Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

SBC - Kranti Veera Sangolli Rayanna Bengaluru: Station in Garden - Dinesh Kumar

Search PNRs
Post PNR

PNR: 825-xxxxxxx

PNR Forum Entry# 2129164
PREDICTIONS: confirm:13  rac:2  waitlist:0 
Journey: Tue Jan 17, 2017
Departure: BKN/Bikaner Junction @ 04:20 PF#: 1
Arrival: SGNR/Shri Ganganagar Junction @ 09:50 PF#: 2
Distance: 299 km / 917 km
Travel Time: 5h 30m  7 halts
Class: AC 2-tier - 2A   |   Tot Seats: Avbl-0006#   |   Charting: < 20:30

Latest Status as of: Jan 16 2017 (21:21)
Passenger 1: A1,25 [LB]/Coach Position:15 (Booking Status: W/L 25,RLGN)
Total Fare:  740
Chart PREPARED

Show Full PNR Status History (2 statuses)
Status as of: Jan 16 2017 (21:21)
Passenger 1: A1,25 [LB]/Coach Position:15 (Booking Status: W/L 25,RLGN)
Total Fare:  740
Chart PREPARED

Status as of: Jan 16 2017 (14:24)
Passenger 1: Waitlist# 13 (Booking Status: W/L 25,RLGN)
Total Fare:  740
Chart NOT Prepared

Kota - Shri Ganganagar SF Express/22981
Other Trains in the News
Compare with the Shortest Route between Bikaner Junction and Shri Ganganagar Jn.
Travel Time: 5h 30m     7 halts
Distance: 299 km     Avg Speed: 54 km/hr
Max Permissible Speed: 110 km/hr between KOTA/Kota Junction and FL/Phulera Junction
Departs @ 04:20
Bikaner Junction/BKN 
Platform# 1
Sun
 
Tue
Wed
 
 
Sat
Arrives @ 09:50
SGNR/Shri Ganganagar Jn 
Platform# 2
Sun
 
Tue
Wed
 
 
Sat
Type: SuperFast
Rake Zone: WCR/West Central
Latest News
(You need to double-check/verify this info yourself)
गाडी संख्या 22981, कोटा-श्रीगंगानगर एक्सप्रेस रेलसेवा जो दिनांक 22.12.23, 23.12.23 व 25.12.23 को कोटा से प्रस्थान करेगी वह रेलसेवा श्योसिंहपुरा पदमपुरा स्टेशन पर 20.30 बजे आगमन व 20.31 बजे प्रस्थान करेगी।
Mon Dec 18, 2023 (05:39PM)
News History
ट्रेन नं. 22981 कोटा-श्रीगंगानगर ट्रेन (सप्ताह में 04 दिन) 20 से 28 दिसंबर तक परिवर्तित मार्ग जयपुर-रींगस-सीकर-चूरू-बीकानेर हाेकर चलेगी।
Mon Dec 13, 2021 (09:58PM)
📢 दिल्ली सराय रोहिल्ला से 18 अक्टूबर 2021 से 30 नवम्बर 2021 तक 4 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Sat Oct 16, 2021 (03:39AM)
0 Follows
Rating: 4.4/5 (34 votes)
cleanliness - good (7)
punctuality - good (7)
food - good (3)
ticket avbl - excellent (6)
u/r coach - excellent (4)
railfanning - excellent (5)
safety - excellent (6)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Tue Apr 09, 2013
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
 S8
  5
 S7
  6
 S6
  7
 S5
  8
 S4
  9
 S3
 18
 A1
 17
 B1
 16
 B2
 15
 B3
 14
 B4
 13
 B5
 12
 M1
 11
 S1
 10
 S2
 19
HA1
 20
 GS
 21
 GS
 22
EOG
 HMH

Show ALL intermediate Stations

7 halts. 32 intermediate Stations between Bikaner Junction and Shri Ganganagar Junction
#1
-618.1 km
/==/
Zone: WCR
PF# 1
Speed: 96
Elev: 253m

17:20
Day: 1
60.6 km
10 intermediate stations
00:38
#2
-557.5 km
/==/
Zone: WCR
PF# 3
Speed: 65
Elev: 225m
17:58
18:00
Day: 1
10.9 km
0 intermediate stations
00:10
#3
-546.7 km
/==/
Zone: WCR
PF# 1
Speed: 58
Elev: 247m
18:10
18:12
Day: 1
36.4 km
3 intermediate stations
00:38
#4
-510.2 km
/==/
Zone: WCR
PF# 1
Speed: 110
Elev: 266m
18:50
19:05
Day: 1
Rake Reversal (the train reverses direction)
Loco change from electric to diesel.
22.0 km
1 intermediate stations
00:12
#5
-488.2 km
/--/
Zone: NWR
PF# 1
Speed: 77
19:17
19:26
Day: 1
Xing with 14813/Jodhpur - Bhopal Express | Mon,Tue,Fri,Sat
17.9 km
1 intermediate stations
00:14
#6
-470.3 km
/--/
Zone: NWR
PF# 1
Speed: 141
Elev: 271m
19:40
19:42
Day: 1
25.9 km
1 intermediate stations
00:11
#7
-444.4 km
/--/
Zone: NWR
PF# 1
Speed: 53
19:53
20:04
Day: 1
58.6 km
4 intermediate stations
01:06
#8
-385.8 km
/--/
Zone: NWR
PF# 2
Speed: 26
Elev: 403m
21:10
21:13
Day: 1
7.4 km
1 intermediate stations
00:17
#9
-378.4 km
/--/
Zone: NWR
PF# 3
Speed: 60
Elev: 428m
21:30
21:40
Day: 1
Remote Location Quota Starting and Charting Station
54.6 km
8 intermediate stations
00:55
#10
-323.8 km
/==/
Zone: NWR
PF# 3
Speed: 45
Elev: 386m
22:35
22:37
Day: 1
7.6 km
0 intermediate stations
00:10
#11
-316.2 km
%==%
Zone: NWR
PF# 1
Speed: 79
Elev: 369m
22:47
22:49
Day: 1
27.7 km
2 intermediate stations
00:21
#12
-288.6 km
%==%
Zone: NWR
PF#: 1
Speed: 57
Elev: 390m
23:10
23:12
Day: 1
29.6 km
3 intermediate stations
00:31
#13
-259.0 km
/==/
Zone: NWR
PF# 1
Speed: 85
Elev: 426m
23:43
23:46
Day: 1
43.7 km
3 intermediate stations
00:31
#14
-215.3 km
/==/
Zone: NWR
PF# 1
Speed: 73
Elev: 340m
00:17
00:20
Day: 2
99.5 km
10 intermediate stations
01:22
#15
-115.8 km
/--/
Zone: NWR
PF# 1
Speed: 74
Elev: 296m
01:42
01:47
Day: 2
51.7 km
4 intermediate stations
00:42
#16
-64.1 km
/--/
Zone: NWR
PF# 1
Speed: 66
Elev: 322m
02:29
02:31
Day: 2
32.1 km
1 intermediate stations
00:29
#17
-32.0 km
/--/
Zone: NWR
PF# 1
Speed: 28
Elev: 275m
03:00
03:02
Day: 2
32.0 km
2 intermediate stations
01:08
#18
0.0 km
/--/
Zone: NWR
PF# 1
Speed: 23
Elev: 235m
04:10
04:20
Day: 2
Remote Location Quota Starting and Charting Station
Xing with 14722/Abohar - Jodhpur Express | Sun,Tue,Wed,Sat
3.9 km
0 intermediate stations
00:10
#19
3.9 km
/--/
Zone: NWR
PF# 2
Speed: 77
Elev: 228m
04:30
04:32
Day: 2
75.8 km
7 intermediate stations
00:59
#20
79.7 km
/--/
Zone: NWR
PF# 1
Speed: 85
Elev: 193m
05:31
05:33
Day: 2
39.7 km
2 intermediate stations
00:28
#21
119.3 km
/--/
Zone: NWR
PF# 1
Speed: 72
Elev: 198m
06:01
06:03
Day: 2
62.6 km
5 intermediate stations
00:52
#22
181.9 km
/--/
Zone: NWR
PF# 3
Speed: 62
Elev: 171m
06:55
07:00
Day: 2
24.8 km
3 intermediate stations
00:24
#23
206.8 km
/--/
Zone: NWR
PF# 1
Speed: 45
Elev: 177m
07:24
07:26
Day: 2
25.3 km
1 intermediate stations
00:34
#24
232.0 km
/--/
Zone: NWR
PF# 1
Speed: 76
Elev: 184m
08:00
08:25
Day: 2
Rake Reversal (the train reverses direction)
37.8 km
5 intermediate stations
00:30
#25
269.8 km
/--/
Zone: NWR
PF# 1
Speed: 33
Elev: 183m
08:55
08:57
Day: 2
29.1 km
2 intermediate stations
00:53
#26
299.0 km
/--/
Zone: NWR
PF# 2

Elev: 176m
09:50

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy