Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

đź‘‘King Bole To Mumbai Rajdhani Express - Abdul Rehman

Search PNRs
Post PNR

PNR: 482-xxxxxxx

PNR Forum Entry# 6227669
PREDICTIONS: confirm:3  rac:2  waitlist:0 
Journey: Sun Nov 03, 2024
Departure: TPJ/Tiruchchirappalli Junction @ 14:00 PF#: 4
Arrival: VZM/Vizianagaram Junction @ 12:08 +1 night PF#: 0
Distance: 1247 km / 1878 km
Travel Time: 22h 8m  14 halts
Class: Sleeper - SL   |   Tot Seats: Avbl-0303#

Latest Status as of: Yesterday (17:03)
Passenger 1: Waiting: WL:45 (Booking Status: WL:123:GN)
Total Fare:  580
Chart NOT Prepared
refreshed by: 2086033/RailFansnehashish^~

Show Full PNR Status History (2 statuses)
Status as of: Yesterday (17:03)
Passenger 1: Waiting: WL:45 (Booking Status: WL:123:GN)
Total Fare:  580
Chart NOT Prepared
refreshed by: 2086033/RailFansnehashish^~

Status as of: Yesterday (17:01)

Rameswaram - Bhubaneswar Weekly SF Express (PT)/20895


Other Trains in the News
The Shortest Route between TPJ and VZM is 80 km (6%) shorter.
Travel Time: 22h 8m     14 halts
Distance: 1247 km     Avg Speed: 56 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 14:00
Tiruchchirappalli Junction/TPJ 
Platform# 4
Sun
 
 
 
 
 
 
Arrives @ 12:08 +1 night
VZM/Vizianagaram Jn 
Platform# --
 
Mon
 
 
 
 
 
Type: SuperFast
Rake Zone: ECoR/East Coast
Latest News
(You need to double-check/verify this info yourself)
▪️ Cancelled on 27.10.24
Tue Oct 22, 2024 (08:13PM)
News History
đź”·Train No. 20895 Ramanathapuram Bhubaneswar Superfast Express leaving Ramanathapuram from 06th October to 17th November, 2024 on Sundays will be augmented with One General Second Class Coach đź”·Short origination from Mandapam until further notice
Sat Sep 28, 2024 (09:49AM)
J.C.O 19/05/2024 is Diverted via Manamadurai, Madurai, Dindigul, Trichy. Skipping Stoppage Sivagangai, Karaikudi, Pudukkottai. Additional Stoppage Madurai, Dindigul.
Wed May 15, 2024 (06:31PM)
▪️ Departure from Rameswaram on 20.08.23 & 27.08.23 is cancelled
Sun Aug 13, 2023 (01:34PM)
▪️ Departure from Rameswaram on 11.06.23 will be regulated for 45 mins between Palasa - Brahmapur.
Sat Jun 10, 2023 (01:46PM)
Due to Pamban Bridge Reconstruction, It will Short Originated from Ramanathapuram.
Tue May 09, 2023 (01:55PM)
One temporary third AC coach will be attached on 05.03.2023 to 02.04.2023
Tue Feb 28, 2023 (10:10AM)
·Train No. 20895 Rameswaram - Bhubaneswar Superfast Weekly Express will be temporarily augmented by One AC 3 Tier Coach with effect from 04th December, 2022 to 01st February, 2023 (Sundays)
Sun Dec 04, 2022 (08:45AM)
Permanent augmented with one addition AC 3 tier coach Wef 27/03/22
Mon Mar 21, 2022 (11:42PM)
. Augmented with one sleeper coaches from Rameswaram from 13/02/22
Fri Feb 11, 2022 (09:54AM)
▪️CC:- 2S—2, SL—11, 3AC—4, 2AC—1, PC—1, EOG—2▪️ 📢 For carrying out 5 hrs Traffic cum power Block for LHS work programme between Vizianagaram - Korukunda & Ponduru - Dusi sections of ECoR, train no 08495 will be regulated enroute for 2 hours (i.e 10.50 hrs) on journey commencing on 08.08.2021.
Fri Aug
...
more...
06, 2021 (11:38AM)
2 Follows
Rating: 4.0/5 (24 votes)
cleanliness - average (4)
punctuality - excellent (4)
food - good (4)
ticket avbl - good (4)
u/r coach - average (1)
railfanning - excellent (4)
safety - good (4)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sun May 23, 2010
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 PC
 18
 B7
 17
 B6
 16
 B5
 15
 B4
 14
 B3
 13
 B2
 12
 B1
 11
 A2
 10
 A1
 19
 GS
 20
EOG
VSKP
RSA - Rake Sharing
Loco/Rake Reversals
VSKP/Visakhapatnam Junction


Show ALL intermediate Stations

14 halts. 250 intermediate Stations between Tiruchchirappalli Junction and Vizianagaram Junction
#1
-247.1 km
%--%
Zone: SR
PF# 1
Speed: 95
Elev: 4m

09:15
Day: 1
36.4 km
4 intermediate stations
00:23
#2
-210.7 km
%--%
Zone: SR
PF# 1
Speed: 77
Elev: 7m
09:38
09:40
Day: 1
35.7 km
1 intermediate stations
00:28
#3
-175.0 km
/--/
Zone: SR
PF# 2
Speed: 51
Elev: 42m
10:08
10:10
Day: 1
23.9 km
1 intermediate stations
00:28
#4
-151.0 km
/--/
Zone: SR
PF# 1
Speed: 54
Elev: 67m
10:38
10:40
Day: 1
20.7 km
2 intermediate stations
00:23
#5
-130.3 km
/--/
Zone: SR
PF# 1
Speed: 77
Elev: 105m
11:03
11:05
Day: 1
35.7 km
3 intermediate stations
00:28
#6
-94.6 km
/--/
Zone: SR
PF#: 1
Speed: 49
Elev: 77m
11:33
11:34
Day: 1
4.9 km
0 intermediate stations
00:06
#7
-89.6 km
/--/
Zone: SR
PF# 1
Speed: 61
Elev: 87m
11:40
11:42
Day: 1
36.6 km
4 intermediate stations
00:36
#8
-53.0 km
/--/
Zone: SR
PF# 1
Speed: 35
Elev: 89m
12:18
12:20
Day: 1
53.0 km
6 intermediate stations
01:30
#9
0.0 km
/--/
Zone: SR
PF# 4
Speed: 62
Elev: 86m
13:50
14:00
Day: 1
Loco change from Diesel to Electric
49.7 km
8 intermediate stations
00:48
#10
49.7 km
/==/
Zone: SR
PF# 2
Speed: 79
Elev: 57m
14:48
14:50
Day: 1
39.3 km
8 intermediate stations
00:30
#11
89.1 km
/--/
Zone: SR
PF# 1
Speed: 35
Elev: 32m
15:20
15:25
Day: 1
31.2 km
6 intermediate stations
00:53
#12
120.3 km
/--/
Zone: SR
PF# 3,5
Speed: 46
Elev: 13m
16:18
16:20
Day: 1
20.0 km
3 intermediate stations
00:26
#13
140.3 km
/--/
Zone: SR
PF# 1
Speed: 73
Elev: 6m
16:46
16:47
Day: 1
17.0 km
3 intermediate stations
00:14
#14
157.3 km
/--/
Zone: SR
Speed: 82
Elev: 5m
17:01
17:03
Day: 1
42.5 km
6 intermediate stations
00:31
#15
199.9 km
/--/
Zone: SR
PF# 1
Speed: 25
Elev: 5m
17:34
17:36
Day: 1
42.7 km
7 intermediate stations
01:44
#16
242.6 km
/--/
Zone: SR
PF# 1
Speed: 66
Elev: 43m
19:20
19:25
Day: 1
158.5 km
42 intermediate stations
02:25
#17
401.1 km
%≡≡%
Zone: SR
PF# 6
Speed: 56
Elev: 10m
21:50
22:10
Day: 1
Remote Location Quota Starting and Charting Station
142.0 km
33 intermediate stations
02:33
#18
543.1 km
/==/
Zone: SCR
PF# 2
Speed: 70
Elev: 19m
00:43
00:45
Day: 2
38.4 km
5 intermediate stations
00:33
#19
581.5 km
/==/
Zone: SCR
PF# 2
Speed: 73
Elev: 18m
01:18
01:20
Day: 2
255.2 km
41 intermediate stations
03:30
#20
836.7 km
/==/
Zone: SCR
PF# 7
Speed: 57
Elev: 19m
04:50
05:00
Day: 2
Overtakes 11020/Konark Express | Mon
Xing with 11020/Konark Express | Mon
148.9 km
30 intermediate stations
02:36
#21
985.6 km
/--/
Zone: SCR
Speed: 66
Elev: 14m
07:36
07:38
Day: 2
Experimental basis halt extended for another six months wef 22.09.24
183.4 km
30 intermediate stations
02:47
#22
1169.1 km
/==/
Zone: ECoR
PF# 4
Speed: 37
Elev: 41m
10:25
10:27
Day: 2
17.2 km
4 intermediate stations
00:28
#23
1186.3 km
/==/
Zone: ECoR
PF# 7
Speed: 69
Elev: 6m
10:55
11:15
Day: 2
Rake Reversal (the train reverses direction)
Remote Location Quota Starting and Charting Station
61.1 km
10 intermediate stations
00:53
#24
1247.4 km
/==/
Zone: ECoR
Speed: 73
Elev: 58m
12:08
12:10
Day: 2
216.9 km
27 intermediate stations
02:58
#25
1464.3 km
/==/
Zone: ECoR
PF# 1
Speed: 74
Elev: 20m
15:08
15:10
Day: 2
147.1 km
23 intermediate stations
02:00
#26
1611.4 km
/==/
Zone: ECoR
PF# 4
Speed: 16
Elev: 16m
17:10
17:15
Day: 2
Xing with 12876/Neelachal Express | Mon
19.1 km
3 intermediate stations
01:10
#27
1630.5 km
/==/
Zone: ECoR
PF# 2

Elev: 33m
18:25

Day: 2


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy