Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Talk to a RailFan - you will learn a LOT about Trains.

Search PNRs
Post PNR

PNR: 863-xxxxxxx

PNR Forum Entry# 1467862
PREDICTIONS: confirm:2  rac:0  waitlist:2 
Journey: Sat May 16, 2015
Departure: GWL/Gwalior Junction @ 04:42 PF#: 2,3
Arrival: LKO/Lucknow Charbagh NR @ 13:30 PF#: 2
Distance: 448 km / 2140 km
Travel Time: 8h 48m  4 halts
Class: AC 3-tier - 3A   |   Tot Seats: Avbl-0020   |   Charting: < 21:15

Latest Status as of: May 16 2015 (03:40)
Passenger 2: Waitlist# 3 (Booking Status: W/L 12,CK)
Chart PREPARED
Surat - Muzaffarpur Express (PT)/19053
Other Trains in the News
The Shortest Route between GWL and LKO is 119 km (26%) shorter.
Travel Time: 8h 48m     4 halts
Distance: 448 km     Avg Speed: 51 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 04:42
Gwalior Junction/GWL 
Platform# 2,3
 
 
 
 
 
 
Sat
Arrives @ 13:30
LKO/Lucknow Charbagh NR 
Platform# 2
 
 
 
 
 
 
Sat
Type: Mail/Express
Rake Zone: WR/Western
Latest News
(You need to double-check/verify this info yourself)
🔹Train No 19053 Surat-Muzaffarpur Exp dated 19/01/2024 will be operated on a diverted route VIA Kanpur Central, Prayagraj JN, Banaras, Varanasi Jn, Varanasi City, Ballia due to NI (doubling Work) at Lucknow Division/NR.
Sat Jan 13, 2024 (06:45AM)
News History
सूरत से 08 एवं 15 दिसम्बर को चलने वाली 19053 सूरत - मुजफ्फरपुर एक्सप्रेस परिवर्तित मार्ग लखनऊ - बाराबंकी - गोण्डा - गोरखपुर - छपरा के रास्ते चलाई जाएगी।
Fri Dec 08, 2023 (07:22PM)
• JCO 24.02.2023 will be diverted to run Via Chhapra-Gorakhpur-Mankapur-Ayodhya due to Non- Interlocking work at Kheta Sarai and Shahganj stations o­n Barabanki –Ayodhya Cantt - Akbarpur - Zafarabad section of Lucknow Division over NR.
Sat Feb 18, 2023 (01:00PM)
🔹Due to BNI/NI Work at Lucknow NR Division Train No. 19053 Surat - Muzaffarpur Jn. ( ST-MFP ) as on Dt. 06-01-2023 will be diverted via Barabanki Jn.- Gonda Jn.- Gorakhpur Jn.- Chhapra. ( Via BBK-GD-GKP-CPR ).
Sat Dec 31, 2022 (09:48AM)
To run with LHB rakes wef 02/12/2022
Thu Nov 24, 2022 (09:36PM)
Will Run with end to end E-Loco W.E.F. 23/04/2022
Thu Apr 21, 2022 (06:51PM)
Train No. 19053/19054 Surat – Muzaffarpur Junction – Surat Express augmented with an additional Sleeper Class Coach Ex Surat (Friday) from 01.04.2022 to 27.05.2022Ex Muzaffarpur (Wednesday) from 03.04.2022 to 29.05.2022
Sun Apr 03, 2022 (09:41AM)
Augmented with an additional o­ne second class sleeper and two AC 3 tier coaches. Ex Surat from 31.12.2021
Wed Dec 29, 2021 (08:24PM)
➡️ JCF 19.11.21 is operating with Regular Number.
Mon Nov 15, 2021 (09:03PM)
0 Follows
Rating: 5.0/5 (36 votes)
cleanliness - excellent (6)
punctuality - excellent (6)
food - excellent (6)
ticket avbl - excellent (6)
u/r coach - excellent (6)
railfanning - excellent (6)
safety - excellent (6)
Bedroll/Linen: AVAILABLE change
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 S8
  5
 S7
  6
 S6
  7
 S5
  8
 S4
  9
 S3
 18
 A2
 17
 B1
 16
 B2
 15
 B3
 14
 B4
 13
 B5
 12
 B6
 11
 S1
 10
 S2
 19
 A1
 20
HA1
 21
 GS
 22
EOG
BINA
RSA - Rake Sharing

Show ALL intermediate Stations

4 halts. 64 intermediate Stations between Gwalior Junction and Lucknow Charbagh NR
#1
-1111.6 km
/==/
Zone: WR
PF# 4
Speed: 73
Elev: 59m

07:35
Day: 1
129.7 km
25 intermediate stations
01:47
#2
-981.9 km
/==/
Zone: WR
PF# 2
Speed: 52
Elev: 36m
09:22
09:32
Day: 1
146.9 km
22 intermediate stations
02:48
#3
-834.9 km
/==/
Zone: WR
PF# 3
Speed: 66
Elev: 312m
12:20
12:22
Day: 1
113.9 km
16 intermediate stations
01:43
#4
-721.0 km
/==/
Zone: WR
PF# 5
Speed: 51
Elev: 494m
14:05
14:15
Day: 1
41.1 km
5 intermediate stations
00:48
#5
-680.0 km
/==/
Zone: WR
Speed: 55
Elev: 469m
15:03
15:05
Day: 1
55.5 km
8 intermediate stations
01:00
#6
-624.5 km
/==/
Zone: WR
PF# 6
Speed: 34
Elev: 492m
16:05
16:15
Day: 1
Remote Location Quota Starting and Charting Station
41.2 km
5 intermediate stations
01:13
#7
-583.3 km
/==/
Zone: WR
PF# 1
Speed: 75
Elev: 510m
17:28
17:30
Day: 1
116.5 km
10 intermediate stations
01:33
#8
-466.8 km
/--/
Zone: WCR
PF# 1
Speed: 49
19:03
19:05
Day: 1
97.5 km
9 intermediate stations
02:00
#9
-369.3 km
/==/
Zone: WCR
PF# 2
Speed: 85
Elev: 476m
21:05
21:15
Day: 1
44.2 km
5 intermediate stations
00:31
#10
-325.1 km
/==/
Zone: WCR
PF# 2
Speed: 33
Elev: 500m
21:46
21:48
Day: 1
74.4 km
9 intermediate stations
02:17
#11
-250.7 km
/==/
Zone: WCR
PF# 4
Speed: 54
Elev: 411m
00:05
00:25
Day: 2
Rake Reversal (the train reverses direction)
153.2 km
19 intermediate stations
02:50
#12
-97.5 km
/==/
Zone: NCR
PF# 4
Speed: 76
Elev: 258m
03:15
03:23
Day: 2
Remote Location Quota Starting and Charting Station
97.5 km
11 intermediate stations
01:17
#13
0.0 km
%≡≡%
Zone: NCR
PF# 2,3
Speed: 54
Elev: 212m
04:40
04:42
Day: 2
65.6 km
9 intermediate stations
01:13
#14
65.6 km
%≡≡%
Zone: NCR
Speed: 83
Elev: 175m
05:55
05:57
Day: 2
52.5 km
3 intermediate stations
00:38
#15
118.2 km
%≡≡%
Zone: NCR
PF# 2
Speed: 20
Elev: 167m
06:35
06:40
Day: 2
Remote Location Quota Starting and Charting Station
27.2 km
6 intermediate stations
01:20
#16
145.4 km
/==/
Zone: NCR
PF# 7
Speed: 63
Elev: 167m
08:00
08:05
Day: 2
231.1 km
30 intermediate stations
03:40
#17
376.5 km
/==/
Zone: NCR
PF# 5
Speed: 43
Elev: 127m
11:45
11:50
Day: 2
72.0 km
12 intermediate stations
01:40
#18
448.5 km
/==/
Zone: NR
PF# 2
Speed: 48
Elev: 124m
13:30
13:40
Day: 2
Remote Location Quota Starting and Charting Station
127.7 km
17 intermediate stations
02:40
#19
576.2 km
/==/
Zone: NR
Speed: 10
16:20
16:25
Day: 2
7.0 km
1 intermediate stations
00:41
#20
583.2 km
/==/
Zone: NR
PF# 1,2
Speed: 30
Elev: 98m
17:06
17:08
Day: 2
97.9 km
10 intermediate stations
03:17
#21
681.1 km
/==/
Zone: NR
PF# 4
Speed: 45
Elev: 90m
20:25
20:30
Day: 2
Rake Reversal (the train reverses direction)
55.9 km
7 intermediate stations
01:15
#22
737.0 km
/==/
Zone: NER
PF# 1
Speed: 58
Elev: 84m
21:45
21:50
Day: 2
43.3 km
5 intermediate stations
00:45
#23
780.3 km
%==%
Zone: NER
PF# 3
Speed: 59
Elev: 70m
22:35
22:40
Day: 2
68.6 km
10 intermediate stations
01:10
#24
848.9 km
/==/
Zone: NER
PF# 2
Speed: 44
Elev: 65m
23:50
23:55
Day: 2
66.2 km
10 intermediate stations
01:30
#25
915.1 km
/==/
Zone: NER
PF# 3,4
Speed: 55
Elev: 58m
01:25
01:35
Day: 3
59.5 km
13 intermediate stations
01:05
#26
974.6 km
/==/
Zone: ECR
PF# 4,5
Speed: 31
Elev: 55m
02:40
02:45
Day: 3
53.8 km
9 intermediate stations
01:45
#27
1028.4 km
/==/
Zone: ECR
PF# 3,4

Elev: 57m
04:30

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy