Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

हमसे सीखे कोई जीने का सलीका। सफर कैसा भी हो, मौज़ उडाये जाते हैं।। - Amir

Search PNRs
Post PNR

PNR: 840-xxxxxxx

PNR Forum Entry# 1820995
PREDICTIONS: confirm:0  rac:0  waitlist:16 
Journey: Wed Apr 27, 2016
Departure: LTT/Mumbai LTT @ 13:15 PF#: 2
Arrival: KYQ/Kamakhya Junction @ 15:30 +2 night PF#: 4
Distance: 2953 km / 2953 km
Travel Time: 50h 15m  28 halts
Class: AC 3-tier - 3A   |   Tot Seats: Avbl-0139#   |   Charting: < 09:15

Latest Status as of: Apr 27 2016 (07:13)
Passenger 2: Waitlist# 7 (Booking Status: W/L 20,CK)
Passenger 3: Waitlist# 8 (Booking Status: W/L 21,CK)
Total Fare:  8235
Chart NOT Prepared

Show Full PNR Status History (2 statuses)
Status as of: Apr 27 2016 (01:11)
Passenger 2: Waitlist# 7 (Booking Status: W/L 20,CK)
Passenger 3: Waitlist# 8 (Booking Status: W/L 21,CK)
Total Fare:  8235
Chart NOT Prepared

Status as of: Apr 26 2016 (13:32)
Passenger 2: Waitlist# 9 (Booking Status: W/L 20,CK)
Passenger 3: Waitlist# 10 (Booking Status: W/L 21,CK)
Total Fare:  8235
Chart NOT Prepared

Mumbai LTT - Kamakhya Karmabhoomi Express (PT)/22511
Other Trains in the News
The Shortest Route between LTT and KYQ is 394 km (13%) shorter.
Travel Time: 50h 15m     28 halts
Distance: 2953 km     Avg Speed: 59 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 13:15
Mumbai LTT/LTT 
Platform# 2
 
 
Tue
 
 
 
 
Arrives @ 15:30 +2 nights
KYQ/Kamakhya Jn 
Platform# 4
 
 
 
 
Thu
 
 
Type: SuperFast
Rake Zone: NFR/Northeast Frontier
Latest News
(You need to double-check/verify this info yourself)
Due to 3rd LINE Pre Ni & NI WORK BETWEEN MURARAI & CHATRA, 22511 Up LTT-KYQ Exp (JCO 12.12.2023 & 19.12.2023) will be diverted via Bandel-Katwa-Jangipur with stoppages at Bandel, Nabadwip, Katwa, Azimganj, Jangipur.
Sat Dec 09, 2023 (12:28PM)
News History
▪️ Departure from LTT on 03.10.23 & 17.10.23 is cancelled
Thu Sep 28, 2023 (12:00AM)
▪️ Departure from LTT on 19.09.23 is cancelled
Mon Sep 18, 2023 (10:11PM)
▪️ Departure from LTT on 09.05.23 is diverted via Sarona - Ukura
Fri May 05, 2023 (01:14AM)
JCO 04.04.2023 is diverted via Rourkela-Ranchi-Bokaro Steel City-Adra-Medinipur-Kharagpur
Tue Apr 04, 2023 (06:36PM)
▪️ Departure from LTT on 21.02.23 is diverted via Ib - Jharsuguda Road - Sambalpur City - Angul - Bhadrak - Khargapur
Wed Feb 22, 2023 (01:41PM)
▪️22511 LTT-Kamakhya Express JCO 15.11.2022, 22.11.2022, 29.11.2022, 6.12.2022 and 13.12.2022 will short originate from Thane.▪️JCO on 15.11.22 is cancelled
Fri Nov 11, 2022 (02:04AM)
22511 LTT-Kamakhya Express JCO 15.11.2022, 22.11.2022, 29.11.2022, 6.12.2022 and 13.12.2022 will short originate from Thane.
Wed Nov 09, 2022 (02:57PM)
▪️ Departure from LTT on 27.09.22 is cancelled
Wed Sep 21, 2022 (11:13PM)
Due to Pre/Non Interlocking work at Kachewani station in connection with Raj Nandgaon-Kalumna 3rd line work of Nagpur division in South East Central Railway the following train service will be Cancelled. Train No. 22511 Lokmanya Tilak (T)-Kamakhya Karmabhoomi Express scheduled to leave on 06-09-2022 will remain cancelled.
Tue Aug 30, 2022 (08:34PM)
Due to Pre-Non Interlocking & Non Interlocking work for 4th line connectivity at Himgir station in Raigarh - Jharsuguda Jn. Section from 21-08-2022 to 29-08-2022, the following train services will be Cancelled.Train No 22511 Lokmanya Tilak (T) - Kamakhya Karmabhoomi Express scheduled to leave from Lokmanya Tilak (T) on 23 08-2022...
more...
& 30-08-2022 will remain cancelled.
Thu Aug 18, 2022 (10:24PM)
JCO 26.07.2022 will be diverted via NBQ - RNY - KYQ.
Tue Jul 26, 2022 (08:11PM)
Restoration of Unreserved Booking in this Train will start W.E.F 05/07/2022
Sat Jun 25, 2022 (05:20PM)
........
Wed Mar 02, 2022 (02:05AM)
⚠️Cancellation Alert⚠️ 22511 Mumbai LTT - Kamakhya Karmabhoomi is Cancelled on 01.03.2022 Due to work of infrastructure upgrade on Rangiya Division of Northeast Frontier Railway (NFR).
Tue Mar 01, 2022 (07:54AM)
दिनांक 28.12.2021 को निरस्त रहेगी।
Thu Dec 23, 2021 (09:53AM)
-
Wed Dec 22, 2021 (08:09PM)
JCO 07.12.2021 fully cancelled
Fri Dec 03, 2021 (09:12AM)
JCO 24/8/21 will be diverted via Rangiya due to Derailment of 02346 at Chaygaon
Wed Aug 25, 2021 (10:43PM)
2 Follows
Rating: 4.2/5 (42 votes)
cleanliness - good (8)
punctuality - excellent (7)
food - good (7)
ticket avbl - good (6)
u/r coach - excellent (2)
railfanning - excellent (7)
safety - good (7)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Dec 24, 2010
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering at Lokmanyatilak, Kalyan,Manmad, Bhusaval,Akola , Bilaspur,Jharsuguda,Rourkela,Kharagpur, Howrah,New Bongaigaon
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
S10
  4
 S9
  5
 S8
  6
 S7
  7
 S6
  8
 S5
  9
 S4
 18
 B1
 17
 B2
 16
 B3
 15
 B4
 14
 B5
 13
 PC
 12
 S1
 11
 S2
 10
 S3
 19
 A1
 20
 GS
 21
 GS
 22
EOG
RSA - Rake Sharing
No RSA. Single Dedicated Rake. CDO - KYQ.

Show ALL intermediate Stations

28 halts. 505 intermediate Stations between Mumbai LTT and Kamakhya Junction
#1
0.0 km
/==/
Zone: CR
PF# 2
Speed: 56
Elev: 6m

13:15
Day: 1
34.6 km
18 intermediate stations
00:37
#2
34.6 km
/==/
Zone: CR
PF# 4
Speed: 62
Elev: 9m
13:52
13:55
Day: 1
67.4 km
10 intermediate stations
01:05
#3
102.0 km
%≡≡%
Zone: CR
PF# 1
Speed: 28
Elev: 308m
15:00
15:03
Day: 1
Technical Halt Bankers attached
14.2 km
3 intermediate stations
00:30
#4
116.1 km
/==/
Zone: CR
Speed: 78
Elev: 599m
15:33
15:35
Day: 1
Technical Halt Bankers detached
123.6 km
15 intermediate stations
01:35
#5
239.7 km
/==/
Zone: CR
PF# 2
Speed: 77
Elev: 558m
17:10
17:12
Day: 1
184.1 km
22 intermediate stations
02:23
#6
423.9 km
/==/
Zone: CR
PF# 6,7
Speed: 75
Elev: 205m
19:35
19:40
Day: 1
Remote Location Quota Starting and Charting Station
139.5 km
20 intermediate stations
01:52
#7
563.3 km
/==/
Zone: CR
PF# 2
Speed: 67
Elev: 598m
21:32
21:35
Day: 1
253.0 km
38 intermediate stations
03:45
#8
816.3 km
%≡≡%
Zone: CR
PF# 3
Speed: 62
Elev: 309m
01:20
01:25
Day: 2
Remote Location Quota Starting and Charting Station
129.6 km
16 intermediate stations
01:44
#9
946.0 km
%≡≡%
Zone: SECR
PF# 4
Speed: 68
Elev: 311m
03:09
03:11
Day: 2
171.9 km
33 intermediate stations
02:32
#10
1117.9 km
/==/
Zone: SECR
PF# 5
Speed: 65
Elev: 315m
05:43
05:48
Day: 2
Remote Location Quota Starting and Charting Station
110.8 km
19 intermediate stations
01:42
#11
1228.7 km
/==/
Zone: SECR
PF# 1
Speed: 82
Elev: 292m
07:30
07:45
Day: 2
98.4 km
14 intermediate stations
01:12
#12
1327.1 km
/==/
Zone: SECR
Speed: 93
08:57
08:59
Day: 2
Halt from 17.01.24 on experimantal basis till further advice
34.0 km
3 intermediate stations
00:22
#13
1361.1 km
%≡≡%
Zone: SECR
PF# 1
Speed: 57
Elev: 218m
09:21
09:23
Day: 2
71.6 km
9 intermediate stations
01:15
#14
1432.7 km
/==/
Zone: SER
PF# 2
Speed: 84
Elev: 231m
10:38
10:40
Day: 2
101.1 km
15 intermediate stations
01:12
#15
1533.9 km
/==/
Zone: SER
PF# 4
Speed: 71
Elev: 218m
11:52
12:00
Day: 2
101.0 km
15 intermediate stations
01:25
#16
1634.9 km
/==/
Zone: SER
Speed: 75
Elev: 234m
13:25
13:30
Day: 2
62.1 km
8 intermediate stations
00:50
#17
1697.0 km
%≡≡%
Zone: SER
PF# 4
Speed: 62
Elev: 159m
14:20
14:25
Day: 2
Remote Location Quota Starting and Charting Station
133.8 km
20 intermediate stations
02:10
#18
1830.8 km
/==/
Zone: SER
PF# 6
Speed: 47
Elev: 39m
16:35
16:43
Day: 2
118.5 km
35 intermediate stations
02:30
#19
1949.3 km
/==/
Zone: ER
PF# 2
Speed: 92
Elev: 37m
19:13
19:15
Day: 2
79.8 km
25 intermediate stations
00:52
#20
2029.2 km
/==/
Zone: ER
PF# 1,2
Speed: 71
Elev: 36m
20:07
20:09
Day: 2
51.9 km
8 intermediate stations
00:44
#21
2081.1 km
/==/
Zone: ER
PF# 1
Speed: 65
Elev: 50m
20:53
20:55
Day: 2
60.5 km
8 intermediate stations
00:56
#22
2141.6 km
/==/
Zone: ER
PF# 2
Speed: 85
Elev: 143m
21:51
21:53
Day: 2
52.7 km
8 intermediate stations
00:37
#23
2194.3 km
/==/
Zone: ER
PF# 1
Speed: 27
Elev: 37m
22:30
22:32
Day: 2
Xing with 13404/Vananchal Express | Wed
71.3 km
14 intermediate stations
02:38
#24
2265.5 km
/==/
Zone: ER
PF# 4
Speed: 63
Elev: 31m
01:10
01:20
Day: 3
235.1 km
43 intermediate stations
03:45
#25
2500.6 km
/==/
Zone: NFR
PF# 1
Speed: 8
Elev: 114m
05:05
05:15
Day: 3
Loco Changes from Electric To Diesel
7.3 km
1 intermediate stations
00:53
#26
2507.9 km
/--/
Zone: NFR
PF# 3
Speed: 57
Elev: 119m
06:08
06:10
Day: 3
126.3 km
19 intermediate stations
02:14
#27
2634.1 km
/--/
Zone: NFR
PF# 2
Speed: 47
Elev: 123m
08:24
08:26
Day: 3
34.6 km
5 intermediate stations
00:44
#28
2668.8 km
/--/
Zone: NFR
PF# 2
Speed: 47
Elev: 50m
09:10
09:15
Day: 3
108.9 km
16 intermediate stations
02:20
#29
2777.7 km
/==/
Zone: NFR
PF# 1A,1B
Speed: 33
Elev: 60m
11:35
11:40
Day: 3
175.5 km
17 intermediate stations
03:50
#30
2953.2 km
%==%
Zone: NFR
PF# 4

Elev: 56m
15:30

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy