Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Once upon a time, there was a great king called Vikramaditya - the WAM-4 - Shashank

Search Forum
Post PNR
Large Station Board;
Entry# 873382-0
no description available
Entry# 4456800-0

HTL/Hatikhali (2 PFs)
हातीखाली
হাতীখালী


Track: Single Electric-Line

Updated: Mar 25 2023 (09:37)
Show ALL Trains
Number of Platforms: 2
Number of Halting Trains: 2
Number of Originating Trains: 0
Number of Terminating Trains: 0
Lumding - Silchar Rd, Hatikhali, Dist - Dima Hassao (N C Hills). Pincode -788832.
State: Assam
Elevation: 216 m above sea level
Type: Regular
Category: NSG-6
Zone: NFR/Northeast Frontier
Division: Lumding
No Recent News for HTL/Hatikhali
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station Forum

Page#    Showing 6 to 9 of 9 blog entries  <<prev  
Pic Upload
52456 views
0

Oct 13 2019 (07:27)   HTL/Hatikhali (2 PFs)
AshishSharma~
AshishSharma~   653 blog posts
Entry# 4456800            Tags  
HTL/Hatikhali railway station
Translate to English
Translate to Hindi
Rail Fanning
61024 views
14

★★
Nov 08 2014 (22:02)   MYD/Manderdisa Junction (2 PFs)
 
JoydeepRoy
JoydeepRoy   14684 blog posts
Entry# 1271245            Tags   Past Edits
A small step brings 18-year-old dream closer- First successful trial of Lumding-Silchar BG track raises hopes of project completion by March 2015
A STAFF REPORTER
Guwahati, Nov. 7: Through the hilly terrain of Dima Hasao, a diesel engine travelled 26km on the newly constructed broad gauge tracks, sending the message that the day was not far when it would travel the entire stretch of 210km between Lumding and Silchar.
Officials
...
more...
of the construction division of NF Railway today said the diesel engine would zoom through 17 tunnels and 500 bridges in Borail hills by March 31, 2015, ending an 18-year-long wait of the people of Barak Valley.
The clock struck 9.25 last morning when the engine left Patharkhola railway station in Nagaon district of Assam amid cheers. It crossed Manderdisa and Hatikhali stations and reached Debalong at 12.45pm. Then it returned and reached Patharkhola at 3.35pm. It was a perfect ride.
The six-month mega block had begun on October 1 amidst doubts in some quarters about the timely completion of the project. The doubts were not unfounded though, as the broad gauge conversion project has been delayed by 18 years because of factors ranging from militancy to hostile terrain.
"Now we can confidently say that we will be able to run the broad gauge engine by March 31," a railway official said. "So far, we have completed the cut-and-connect activity at 90 of the 102 locations. Eight lakh cubic metres of earthwork, out of 12 lakh cubic metres, was completed during the mega block. Track-linking of the broad gauge line is also progressing satisfactorily at various locations on the Lumding-Silchar route," he added.
On October 19, the railway made a major breakthrough in the project when it managed to complete the difficult task of linking Tunnel No. 10 from both ends. The 3,095-metre tunnel located near New Haflong town is the longest and took several years to construct.
"After completion of Tunnel No. 10, the trial run of the diesel engine was another major accomplishment for us. It has brought great delight to those involved with the conversion process," the official said.
Since a major stretch of the project is located in hilly terrain, the existing metre gauge (MG) alignment has sharp curves and steep gradients not permitted in a broad gauge (BG) alignment. Therefore, the BG alignment does not follow the MG alignment and criss-crosses the MG track at 102 locations.
The Lumding-Silchar gauge conversion, which is a part of the national project, GC of Lumding-Silchar and branch lines, covers 420.26km at a cost of Rs 5,185.44 crore. Till July this year, its expenditure was Rs 4,306.42 crore. It involves the construction of a 54-metre tall and 705-metre long bridge over the Dayang. The maximum permissible speed of train will be 70km per hour in hill stations and 100km per hour in the plains.
Because of shortage of skilled labourers in the area, the railway has brought 3,000 additional workers from other places to work in this section
source : click here

Translate to English
Translate to Hindi

2 Posts

50760 views
2

Nov 09 2014 (11:36)
Vaibhav Agarwal   6716 blog posts
Re# 1271245-3            Tags   Past Edits
Engine reaching Hatikhali
Translate to English
Translate to Hindi

2 Posts

50290 views
2

Jan 13 2015 (01:25)
JoydeepRoy
JoydeepRoy   14684 blog posts
Re# 1271245-6            Tags   Past Edits
First Broad Gauge Diesel Engine Rolled From Patharkhola to Debalong Station of Lumding-Silchar GC Project
source : click here
Translate to English
Translate to Hindi
Info Update
28427 views
10

Nov 07 2014 (07:54)   HTL/Hatikhali (2 PFs)
 
NFR_LMG~
NFR_LMG~   3709 blog posts
Entry# 1269421            Tags   Past Edits
Breaking News
BG Engine WDM reached Hatikhali fromLumding
Major Achievement of LMG-SCL GC
Translate to English
Translate to Hindi

More Posts
General Travel
24285 views
1

Oct 10 2013 (14:56)   HTL/Hatikhali (2 PFs)
 
sajithpr
sajithpr   323 blog posts
Entry# 873382            Tags  
SB
Source: click here
Translate to English
Translate to Hindi

More Posts
Page#    Showing 6 to 9 of 9 blog entries  <<prev  

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy