Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Deccan Queen - मेरे सपनों की रानी

Search PNRs
Post PNR

PNR: 422-xxxxxxx

PNR Forum Entry# 2107690
PREDICTIONS: confirm:12  rac:0  waitlist:0 
Journey: Mon Jan 09, 2017
Departure: ED/Erode Junction @ 23:35
Arrival: BNC/Bengaluru Cantt. (Bangalore) @ 05:03 +1 night PF#: 1
Distance: 274 km / 677 km
Travel Time: 5h 28m  5 halts
Class: Sleeper - SL   |   Tot Seats: Avbl-0420#   |   Charting: < 14:00

Latest Status as of: Jan 09 2017 (17:31)
Passenger 1: S5,71 [SL] (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart PREPARED

Show Full PNR Status History (13 statuses)
Status as of: Jan 09 2017 (17:31)
Passenger 1: S5,71 [SL] (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart PREPARED

Status as of: Jan 09 2017 (07:18)
Passenger 1: RAC 86 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 08 2017 (19:09)
Passenger 1: RAC 87 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 08 2017 (07:43)
Passenger 1: RAC 90 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 07 2017 (07:43)
Passenger 1: RAC 99 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 06 2017 (06:58)
Passenger 1: Waitlist# 6 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 05 2017 (08:33)
Passenger 1: Waitlist# 18 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 04 2017 (11:09)
Passenger 1: Waitlist# 27 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 03 2017 (12:58)
Passenger 1: Waitlist# 29 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Jan 02 2017 (16:56)
Passenger 1: Waitlist# 30 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Dec 31 2016 (17:36)
Passenger 1: Waitlist# 37 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Dec 30 2016 (19:31)
Passenger 1: Waitlist# 43 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Status as of: Dec 28 2016 (08:23)
Passenger 1: Waitlist# 45 (Booking Status: W/L 54,GNWL)
Total Fare:  0
Chart NOT Prepared

Mayiladuturai - Mysuru Express (PT)/16231
Other Trains in the News
This is the Shortest Route between ED and BNC.
Travel Time: 5h 28m     5 halts
Distance: 274 km     Avg Speed: 50 km/hr
Max Permissible Speed: 110 km/hr between KMU/Kumbakonam and MYS/Mysuru Junction (Mysore)
Departs @ 23:35
Erode Junction/ED 
Platform# --
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 05:03 +1 night
BNC/Bengaluru Cantt 
Platform# 1
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: SWR/South Western
Latest News
(You need to double-check/verify this info yourself)
JCO 12.03.24 Will Be Regulated Enroute For 10 Mins At Kengeri Station Due To Engineering Works At Level Crossing Between Kengeri and Hejjala
Fri Mar 01, 2024 (08:16PM)
News History
🔹Train No 16231 Mayiladuturai – Mysuru Express scheduled to leave Mayiladuturai at 5.55pm on January 27 and February 3, 2024 is rescheduled to 6.55pm.
Sun Jan 21, 2024 (10:41AM)
🔹Train No. 16231 Mayiladuturai-Mysuru Daily Express, starting from Mayiladuturai o­n August 12, 19 & 26, 2023 will be rescheduled by 90 minutes and 150 minutes respectively.
Fri Aug 11, 2023 (11:05PM)
🔹 In view of the Maha Kumbhabhishekam Celebrations at Satguru Sri Seshadri Swamigal Adhistanam, Train no. 16231/Mayiladuturai - Mysuru Express (PT) JCO 21/05/2023 to 25/05/2023 will be provided with a Temporary Stoppage of One Minute Duration at Unjalur Railway Station (2220pm / 2221pm).
Thu May 11, 2023 (05:36PM)
🔹 Train No. 16231 Mayiladuturai - Mysuru Daily Express, leaving from Mayiladuturai on April 10, 2023 will be rescheduled by 90 minutes.
Sun Apr 09, 2023 (11:49AM)
🔹Train 16231 Mayiladuthurai - Mysuru express originating from Mayiladuthurai will run with 4 rakes of 21 coaches with revised composition of 1-AC Two Tier Coach, 5-AC Three Tier Coaches. 11-Three Tier Sleeper Coaches, 2-Second Class Coaches and 2-Brake Luggage & Generator Cars instead of 1-AC Two Tier Coach, 3-AC Three Tier...
more...
Coaches. 13-Three Tier Sleeper Coaches, 2-Second Class Coaches and 2-Brake Luggage & Generator Cars with effect from January 23, 2023.
Fri Jan 20, 2023 (12:06PM)
B2 acts as CC (C1) btw SBC MYS.
Sat Apr 02, 2022 (02:09PM)
Permanently Augmented with one extra AC-Three Tier ex.MYS from 22-01-2022.
Sat Jan 22, 2022 (01:31PM)
J.C.O 25/11/2020 will short orignate from TPJ.
Mon Nov 23, 2020 (04:22PM)
3 Follows
Rating: 3.5/5 (144 votes)
cleanliness - good (25)
punctuality - good (26)
food - good (22)
ticket avbl - average (24)
u/r coach - average (12)
railfanning - good (22)
safety - good (25)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Aug 01, 1997
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is Only Available at Thanjavur, Tiruchchirappalli & Erode.
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
S11
  5
S10
  6
 S9
  7
 S8
  8
 S7
  9
 S6
 18
 B2
 17
 B3
 16
 B4
 15
 B5
 14
 S1
 13
 S2
 12
 S3
 11
 S4
 10
 S5
 19
 B1
 20
 A1
 21
EOG
  ED
B3 acts as C1 Between KSR Bengaluru and Mysuru Jn.

Show ALL intermediate Stations

5 halts. 35 intermediate Stations between Erode Junction and Bengaluru Cantt. (Bangalore)
#1
-261.5 km
/--/
Zone: SR
Speed: 43
Elev: 13m

17:55
Day: 1
8.6 km
1 intermediate stations
00:12
#2
-252.9 km
/--/
Zone: SR
PF# 1
Speed: 56
Elev: 19m
18:07
18:08
Day: 1
11.1 km
1 intermediate stations
00:12
#3
-241.7 km
/--/
Zone: SR
PF# 1
Speed: 57
Elev: 22m
18:20
18:21
Day: 1
11.5 km
2 intermediate stations
00:12
#4
-230.2 km
/--/
Zone: SR
PF# 1
Speed: 78
Elev: 32m
18:33
18:35
Day: 1
14.4 km
3 intermediate stations
00:11
#5
-215.9 km
/--/
Zone: SR
PF#: 1
Speed: 71
Elev: 32m
18:46
18:47
Day: 1
25.0 km
4 intermediate stations
00:21
#6
-190.9 km
/--/
Zone: SR
PF# 1
Speed: 61
Elev: 57m
19:08
19:10
Day: 1
17.3 km
1 intermediate stations
00:17
#7
-173.6 km
/==/
Zone: SR
PF# 1
Speed: 79
19:27
19:28
Day: 1
22.4 km
3 intermediate stations
00:17
#8
-151.2 km
/==/
Zone: SR
Speed: 15
Elev: 74m
19:45
19:46
Day: 1
10.0 km
2 intermediate stations
00:39
#9
-141.2 km
/==/
Zone: SR
PF# 2,3
Speed: 28
Elev: 86m
20:25
20:35
Day: 1
Rake Reversal (the train reverses direction)
3.7 km
1 intermediate stations
00:08
#10
-137.5 km
/--/
Zone: SR
PF# 1
Speed: 59
Elev: 73m
20:43
20:45
Day: 1
33.2 km
7 intermediate stations
00:34
#11
-104.3 km
/--/
Zone: SR
PF# 1
Speed: 62
Elev: 90m
21:19
21:20
Day: 1
39.4 km
7 intermediate stations
00:38
#12
-64.9 km
/--/
Zone: SR
PF# 3
Speed: 45
Elev: 120m
21:58
22:00
Day: 1
14.4 km
1 intermediate stations
00:19
#13
-50.5 km
/--/
Zone: SR
PF#: 1
Speed: 47
Elev: 156m
22:19
22:20
Day: 1
Experimental Halt Untill further Advice.
50.5 km
6 intermediate stations
01:05
#14
0.0 km
/--/
Zone: SR
Speed: 69
Elev: 171m
23:25
23:35
Day: 1
Rake Reversal (the train reverses direction)
59.7 km
8 intermediate stations
00:52
#15
59.7 km
/==/
Zone: SR
Speed: 41
Elev: 280m
00:27
00:30
Day: 2
66.2 km
9 intermediate stations
01:36
#16
125.9 km
/--/
Zone: SWR
Speed: 65
Elev: 466m
02:06
02:07
Day: 2
92.5 km
5 intermediate stations
01:26
#17
218.4 km
%==%
Zone: SWR
PF# 2
Speed: 73
Elev: 896m
03:33
03:35
Day: 2
35.1 km
3 intermediate stations
00:29
#18
253.6 km
%==%
Zone: SWR
PF# 1
Speed: 20
Elev: 896m
04:04
04:05
Day: 2
17.3 km
5 intermediate stations
00:51
#19
270.9 km
%≡≡%
Zone: SWR
PF# 1
Speed: 32
Elev: 906m
04:56
04:58
Day: 2
2.7 km
0 intermediate stations
00:05
#20
273.6 km
%≡≡%
Zone: SWR
PF# 1
Speed: 7
Elev: 920m
05:03
05:05
Day: 2
4.3 km
0 intermediate stations
00:35
#21
277.9 km
/==/
Zone: SWR
PF# 5
Speed: 38
Elev: 897m
05:40
05:45
Day: 2
Remote Location Quota Starting & Charting Station.
12.1 km
3 intermediate stations
00:19
#22
290.0 km
/==/
Zone: SWR
PF# 3
Speed: 82
Elev: 797m
06:04
06:05
Day: 2
61.7 km
7 intermediate stations
00:45
#23
351.7 km
/==/
Zone: SWR
PF# 1
Speed: 68
Elev: 634m
06:50
06:51
Day: 2
Experimental halt for a period of 6 months with effect from 29th January, 2024 to 28th July, 2024.
19.1 km
1 intermediate stations
00:17
#24
370.9 km
/==/
Zone: SWR
PF# 2
Speed: 54
Elev: 669m
07:08
07:10
Day: 2
44.6 km
10 intermediate stations
00:50
#25
415.5 km
/==/
Zone: SWR

Elev: 759m
08:00

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy