What is a Mega Block? How does it affect rail traffic?  
2 Answers
Jul 27 2011 (03:30)
General

Entry# 59     
KishorWhoAJE2here~
What is a Mega Block? How does it affect rail traffic?

Aug 01 2011 (12:19)
News Entry# 32292  Mega blocks, heavy rain inconveniences commuters  
Posted by: ranjish   Added by: moderator^~  Aug 01 2011 (09:46)
Heavy rain coupled with mega blocks on both the Central and Western Railway managed to give rail commuters a hard time on Sunday. The city has been witnessing incessant rains since Saturday. Moreover, the maintenance blocks carried out by the rail authorities for nearly five hours resulted in the cancellation and diversion of several trains. Also, the trains continued to run late by over 15 minutes. 
The Central Railway (CR) carried out a mega block on the fast corridor between Mulund and Matunga stations from 11am to 4pm. Consequently, there were limited train services with most of them being diverted on the slow lines. The halting of trains at all the stations along with the slow movement, left the commuters hassled.
Of
...
more...
the 1,210 services of Western Railway (WR) and 1,573 services on CR, the authorities cancelled nearly 30%, which is a normal practice.
As part of the work, heavy-duty machines carried out maintenance operations such as removing the old tracks, concrete and wooden sleepers, repairing the overhead cables and the signalling system. “There was no problem in services due to the rain,” said V Malegaonkar, chief public relations officer (PRO), CR. The CR officials claimed that they have placed over 30 water pumps at strategic locations to flush out the water, preventing waterlogging on the tracks.
The mega block between Vashi and Belapur affected the Harbour route services considerably. As a result, people had to travel using either the state transport or private vehicles. No trains plied to and from Panvel during the block period. “The Mumbai-Goa highway was choked with road traffic,” said Chandrakant Mokal, president, All India Passengers Association. However, the railway officials claimed that special locals were run on the CST-Vashi, Belapur-Panvel and Thane-Nerul sections during the block period.
The block between Santacruz and Goregaon stations on the slow corridor from 10.35am to 3.35pm on Sunday affected the (WR) train services. During this time, the fast and slow trains were run on the fast lines. “There was no problem in services due to rain,” said N David, PRO, WR.

4559 views
0
Aug 17 2010 (09:08)
Blog Post# 64581-1     
Nisheeth   Added by: moderator^~  Aug 01 2011 (09:44)
A line block is requested by the engineering official in charge, and granted by the Divisional Railway Manager. The station master of a station adjacent to the affected block section receives a copy of the line block order from the DRM, and he decides when to implement the line block. In busier sections the Section Controller is also involved in deciding when to impose the line block. In some cases, if the traffic disruption is extensive and the block is required for longer than usual, necessitating much rerouting and rescheduling of trains, the block is termed a megablock (or 'mega block').
The simplest is a line block, or traffic block, which blocks a particular track (or tracks) when repair or construction work
...
more...
has to be carried out on the permanent way, points, crossings, interlockings, OHE, signalling equipment, etc. Such blocks are sometimes also called possession blocks (since the permanent-way staff 'take possession' of the tracks).
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.