Shiv Ganga Express: mera bhola hai bhandari, karta Shiv Ganga ki sawari... Kashi Vishwanath Re, ohh bholenath Re... - Divyanshu Gupta Search PNRs
Main
PNR #Follows
Recent Refreshes
Recent Refresh Requests
Blank PNRs
New PNRs
Recent Predictions
Recent Stampings
Surprises
Past Un-Stamped
Today's PNRs
Today's Un-Stamped
Tomorrow's PNRs
Tomorrow's Un-Stamped
Please wait...
PNR: 420-xxxxxxx
Latest Status as of: May 09 (20:33)
Passenger 1:
CAN (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart Prepared refreshed by: 1243573/Siddharth98^~ Show Full PNR Status History (13 statuses) Status as of: May 09 (20:33)
Passenger 1:
CAN (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart Prepared refreshed by: 1243573/Siddharth98^~ Status as of: May 06 (18:42)
Passenger 1:
Cancelled: CAN (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 1777975/jishnuthakur12301^~ Status as of: May 06 (11:51)
Passenger 1:
RAC: RAC:41 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 12/moderator^~ Status as of: May 06 (10:07)
Passenger 1:
RAC: RAC:44 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 12/moderator^~ Status as of: May 06 (05:34)
Passenger 1:
RAC: RAC:47 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 12/moderator^~ Status as of: May 05 (22:56)
Passenger 1:
RAC: RAC:49 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 12/moderator^~ Status as of: May 04 (22:58)
Passenger 1:
RAC: RAC:55 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: May 04 (19:30)
Passenger 1:
RAC: RAC:55 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 1136519/BangaloreMail^~ Status as of: May 04 (04:47)
Passenger 1:
RAC: RAC:55 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 12/moderator^~ Status as of: May 01 (21:36)
Passenger 1:
Waiting: WL:16 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: Apr 30 (21:28)
Passenger 1:
Waiting: WL:18 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 42126/Jayashree^ Status as of: Apr 30 (20:19)
Passenger 1:
Waiting: WL:18 (Booking Status:
WL:35:GN )
Total Fare: 2895 Chart NOT Prepared refreshed by: 1108853/Brandon12663^~ Status as of: Apr 30 (20:05)
Travel Time:
24h 50m 9 halts Distance: 1672 km Avg Speed: 67 km/hr Type: Rajdhani
Rake Zone: SWR/South Western
Latest News (You need to double-check/verify this info yourself) 🔹Train no. 22691/K.S.R. Bengaluru - Hazrat Nizamuddin Rajdhani Express JCO 08/12/2023 to 08/02/2024 will be diverted to run via Penukonda Jn, Nagasamudram and Dharmavaram Jn skipping stoppage at Sathya Sai Prashanti Nilayam (SSPN) railway station.Fri Dec 01, 2023 (05:48PM)
News History Will depart from SBC at 01;30 of 29.07.23 instead of 20;00 of 28.07.23.Fri Jul 28, 2023 (05:19PM)
..Fri Jun 03, 2022 (11:52AM)
Limited packed food items and packaged drinking water MAY be available on payment basis. Kindly check before hand. This is as per Standard Operating Protocol.Wed Dec 01, 2021 (10:27PM)
Rating: 4.4 /5 (309 votes)
punctuality - excellent (54)
railfanning - excellent (51)
Bedroll/Linen :
AVAILABLE change Inaugural Run Sun Nov 01, 1992
Pantry/Catering ✓ Pantry Car ✓ On-board Catering ✓ E-Catering
Day1- Dinner . Day 2- Morning tea , Breakfast , ...
more... Lunch , Evening Snacks , Rasam ,Dinner .
LHB Rake
Rake/Coach Position RSA - Rake Sharing NO RSA. 4 Dedicated Rakes. PM at SBC
9 halts. 246 intermediate Stations between KSR Bengaluru City Junction (Bangalore) and Bhopal Junction
159.6 km
22 intermediate stations
02:23
134.7 km
15 intermediate stations
02:20
121.8 km
15 intermediate stations
01:33
142.9 km
18 intermediate stations
02:05
147.3 km
29 intermediate stations
02:34
Remote Location Quota Starting and Charting Station
131.7 km
20 intermediate stations
01:33
235.0 km
34 intermediate stations
03:30
208.5 km
32 intermediate stations
02:30
Remote Location Quota Starting and Charting Station
298.4 km
39 intermediate stations
04:16
91.9 km
13 intermediate stations
01:32
Remote Location Quota Starting and Charting Station
291.8 km
39 intermediate stations
03:16
97.5 km
11 intermediate stations
00:58
118.2 km
13 intermediate stations
01:34
187.7 km
29 intermediate stations
02:33
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.