Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bangalore Namma Metro - ಸ್ವಲ್ಪ ಜಾಗ ಕೊಡಿ

Search Gallery
Post PNR

BNA/Banni Koppa (3 PFs)
बन्नी कोप्पा
ಬನ್ನಿಕೊಪ್ಪ


Track: Double Electric-Line

Updated: Mar 27 2023 (18:05) by Manoj851120~
Show ALL Trains
Number of Platforms: 3
Number of Halting Trains: 12
Number of Originating Trains: 0
Number of Terminating Trains: 0
National Highway 63
State: Karnataka
Elevation: 601 m above sea level
Type: Regular
Category: NSG-6
Zone: SWR/South Western
Division: SSS Hubballi (Hubli)
No Recent News for BNA/Banni Koppa
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 10 Pic/Video Blogs  <<prev  

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

KBL/Koppal

UBL/WDG-4/12324


148173 views
29

#Electrificationupdate and #doublingupdate of Koppal - Gadag section as on #October15th2019🔸Koppal1) UBL/WDG-4/12324 was spotted with OHE poles vehicle. OHE portals with wire can also be seen in this picture - #WDG4UBL🔸Between Koppal and Bhanapur2) Wiring stopped3) & 4) OHE poles with insulators🔸Bhanapur5) & 6) Large SB🔸Between Bhanapur and Bannikoppa7) & 8) Aligned OHE poles without insulators🔹Land levelling done for Talakal - Wadi (Gadag - Wadi) new line🔸Bannikoppa9) Large SB10) Non-aligned OHE pole and portal🔸Between Bannikoppa and Sompur Road11) Non-aligned OHE pole🔸Sompur Road12) Large SB🔸Between Sompur Road and Harlapur13) to 15) Foundations for OHE poles appeared and disappeared in some stretches🔸Harlapur16) Foundation...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

HPT/Hosapete Junction (Hospet)


135128 views
20

Hosapete-Bhanapura 40kms Double Electrification Update part of HOSAPETE-HUBBALLI-VASCO RE PROJECT:* Poles are Erect Btn HPT-Ginigere but wiring not started .*wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km.*Poles are Erect Btn Koppal-Bhanapura(Excl) but wiring not started .*HPT(Excl)-Bhanapura(incl) 40kms RE was Target to complete by Q1 of 2019-20 pics 1.HPT outer Poles are Erect but wiring not started.2.TB River new bridge RE not started 3&4 At Munirabad5.At Hitnal new PF under construction 6&7.At Ginigere wiring vehicle parked at here8&9 wiring work completed btn GINGERE(Excl)-Koppal (KBL) -124.6km-119.6km10. SSP under construction at KBL11. portal At Koppal12.Just before Bhanapura 13. after Bhanapura few poles are...
×

BNA/Banni Koppa


29420 views
0

1st station pic of this railway station on IRI.Source:- click here
×

BNA/Banni Koppa


31722 views
4

bannikoppa st 2nd pf new
×

BNA/Banni Koppa


31722 views
4

bannikoppa st 2nd pf new
×

16591/Hampi Express

BNA/Banni Koppa


26047 views
1

#admin #moderator sir pls add bannikoppa bna station for hampi express 16591/92 stop provide for 1 min here on experimental basis for period of 6 months.confirmed by drm sbc Twitter account
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy