Bengaluru Coimbatore VB and Uday had very good occupancy today though weekday and long holiday weekend starts from tomorrow afternoon. As the dep time is 1415 IT professional or working class may not prefer aa they need to start from workplace by 1200 or 1300. Irony is both of leave at the same time and arrive at same time with different fare structure and Comfort. VB doesn't have advantage of IT corridor localities while Uday has stoppage at KR Puram gateway to East IT corridor. Next need to check the current availability from BNC to Hosur to ascertain who are the prime patronage provider.
Jan 23 2024 (15:27) Station Tag: Bengaluru Cantt. (Bangalore)/BNC added by PrakharYadav^~/622971
Can the new platforms at BNC accommodate 22 coaches and trains? Did that also imply that? What about trains with such a short turnaround time? Intercity, Brindavan, Lalbagh, etc. should be shifted here.
54th V2.0 Rake which was allocated to SR has now been transferred to SWR. 50th V2.0 Rake fitted with HRPT which was allocated to WR has now been transferred to NR. 56th V2.0 Rake allocated to NR. 57th V2.0 Rake fitted with HRPT allocated to WR. 58th... more...
V2.0 Rake allocated to SWR. 59th V2.0 Rake allocated to SER.
54th V2.0 train set that was given to SR has now been sent to SWR. 50th V2.0 train set with fancy high-speed seats that was given to WR has now been sent to NR. 56th V2.0 train set given to NR. 57th V2.0 train set with fancy high-speed seats given to WR. 58th V2.0 train set given to SWR. 59th V2.0 train set given to SER.
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.