Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Amarkantak Express: Holy for Railfans as holy as Amarkantak is for devotees. - Ayan G

Search Gallery
Post PNR
Large Station Board;
Entry# 566231-0
Large Station Board;
Entry# 802935-0
no description available
Entry# 2320768-0

SNTD/Santaldih (3 PFs)
सांतालडीह
সান্তালডি


Track: Double Electric-Line

Show ALL Trains
Number of Platforms: 3
Number of Halting Trains: 20
Number of Originating Trains: 0
Number of Terminating Trains: 0
Bagra P, Santaldih , Pin - 723145, Dist - Purulia
State: West Bengal
Elevation: 154 m above sea level
Type: Regular
Category: n/a
Zone: SER/South Eastern
Division: Adra
No Recent News for SNTD/Santaldih
Nearby Stations in the News

2 Follows
Rating: 4.4/5 (10 votes)
cleanliness - good (2)
porters/escalators - n/a (0)
food - good (2)
transportation - excellent (2)
lodging - n/a (0)
railfanning - excellent (2)
sightseeing - good (1)
safety - excellent (1)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 19 Pic/Video Blogs  <<prev  next>>

SNTD/Santaldih


35815 views
1

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

SNTD/Santaldih


35815 views
1

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

SNTD/Santaldih


35815 views
1

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

SNTD/Santaldih


35815 views
1

Girder Launching of new Foot Over Bridge at Santaldih (SNTD) completed on 29.01.2023. For the work 140T Break Down Crane named "Garuda" of ART/ADRA was brought along with Tower Car of Adra, Purulia and Bhojudih for OHE works.
×

13301/Swarna Rekha Express

DHN/Dhanbad Junction


509413 views
3

Swarna Rekha Exp restored from 1st May . . . . Will run via Patherdih Bypass(eliminating reversal) with no stop at Sindri, Patherdih, Sudamdih, Bhojudih Santaldih and Barabhum.
×

SNTD/Santaldih


45755 views
16

Rites invited Tender and Contract document for Supply, Installation, Wiring, Testing and Commissioning of Signalling and TelecommunicationP.I. work in connection with Renovation /Strengthening of the existing Railway Siding at Bhojudih Coal Washery, Santhaldih West Bengal under S.E. Railway, Adra Division.i attached the tender document , satellite image and drawings of BJE coal washery. Have a look everyone.
×

SNTD/Santaldih


45755 views
16

Rites invited Tender and Contract document for Supply, Installation, Wiring, Testing and Commissioning of Signalling and TelecommunicationP.I. work in connection with Renovation /Strengthening of the existing Railway Siding at Bhojudih Coal Washery, Santhaldih West Bengal under S.E. Railway, Adra Division.i attached the tender document , satellite image and drawings of BJE coal washery. Have a look everyone.
×

SNTD/Santaldih


59416 views
10

RITES LTD. Invited tender for electrifcation and other ancillary works for Bhojudih coal washery in Adra div.04/OT/BCCL-Bhojudih/Electrical /2021Dated 19.05.2021 Name of Work Design, Drawing, Supply, Testing Commissioning of 25 KV AC OHE with Santaldih SSP modification and Other Electrical Works on Renovation/ Strengthening of the existing Railway Siding at Bhojudih Coal Washery,Santaldih Dist — Purulia, West Bengal, PKG-III. Estimated Cost: Rs 12.45 Cr Earnest Money: NA Period of completion: 12(Twelve ) months. Last time & date of submission of bid: upto 11.00 hrs. on 09.06.2021.
×

KGP/Kharagpur Junction


980784 views
12

Maximum permissable speed of routes of South Eastern Railway.#mps /SER
×

KGP/Kharagpur Junction


980784 views
12

Maximum permissable speed of routes of South Eastern Railway.#mps /SER
×

KGP/Kharagpur Junction


980784 views
12

Maximum permissable speed of routes of South Eastern Railway.#mps /SER
×

KGP/Kharagpur Junction


980784 views
12

Maximum permissable speed of routes of South Eastern Railway.#mps /SER
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy