Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

হাওড়া - বর্দ্ধমান কর্ড লাইনে যান, 130 কিমি বেগে ট্রেন যাওয়াও কালবৈশাখী ঝড়ের থেকে ভয়ঙ্কর! - Jishnu Thakur

Search PNRs
Post PNR

PNR: 643-xxxxxxx

PNR Forum Entry# 6049241
PREDICTIONS: confirm:9  rac:0  waitlist:0 
Journey: Fri May 03, 2024
Departure: GHY/Guwahati @ 06:05 PF#: 3
Arrival: ROK/Rohtak Junction @ 14:08 +1 night PF#: 2
Distance: 1972 km / 2897 km
Travel Time: 32h 3m  10 halts
Class: Sleeper - SL   |   Charting: < 20:30

Latest Status as of: May 02 (23:01)
Passenger 1: CAN (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart Prepared
refreshed by: 42126/Jayashree^

Show Full PNR Status History (13 statuses)
Status as of: May 02 (23:01)
Passenger 1: CAN (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart Prepared
refreshed by: 42126/Jayashree^

Status as of: May 02 (19:56)
Passenger 1: Cancelled: CAN (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 574484/Shalabh^~

Status as of: May 02 (18:03)
Passenger 1: Waiting: RLWL:4 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 1108853/Brandon12663^~

Status as of: May 02 (17:42)
Passenger 1: Waiting: RLWL:4 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 1356619/rocket^~

Status as of: May 02 (15:13)
Passenger 1: Waiting: RLWL:4 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 53414/Yusuf_Azhar^

Status as of: May 02 (14:13)
Passenger 1: Waiting: RLWL:4 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 12/moderator^~

Status as of: May 02 (11:11)
Passenger 1: Waiting: RLWL:5 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 12/moderator^~

Status as of: May 02 (06:52)
Passenger 1: Waiting: RLWL:7 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 248735/ForeverRailfan^~

Status as of: May 01 (21:54)
Passenger 1: Waiting: RLWL:7 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 1243573/Siddharth98^~

Status as of: May 01 (14:22)
Passenger 1: Waiting: RLWL:8 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 12/moderator^~

Status as of: Apr 30 (23:14)
Passenger 1: Waiting: RLWL:9 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 574484/Shalabh^~

Status as of: Apr 30 (23:04)
Passenger 1: Waiting: RLWL:9 (Booking Status: RLWL:41:GN)
Total Fare:  770
Chart NOT Prepared
refreshed by: 1243573/Siddharth98^~

Status as of: Apr 30 (22:45)

Tripura Sundari Express (PT)/14619
Other Trains in the News
Compare with the Shortest Route between Guwahati and Rohtak Jn.
Travel Time: 32h 3m     10 halts
Distance: 1972 km     Avg Speed: 62 km/hr
Max Permissible Speed: 130 km/hr between NEO/Neora and CPYZ/Chipyana Buzurg
Departs @ 06:05
Guwahati/GHY 
Platform# 3
 
 
 
 
 
Fri
 
Arrives @ 14:08 +1 night
ROK/Rohtak Jn 
Platform# 2
 
 
 
 
 
 
Sat
Type: Mail/Express
Rake Zone: NR/Northern
Latest News
(You need to double-check/verify this info yourself)
🔹Due to the upcoming G20 Summit Meeting in New Delhi, train no. 14619/Tripura Sundari Express (PT) JCO 07/09/2023 will have stoppage at Sahibabad railway station.
Sun Sep 03, 2023 (12:30AM)
News History
🔹 Due to Traffic Block on Dankaur- Chipiana and Delhi Sarai Rohilla-Rewari Section, train no. 14619/Tripura Sundari Express (PT) JCO 04.05.2023 will be regulated for 180minutes in NCR.
Mon May 01, 2023 (07:47AM)
Services resumed from 28/07/2022.
Sat Jul 16, 2022 (12:35PM)
Cancelled Till 14 July 2022 Due To Assam Floods.
Sun Jul 03, 2022 (08:01PM)
➡️ दिनांक 07 जुलाई, 2022 को अगरतला से खुलने वाली गाड़ी संख्या 14619 अगरतला-फिरोजपुर त्रिपुरा सुंदरी एक्सप्रेस को पं.दीन दयाल उपाध्याय जं.-लखनऊ-मुरादाबाद-गाजियाबाद के रास्ते चलायी जायेगी।
Wed Jun 15, 2022 (10:21PM)
Train Will Remain Cancelled Till 30th June Due To Restoration Work Going On After Flood In Assam.
Fri Jun 03, 2022 (10:24PM)
JCO 24.02.2022 will remain cancelled due to NI work in RNY division of NF railway for commissioning of double line.
Wed Feb 23, 2022 (03:40PM)
JCO 24.02.2022 will remain cancelled due to NI work in RNY division of NF railway for commissioning of double line.
Wed Feb 23, 2022 (03:40PM)
JCO 13.01.2022 diverted via NCB - MHBA - YSLC - RQJ
Fri Jan 14, 2022 (09:16AM)
-
Sat Dec 25, 2021 (10:34AM)
▣ Coach Composition ▸ 2A—2, 3A—6, PC—1, SL—7, 2S—4, EOG—2 ▣
Wed Aug 18, 2021 (02:59PM)
2 Follows
Rating: 3.7/5 (72 votes)
cleanliness - good (13)
punctuality - average (15)
food - good (11)
ticket avbl - good (11)
u/r coach - good (13)
railfanning - excellent (11)
safety - good (11)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sun Jul 31, 2016
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is Available at BPB, GHY, NJP, KIR, BJU, NDLS, ROK,...
more...
BNW, HSR, SSA, BTI & FZR.
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 H1
  3
 A1
  4
 A2
  5
 B1
  6
 B2
  7
 B3
  8
 B4
  9
 B5
 18
 S7
 17
 S6
 16
 S5
 15
 S4
 14
 S3
 13
 S2
 12
 S1
 11
 PC
 10
 B6
 19
GEN
 20
GEN
 21
GEN
 22
EOG
 23
HCP
 BNW
RSA - Rake Sharing
No RSA • 01 Rake • PM @ FZR • SM @ AGTL

Show ALL intermediate Stations

10 halts. 337 intermediate Stations between Guwahati and Rohtak Junction
#1
-570.8 km
%--%
Zone: NFR
PF# 1
Speed: 54
Elev: 22m

15:10
Day: 1
66.9 km
4 intermediate stations
01:14
#2
-503.8 km
/--/
Zone: NFR
PF# 1
Speed: 49
Elev: 90m
16:24
16:26
Day: 1
72.5 km
7 intermediate stations
01:29
#3
-431.3 km
/--/
Zone: NFR
Speed: 63
Elev: 30m
17:55
17:57
Day: 1
34.5 km
6 intermediate stations
00:33
#4
-396.9 km
/--/
Zone: NFR
PF#: 1
Speed: 43
Elev: 27m
18:30
18:32
Day: 1
29.9 km
6 intermediate stations
00:42
#5
-366.9 km
/--/
Zone: NFR
PF# 1
Speed: 31
Elev: 18m
19:14
19:16
Day: 1
17.3 km
3 intermediate stations
00:34
#6
-349.6 km
/--/
Zone: NFR
Speed: 34
Elev: 20m
19:50
20:00
Day: 1
Remote Location Quota Starting and Charting Station.
71.0 km
9 intermediate stations
02:05
#7
-278.6 km
%--%
Zone: NFR
PF# 1
Speed: 33
Elev: 437m
22:05
22:10
Day: 1
98.0 km
16 intermediate stations
03:00
#8
-180.5 km
/--/
Zone: NFR
Speed: 49
Elev: 138m
01:10
01:25
Day: 2
Rake Reversal (the train reverses direction)
Remote Location Quota Starting and Charting Station.
45.0 km
5 intermediate stations
00:55
#9
-135.5 km
/==/
Zone: NFR
PF# 1
Speed: 69
Elev: 77m
02:20
02:22
Day: 2
78.6 km
9 intermediate stations
01:08
#10
-57.0 km
/==/
Zone: NFR
PF# 1
Speed: 25
03:30
03:32
Day: 2
57.0 km
11 intermediate stations
02:18
#11
0.0 km
/==/
Zone: NFR
PF# 3
Speed: 68
Elev: 59m
05:50
06:05
Day: 2
Remote Location Quota Starting and Charting Station.
182.3 km
18 intermediate stations
03:20
#12
182.3 km
/==/
Zone: NFR
PF# 1A,1B
Speed: 61
Elev: 60m
09:25
09:30
Day: 2
Xing with 15657/Brahmaputra Mail | Fri
250.8 km
34 intermediate stations
04:05
#13
433.1 km
/==/
Zone: NFR
PF# 3,5
Speed: 53
Elev: 114m
13:35
13:45
Day: 2
Remote Location Quota Starting and Charting Station.
183.8 km
34 intermediate stations
03:30
#14
616.8 km
/==/
Zone: NFR
PF# 5
Speed: 68
Elev: 32m
17:15
17:25
Day: 2
181.0 km
32 intermediate stations
02:40
#15
797.9 km
/==/
Zone: ECR
PF# 5
Speed: 46
Elev: 48m
20:05
20:15
Day: 2
108.2 km
25 intermediate stations
02:20
#16
906.0 km
/==/
Zone: ECR
PF# 1,2
Speed: 67
Elev: 53m
22:35
22:45
Day: 2
207.6 km
49 intermediate stations
03:05
#17
1113.6 km
/==/
Zone: ECR
PF# 6
Speed: 76
Elev: 79m
01:50
02:00
Day: 3
152.6 km
21 intermediate stations
02:00
#18
1266.3 km
/==/
Zone: NCR
PF# 1
Speed: 83
Elev: 97m
04:00
04:05
Day: 3
194.5 km
29 intermediate stations
02:20
#19
1460.7 km
/==/
Zone: NCR
PF# 1
Speed: 72
Elev: 127m
06:25
06:30
Day: 3
440.2 km
68 intermediate stations
06:05
#20
1901.0 km
/==/
Zone: NR
Speed: 28
Elev: 214m
12:35
12:50
Day: 3
11.5 km
6 intermediate stations
00:25
#21
1912.5 km
/==/
Zone: NR
PF# 2
Speed: 70
Elev: 217m
13:15
13:17
Day: 3
59.6 km
11 intermediate stations
00:51
#22
1972.1 km
/==/
Zone: NR
PF# 2
Speed: 42
Elev: 219m
14:08
14:10
Day: 3
49.3 km
6 intermediate stations
01:10
#23
2021.4 km
%==%
Zone: NWR
PF# 1
Speed: 65
Elev: 217m
15:20
15:45
Day: 3
Rake Reversal (the train reverses direction)
Loco Change From Electric to Diesel
59.9 km
8 intermediate stations
00:55
#24
2081.3 km
/--/
Zone: NWR
PF# 1
Speed: 70
Elev: 212m
16:40
16:50
Day: 3
29.1 km
2 intermediate stations
00:25
#25
2110.4 km
/--/
Zone: NWR
PF#: 1
Speed: 50
Elev: 211m
17:15
17:17
Day: 3
52.9 km
7 intermediate stations
01:03
#26
2163.2 km
/--/
Zone: NWR
PF# 1
Speed: 74
Elev: 203m
18:20
18:25
Day: 3
33.4 km
2 intermediate stations
00:27
#27
2196.7 km
/--/
Zone: NWR
PF#: 1
Speed: 28
Elev: 205m
18:52
18:54
Day: 3
42.2 km
7 intermediate stations
01:31
#28
2238.9 km
/--/
Zone: NR
PF# 1
Speed: 75
20:25
20:50
Day: 3
42.6 km
5 intermediate stations
00:34
#29
2281.5 km
/--/
Zone: NR
Speed: 51
Elev: 209m
21:24
21:26
Day: 3
12.9 km
1 intermediate stations
00:15
#30
2294.4 km
/--/
Zone: NR
Speed: 34
Elev: 204m
21:41
21:43
Day: 3
32.2 km
3 intermediate stations
00:57
#31
2326.6 km
/--/
Zone: NR
PF# 2

Elev: 199m
22:40

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy