Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हम RailFan - हमेशा पंखों पे

Search Forum
Post PNR
Large Station Board;
Entry# 941652-0
Large Station Board;
Entry# 2076807-5
Large Station Board;
Entry# 2076807-5

SSPH/Satish Samanta P.H. (2 PFs)
सतीश सामंत हॉल्ट
সতীশ সামন্ত হল্ট


Track: Double Electric-Line

Show ALL Trains
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Mahishadal Geonkhali Road , near Mahisadal Girls College , Dist - Purba Medinipur - 721628
State: West Bengal
Elevation: 8 m above sea level
Type: Regular
Category: n/a
Zone: SER/South Eastern
Division: Kharagpur
No Recent News for SSPH/Satish Samanta P.H.
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Station Forum

Page#    Showing 1 to 5 of 12 blog entries  next>>
Rail Fanning
92477 views
11

Dec 01 2016 (11:44)   SSPH/Satish Samanta P.H. (2 PFs)
AvradipTMZ^~
AvradipTMZ^~   3913 blog posts
Entry# 2076807            Tags  
Current update on the ongoing doubling work at SSPH, after the last updates /blog/post/1606708 and /blog/post/1330465 . Great news, the 2nd line has been laid fully with all required electrification work. Now it is connected from both the sides, KSBP and MSDL. The new PF has been ready (almost ~ 95%).
.
All the pics were taken by my father today morning, when he went for a morning walk. He sent me those pics via whatsapp. Enjoy.
.
...
more...

All the 5 pics here show the newly built staircase, which will connect both the PFs with the road. In Pic 5, the complete status of the 2nd line (on the right side) is clearly visible.

Translate to English
Translate to Hindi

More Posts
Info Update
69850 views
8

Dec 21 2013 (16:03)   SSPH/Satish Samanta P.H. (2 PFs)
 
AvradipTMZ^~
AvradipTMZ^~   3913 blog posts
Entry# 941652            Tags  
Pics of Satish Samanta (SSPH) Station, the 2nd one apart from MSDL, which connects Mahishadal Town.
Translate to English
Translate to Hindi

More Posts
Info Update
79051 views
1

Aug 02 2016 (19:14)   SSPH/Satish Samanta P.H. (2 PFs)
 
AvradipTMZ^~
AvradipTMZ^~   3913 blog posts
Entry# 1949731            Tags  
Just for record. The former ticket counter at Satish Samanta Halt (SSPH) station, in between PKU-HLZ in SER.
This counter is no more, it has been demolished because of ongoing doubling work of the existing single electrified track.
Source: Pic (1) click here
Pic (2) click here
The
...
more...
doubling work is almost finished, only a small stretch (may be 2-3 kms) near the Hijli Tidal Canal is left.
Photos can be found in this blog of mine: /blog/post/1606708

Translate to English
Translate to Hindi
Rail Fanning
73219 views
4

Oct 03 2015 (17:29)   22614X/Sangrami Express (PT) | SSPH/Satish Samanta P.H. (2 PFs) | ET/WAM-4/21396
 
AvradipTMZ^~
AvradipTMZ^~   3913 blog posts
Entry# 1606903            Tags  
Down 22614 Haldia (HLZ) - Chennai Central (MAS) Weekly Superfast Express (also known as Sangrami Express) slowly passes by Satish Samanta Halt (SSPH) again with a massive offlink (Itarsi(ET) based WAM 4 #21396). God knows when this train is going to get a regularized permanent loco link between VSKP and HLZ.
Date: Oct 3, 2015, Saturday.
Translate to English
Translate to Hindi

More Posts
Rail Fanning
106188 views
4

Oct 03 2015 (13:21)   SSPH/Satish Samanta P.H. (2 PFs)
 
AvradipTMZ^~
AvradipTMZ^~   3913 blog posts
Entry# 1606708            Tags   Past Edits
A few snaps taken at Satish Samanta Halt (SSPH) and in between SSPH - Mahishadal (MSDL) showing the doubling work status. Only a small stretch (near the Hijli Canal bridge) of ~ 2-3 kms is left. Rest of the part has already been doubled, and in working condition.
Date: Oct 3, 2015
Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 12 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy