Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

WAP-7 - दिल तुझपे कुर्बान

Search PNRs
Post PNR

PNR: 244-xxxxxxx

PNR Forum Entry# 3261324
PREDICTIONS: confirm:6  rac:0  waitlist:0 
Journey: Fri May 04, 2018
Departure: BSB/Varanasi Junction @ 05:25 PF#: 6
Arrival: BRC/Vadodara Junction @ 07:05 +1 night PF#: 6
Distance: 1531 km / 1613 km
Travel Time: 25h 40m  10 halts
Class: AC 3-tier - 3A   |   Tot Seats: Avbl-0039#   |   Charting: < 23:00

Latest Status as of: May 03 2018 (22:32)
Passenger 1: Confirmed: [SU]/SU (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart PREPARED

Show Full PNR Status History (7 statuses)
Status as of: May 03 2018 (22:32)
Passenger 1: Confirmed: B1/32 [SU]/SU (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart PREPARED

Status as of: May 03 2018 (21:27)
Passenger 1: RAC# 3 (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart NOT Prepared

Status as of: May 02 2018 (15:28)
Passenger 1: RAC# 4 (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart NOT Prepared

Status as of: May 01 2018 (02:24)
Passenger 1: RAC# 5 (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart NOT Prepared

Status as of: Apr 09 2018 (03:31)
Passenger 1: WL# 3 (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart NOT Prepared

Status as of: Apr 03 2018 (20:28)
Passenger 1: WL# 4 (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart NOT Prepared

Status as of: Apr 02 2018 (02:57)
Passenger 1: WL# 5 (GN) (Booking Status: WL# 9)
Total Fare:  1910
Chart NOT Prepared

Varanasi - Ekta Nagar (Kevadiya) Mahamana Express/20904
Other Trains in the News
The Shortest Route between BSB and BRC is 192 km (13%) shorter.
Travel Time: 25h 40m     10 halts
Distance: 1531 km     Avg Speed: 60 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 05:25
Varanasi Junction/BSB 
Platform# 6
 
 
 
 
Thu
 
 
Arrives @ 07:05 +1 night
BRC/Vadodara Jn 
Platform# 6
 
 
 
 
 
Fri
 
Type: SuperFast
Rake Zone: WR/Western
Latest News
(You need to double-check/verify this info yourself)
🔹Due to the non-interlocking work at Varanasi Yard over Lucknow division of Northern Railways, train no. 20904/Varanasi - Ekta Nagar (Kevadiya) Mahamana Express JCO 07/09/2023 to 12/10/2023 will be fully cancelled.
Mon Sep 04, 2023 (09:54AM)
News History
◉ JCO 24.06.21 will be attached with 1 extra Sleeper coach to clear extra rush.
Wed Jun 16, 2021 (09:06AM)
0 Follows
Rating: 3.8/5 (30 votes)
cleanliness - good (5)
punctuality - good (5)
food - good (5)
ticket avbl - good (5)
u/r coach - good (5)
railfanning - good (5)
safety - good (5)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Sep 23, 2017
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 H1
  4
 A1
  5
 A2
  6
 B1
  7
 B2
  8
 B3
  9
 B4
 18
 S6
 17
 S5
 16
 S4
 15
 S3
 14
 S2
 13
 S1
 12
 PC
 11
 B6
 10
 B5
 19
 S7
 20
 S8
 21
 GS
 22
EOG
 BRC
Loco/Rake Reversals
BRC/Vadodara Junction

Show ALL intermediate Stations

10 halts. 214 intermediate Stations between Varanasi Junction and Vadodara Junction
#1
0.0 km
/==/
Zone: NR
PF# 6
Speed: 65
Elev: 77m

05:25
Day: 1
156.1 km
22 intermediate stations
02:50
#2
156.1 km
/==/
Zone: NCR
PF# 3
Speed: 53
Elev: 95m
08:15
08:17
Day: 1
170.2 km
24 intermediate stations
03:13
#3
326.2 km
/==/
Zone: WCR
PF# 1
Speed: 84
Elev: 315m
11:30
11:35
Day: 1
Remote Location Quota Starting and Charting Station
98.4 km
10 intermediate stations
01:10
#4
424.6 km
/==/
Zone: WCR
PF# 5
Speed: 57
Elev: 381m
12:45
12:50
Day: 1
90.8 km
10 intermediate stations
01:35
#5
515.5 km
/==/
Zone: WCR
PF# 1,2
Speed: 65
Elev: 411m
14:25
14:35
Day: 1
Remote Location Quota Starting and Charting Station
244.4 km
25 intermediate stations
03:45
#6
759.9 km
/==/
Zone: WCR
Speed: 60
Elev: 329m
18:20
18:30
Day: 1
Remote Location Quota Starting and Charting Station
306.9 km
44 intermediate stations
05:05
#7
1066.8 km
/==/
Zone: CR
Speed: 47
Elev: 205m
23:35
23:40
Day: 1
Remote Location Quota Starting and Charting Station
78.8 km
8 intermediate stations
01:40
#8
1145.7 km
/==/
Zone: WR
PF# 1
Speed: 69
Elev: 186m
01:20
01:22
Day: 2
95.3 km
12 intermediate stations
01:23
#9
1241.0 km
/==/
Zone: WR
PF# 1
Speed: 70
Elev: 203m
02:45
02:55
Day: 2
160.8 km
25 intermediate stations
02:18
#10
1401.8 km
/==/
Zone: WR
PF# 1
Speed: 81
Elev: 59m
05:13
05:18
Day: 2
Remote Location Quota Starting and Charting Station
59.2 km
12 intermediate stations
00:44
#11
1460.9 km
/==/
Zone: WR
PF# 3
Speed: 69
06:02
06:04
Day: 2
70.6 km
12 intermediate stations
01:01
#12
1531.5 km
/==/
Zone: WR
PF# 6
Speed: 49
Elev: 36m
07:05
07:20
Day: 2
Rake Reversal (the train reverses direction)
81.7 km
13 intermediate stations
01:40
#13
1613.1 km
/--/
Zone: WR
PF# 1

Elev: 57m
09:00

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy