Apr 01 2018 (20:27)   UDZ/Udaipur City (5 PFs)
susmits~
susmits~   337 blog posts
Entry# 3260713            Tags   Past Edits
Engineering works status on the UDZ-COR section.
(As of April 1, 2018)
-
Level crossing elimination
* Level crossing elimination work ongoing between KLH and PMO.
*
...
more...
This excludes some sections between FAN and BSJ, and BSJ and KIN, where the track is 110 kmph capable.
* DRB to KLH is almost LC-free and trains run at around 80 kmph.
* Ex PMO to GSD and beyond is LC-free and 110 kmph-capable.
* One LC remains between GSD and COR (near milepost 2.5).
-
Electrification - Foundation work
* No foundation work between UDZ and KLH (incl.)
* Foundation work complete between ex KLH and milepost 72.5.
* Foundation work in progress between milepost 72.5 and 71.5, with digging complete and foundation material lying next to the pits.
* No foundation work between mileposts 71.5 and 64.1. This includes MVJ.
* Complete foundation work between mileposts 64.1 and 57.7 (ex. FAN).
* Complete foundation work between mileposts 53.3 and KIN (incl.) This excludes a 1 km block immediately preceding BSJ, though works at BSJ are complete.
* Complete foundation work between about 6 km after KIN and immediately before PMO.
* Complete foundation work between 1 km after PMO and 5 km before GSD.
-
Electrification - Pole work
All of the following is presently only complete as far as erecting electrical poles. There are no wire supports or wires at the moment.
* End of the KIN platform to about 6 km after KIN.
* About 5 km before GSD to milepost 1.7 (immediately preceding the approach signal at BEC).

Translate to English
Translate to Hindi

1 Public Posts - Sun Apr 29, 2018

1 Public Posts - Sun May 27, 2018

6882 views
2

Jun 17 2018 (20:30)
susmits~
susmits~   337 blog posts
Re# 3260713-3              
#AjmerUdaipurElectrification updates for mid-June.
.
Foundation work:
- Little enough since the last update. Some more foundation towards Debari and Khemli (near Khemli), and some more foundation work at Mavli Junction proper.
...
more...
- No foundation work at Debari, Rana Pratapnagar, and Udaipur.
- Complete foundation work from about 2 kilometers outside Mavli all the way to Berach Junction.
.
Pole work:
- OHE poles are loosely kept in the foundations, uncemented, between 3 kilometers outside Fatehnagar and Bhupal Sagar.
- Between Bhupal Sagar and Berach Junction, there are now cemented poles, barring about two dozen scattered poles here and there they are not cemented into the earth. Pandoli is one exception where there's zero pole work of any kind.
- Between Kapasan and Berach Junction, all poles except a few dozen have wiring supports installed.
- There are no wires anywhere between Udaipur and Berach Junction at the moment.
- On balance, the pole work has really kicked up. The pole depot at Kapasan is nearly empty, where it used to be nearly full less than a month back.
.
Other works:
- Again, there is zero progress in the Chittorgarh-Chanderia Junction complex, other than a few hundred meters of foundations between the stations.
- They seem to have started work on the traction substation at Mavli.
.
See you next month with more updates!

Translate to English
Translate to Hindi

2 Public Posts - Sun Jun 17, 2018
General Travel
30612 views
4

May 12 2017 (14:39)   AII/Ajmer Junction (6 PFs)
guest
Entry# 2273946            Tags   Past Edits
#fake update in NTES to bahut suna hoga, now see fake update in CORE
Translate to English
Translate to Hindi

6 Public Posts - Fri May 12, 2017

7525 views
2

May 30 2017 (08:15)
Pranavsuhani~
Pranavsuhani~   824 blog posts
Re# 2273946-8               Past Edits
1 compliments
Good info
@2273946-3  @guest
#Ajmerudaipurelectrification Nasirabad to jharwasa station ohe has been laid....Till bhilwara target is March 2018.
Photos of Nasirabad bad station.
Translate to English
Translate to Hindi

5 Public Posts - Tue May 30, 2017
Page#    2 Blog Entries  

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy