Full Site Search  
Sat Apr 29, 2017 11:10:57 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
what is HOG  
1 Answers
Dec 16 2011 (17:15)
Coach Construction/Seating Arrangements

Entry# 872     
Harsh*^~
what is HOG

Dec 16 2011 (17:08)
Blog Post# 304979-6     
Begins Falls Rises ™~   Added by: Harsh*^~  Dec 16 2011 (17:15)
HOG means Head on Generator!!!
this is actually used in most emergency purposes!!! only a 3 phase loco can transfer the power from over head wires to the EOG's n to the coaches!!!
After extensive trials and improvements on the design, commercial service of HOG scheme involving one 3 phase electric loco and 12 passenger coaches & two power cars have been started from 21.02.2011 between New Delhi-Kalka & back in train no. 12005/’06 NDLS-KLK Shatabdi Express. In this scheme the power supply is received directly from locomotive through couplers and
...
more...
DG sets kept off to be used during emergency only. The supply from locomotive is 750V, 3 phase.
No noise (DG sets will not be used)
• Saving of HSD oil (about 700 Ltrs per round trip)
• Economical (saving of about 18,000.00 per round trip)
• Pollution free environment at Rly. station etc. (No smoke as DG sets will not be used)
this isnt introduced everywhere as of now!!! wil take sometime to hit the tracks!!!!
mostly few WAP-7's n WAP-5's have this 3 phase system as of now!!!!
Scroll to Top
Scroll to Bottom


Go to Desktop site