22222/22221-->Aapli Rajdhani, Asli VIP number waali - Somanko Search PNRs
Main
PNR #Follows
Recent Refreshes
Recent Refresh Requests
Blank PNRs
New PNRs
Recent Predictions
Recent Stampings
Surprises
Past Un-Stamped
Today's PNRs
Today's Un-Stamped
Tomorrow's PNRs
Tomorrow's Un-Stamped
Please wait...
PNR: 241-xxxxxxx
Journey: Sun May 26, 2024
Departure: NK/Nashik Road @ 17:25
PF#: 3
Arrival: CSMT/Mumbai CSM Terminus @ 22:45
PF#: 0
Distance: 184 km / 1424 km
Travel Time: 5h 20m 3 halts
Class: Sleeper - SL |
Charting: < 21:30
Latest Status as of: May 26 (18:17)
Passenger 1:
Confirmed: CNF:S1:40 (Booking Status:
RLWL:22:GN )
Passenger 2:
Confirmed: CNF:S1:48 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart Prepared refreshed by: 42126/Jayashree^ Show Full PNR Status History (9 statuses) Status as of: May 26 (18:17)
Passenger 1:
Confirmed: CNF:S1:40 (Booking Status:
RLWL:22:GN )
Passenger 2:
Confirmed: CNF:S1:48 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart Prepared refreshed by: 42126/Jayashree^ Status as of: May 25 (17:28)
Passenger 1:
Confirmed: CNF:S1:40:SU (Booking Status:
RLWL:22:GN )
Passenger 2:
Confirmed: CNF:S1:48:SU (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart NOT Prepared refreshed by: 2098140/Anwarali^~ Status as of: May 25 (06:52)
Passenger 1:
Waiting: RLWL:19 (Booking Status:
RLWL:22:GN )
Passenger 2:
Waiting: RLWL:20 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart NOT Prepared refreshed by: 1108853/Brandon12663^~ Status as of: May 24 (23:45)
Passenger 1:
Waiting: RLWL:19 (Booking Status:
RLWL:22:GN )
Passenger 2:
Waiting: RLWL:20 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart NOT Prepared refreshed by: 12/moderator^~ Status as of: May 20 (22:53)
Passenger 1:
Waiting: RLWL:19 (Booking Status:
RLWL:22:GN )
Passenger 2:
Waiting: RLWL:20 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: May 19 (03:06)
Passenger 1:
Waiting: RLWL:20 (Booking Status:
RLWL:22:GN )
Passenger 2:
Waiting: RLWL:21 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart NOT Prepared refreshed by: 12/moderator^~ Status as of: May 15 (22:52)
Passenger 1:
Waiting: RLWL:20 (Booking Status:
RLWL:22:GN )
Passenger 2:
Waiting: RLWL:21 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart NOT Prepared refreshed by: 1243573/Siddharth98^~ Status as of: May 15 (17:28)
Passenger 1:
Waiting: RLWL:20 (Booking Status:
RLWL:22:GN )
Passenger 2:
Waiting: RLWL:21 (Booking Status:
RLWL:23:GN )
Total Fare: 350 Chart NOT Prepared refreshed by: 718732/Rai_abhi^~ Status as of: May 15 (15:24)
Travel Time:
5h 20m 3 halts Distance: 184 km Avg Speed: 34 km/hr Type: SuperFast
Rake Zone: NER/North Eastern
Latest News (You need to double-check/verify this info yourself) JCO 13.06.24 is rescheduled by 01:00 hrs.Tue Jun 11, 2024 (10:31PM)
News History JCO 16.05.24 to 29.05.24 will be short terminated at Dadar Central (DR)Fri May 17, 2024 (08:29AM)
Train will short terminate at Dadar JCO 18.11.2022 & 19.11.2022Sat Nov 12, 2022 (08:46AM)
Will be regulated at Waghoda from 13:00 hrs to 15:20 hrs for JCO 11.01.2022Wed Jan 12, 2022 (10:24AM)
To be upgraded into LHB Rake w.e.f 30 - 10 - 2021 at LJN end & 01 - 11 - 2021 at CSMT end. Revised Coach Composition (LHB Rake) :. GS/2S - 02,SL - 05,AC 3Tier (Economy) - 02, AC 3Tier (Normal) - 04, AC 2Tier - 01,AC 1st Class - ...
more... 01,PantryCar - 01, EOG - 01,LSLRD - 01 Total:. 18CoachesMon Aug 23, 2021 (07:14PM)
Rating: 3.9 /5 (219 votes)
cleanliness - excellent (37)
ticket avbl - average (39)
railfanning - excellent (36)
Bedroll/Linen :
AVAILABLE change Inaugural Run Wed Apr 01, 1987
Pantry/Catering ✓ Pantry Car ✓ On-board Catering ✓ E-Catering
LHB Rake
Rake/Coach Position RSA - Rake Sharing No RSA. An ISO certified train, CDO at LJN; 3 Rakes
3 halts. 54 intermediate Stations between Nashik Road and Mumbai CSM Terminus
54.4 km
9 intermediate stations
00:55
17.5 km
2 intermediate stations
00:43
106.4 km
17 intermediate stations
01:27
113.9 km
11 intermediate stations
02:06
90.4 km
12 intermediate stations
01:07
201.4 km
26 intermediate stations
02:58
Remote Location Quota Starting and Charting Station.
6.2 km
0 intermediate stations
00:12
85.6 km
12 intermediate stations
01:31
183.4 km
24 intermediate stations
02:58
123.6 km
19 intermediate stations
01:50
184.1 km
22 intermediate stations
02:23
73.0 km
8 intermediate stations
01:02
50.6 km
6 intermediate stations
00:57
81.5 km
14 intermediate stations
02:55
42.5 km
22 intermediate stations
00:47
9.0 km
9 intermediate stations
00:30
Scroll to Top
Scroll to Bottom
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has
NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.