioned for Gangavati~   142 blog posts   3 correct pred (33% accurate)
Entry# 2294465            Tags   Past Edits
Beautiful carving of SWR in Gangavathi-Ginigera line
ONLY FOR SWR and SCR railfans!Watch out
Updates of
1)Hubli-Gadag doubling
2)Ginigera-mahbubnagar line (chikkabenakal-Gangavati-Sindnoor line)
3)Hospet-Bellary-guntakal
...
more...
electrification
1}Pic-1 :Carving of SWR
From chikkabenakal upto 8 km fully completed.The other 4 km bars have been accumulated.Station building going in rapid pace.
Expected time of completion upto Gangavati-March2018
From Gangavati to karatgi fully levelled and track accumulation going on.
Expected completion-2018 end
Karatgi to sindnoor levelling going on In a rapid pace
Expected date of completion-2018 end
2} Hubli gadag doubling
From hebsur to annigeri almost doubled
From bhanapu to koppal almost doubled
Expected completion-This year end
3} Hospet bellary guntakal electrification
From guntakal to haddinagandu wiring can seen in a rapid pace
Guntakal West will be the substation
No signs of electrification from Hospet to bellary
thanks for going an opportunity to post in iri.com

2 posts are hidden.

  
456 views
May 26 2017 (23:23)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2294465-3            Tags   Past Edits
Sir, what about Tungabhadra bridge at Hosapete, is the bridge ready ??

  
May 27 2017 (08:25)
New train should be sanctioned for Gangavati~   142 blog posts   3 correct pred (33% accurate)
Re# 2294465-4            Tags   Past Edits
Can see bridge building taking place.I think it's almost done.

1 posts are hidden.
  
★★★  General Travel
0 Followers
1642 views
May 26 2017 (11:41)   GR/Gulbarga (4 PFs)

skumarvkulkarni~   1674 blog posts
Entry# 2293605            Tags   Past Edits
Updates on Bidar Gulbarga New line at Sultanpur Station(Outskirts of Gulbarga)
- All platform works completed with FUB..
- LED lights are shining
- Huge Goods shed is almost ready( the existing Gulbarga station Goods shed will be shifted to Sultanpur Station soon)
-
...
more...
Once the Goods shed at Gulbarga is shifted to Sultanpur station(outskirts of gulbarga on Bidar line), there will be some space for stabling lines at GR station
- Sultanpur station looks to have 3 platforms (the third one may be used for Goods stabling)
- Overall works looks excellent as usual nothing to mention since its SCR line!

  
876 views
May 26 2017 (11:44)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2293605-1            Tags   Past Edits
Sir, When are they going to open this new line ??
Any info about the construction of pit lines at Bidar ?? When will it get ready??

1 posts are hidden.

  
May 26 2017 (12:41)
skumarvkulkarni~   1674 blog posts
Re# 2293605-3            Tags   Past Edits
As per latest the Line commissioning dead line is August 2017( next 3-4 months). And pit line at Bidar(Khanapur) all civil works is done already may be they ware waiting for some grand day to open... nearing elections... as few more things need big band opening like Yadgir Railway factory, Bidar-Gulbarga new line, Gulbarga-Wadi electrification, Bidar Pit line, and Gulbarga Railway division (?????)...

16 posts are hidden.
  
★  Rail News
0 Followers
3178 views
Commentary/Human InterestSWR/South Western  -  
May 20 2017 (09:05)   ‘Will consider demand for train between Hubballi & Mangaluru’

rdb*^   129386 news posts
Entry# 2284061   News Entry# 302974         Tags   Past Edits
Trains from Hubballi to Varanasi, Mysuru to be introduced
Minister of State for Railways Manoj Sinha has promised to consider favourably a demand for introducing a train between Hubballi and Mangaluru to provide connectivity between the coastal and interior regions of Karnataka.
Replying to a demand by Pralhad Joshi, MP, at a ceremony to release a stamp brought out by the India Post to commemorate the 150th birth anniversary of the saint Hanagal Kumaraswamy here on Friday, Mr. Manoj Sinha said that he would try his best to consider this demand and see
...
more...
that a train was run between these two cities of the State.
Saying that this demand had been made by people of this region as well as that of the coastal belt, Mr. Joshi said that Hubballi was already connected with Mysuru and Bengaluru by train and the department of Railways has also fulfilled the demand for introducing new trains to Varanasi and Mysuru.
He has also urged the Minister to consider another demand for introducing the train between Hubballi and Mangaluru.
Later, Mr. Joshi told The Hindu that he had briefed the Minister regarding the need for running a train between Hubballi and Mangaluru via Arsikere junction.
Earlier, a train was running between Mangaluru and Miraj via Hubballi and it was stopped during the gauge conversion works. The Minister has been urged to reintroduce this train.
Later, this train could be diverted via Ankola once the works of laying a railway track between Hubballi and Ankola was completed.
Mr. Joshi also announced on this occasion that the Ministry of Railways has fulfilled the demand for providing a train between Hubballi and Varanasi (Kashi) and a day train between Hubballi and Mysuru. Both of these trains would be flagged off at a function to be held here on May 23, he said.
The trains from Hubballi to Varanasi and Mysuru will be flagged off at a function on May 23

46 posts - Sun May 21, 2017

1 posts - Wed May 24, 2017

3 posts are hidden.

  
619 views
May 24 2017 (20:03)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2284061-50            Tags   Past Edits
Any info about Belagavi-Bengaluru SF too which is being demanded since many years ??

  
520 views
May 24 2017 (23:44)
SWR 6th cleanest zone in IR~   4221 blog posts   316 correct pred (68% accurate)
Re# 2284061-51            Tags   Past Edits
I think 06541/2 is same train extended to pandharpur, it should be made regular and at-least triweekly.

  
427 views
May 26 2017 (11:22)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2284061-52            Tags   Past Edits
But that has worst timings from YPR to UBL, BGM. I think even people who want to go to BGM dont catch it as it starts very early & it takes too much time.
There used to be a Suvidha Spl which used to depart YPR at 20:45, UBL-5:00, BGM-7:45, that should be regularised.

  
May 26 2017 (11:37)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2284061-53            Tags   Past Edits
Also the only reliable train on Sundays from BGM, UBL to SBC is RC, KSK sometimes gets delayed. & Fridays from SBC to UBL/BGM the only train present is RC in the night, getting ticket in Vasco exp is too difficult and it doesn't go till BGM.
SWR has to run a daily SF with timings similar to:
YPR-21:00
UBL-5:00
BGM-
...
more...
7:30
Return: BGM- 19:00
UBL-21:30
YPR/SBC-5:30
But return will clash its timings with KSK, RC.

  
388 views
May 26 2017 (11:46)
SWR 6th cleanest zone in IR~   4221 blog posts   316 correct pred (68% accurate)
Re# 2284061-54            Tags   Past Edits
Yes at-least a weekly SF, Friday's from Bengaluru and Sunday's from Belagavi.
Return if it is on Sunday, swr can give slot of Vsg-Ypr from Londa, 22:30 from Bgm
  
★★  Rail Fanning
0 Followers
467 views
May 26 2017 (11:04)   14715/Sri Ganganagar - Tiruchchirappalli HumSafar Express | PUNE/WDM-3A/16012

Guru Bhat~   66 blog posts
Entry# 2293525            Tags   Past Edits
Superb looking Dark Blue ALCo WDM-3A 16012 from Pune DLS, recently transferred from Kurla, chugging, smoking and nicely honking with nearly 1.5hrs late running Tiruchirapalli bound 14715 Humsafar Express. Same ALCo was the power for Sri Ganganagar bound 14716 Humsafar Express the very next day which ran bang on time !!! (Date - 25th & 26th May 2017)

  
423 views
May 26 2017 (11:29)
Waiting for UBL MAQ exp~   2094 blog posts   732 correct pred (70% accurate)
Re# 2293525-1            Tags   Past Edits
Hoodi station hattira MPS estu sir ??
Page#    1403 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site