Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFanning is an art-form; RailFans are the paints - Ayush Kumar Singh

Search Gallery
Post PNR
Large Station Board;
Entry# 2054686-0
Large Station Board;
Entry# 2054686-0

ADST/Adi Saptagram (3 PFs)
आदि सप्तग्राम
আদি সপ্তগ্রাম


Track: Triple Electric-Line

Updated: Sep 14 2020 (22:35) by JoydeepRoy
Show ALL Trains
Number of Platforms: 3
Number of Halting Trains: 2
Number of Originating Trains: 0
Number of Terminating Trains: 0
S.T. Road, Adisaptagram, Trishbigha, Pin - 712502, Dist - Hooghly
State: West Bengal
Elevation: 16 m above sea level
Type: Regular
Category: n/a
Zone: ER/Eastern
Division: Howrah
No Recent News for ADST/Adi Saptagram
Nearby Stations in the News

1 Follows
Rating: 3.0/5 (8 votes)
cleanliness - good (1)
porters/escalators - average (1)
food - average (1)
transportation - excellent (1)
lodging - poor (1)
railfanning - poor (1)
sightseeing - average (1)
safety - excellent (1)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 19 Pic/Video Blogs  <<prev  next>>

36817/Howrah-Barddhaman Local (via Chord Line)

KQU/Kamarkundu


200474 views
11

4 Coach EMU Patrolling Special, Eastern Railway-Howrah division#emuER #Lockdowntrains #lifetimecapture #mymemories
×

36817/Howrah-Barddhaman Local (via Chord Line)

KQU/Kamarkundu


200474 views
11

4 Coach EMU Patrolling Special, Eastern Railway-Howrah division#emuER #Lockdowntrains #lifetimecapture #mymemories
×

37542/Bandel - Naihati Local

BDC/Bandel Junction


284913 views
6

🔹Pic1 Home signal of Bandel for Naihati-Bandel branch line • Route indicators to PF1B, PF1A, PF1, PF2, Stabling line, PF3, PF5 (dock),PF4, Yard lines🔹Pic2 Bandel station from outer, Time-14:40, (L-R)PF1B - Bandel Howrah LocalPF1A - Bandel Katwa LocalPF1 - Empty for reception of HWH ASR ExpPF2 - Bandel Naihati LocalPF3 - Howrah Bandel Loacl (onboard, entering)PF5 - Not visible,on right sidePF4 - Not visible,on right side🔹Pic3- Bandel outer (HWH end)[All platforms in this station are common lines] #emuER
×

37542/Bandel - Naihati Local

BDC/Bandel Junction


284913 views
6

🔹Pic1 Home signal of Bandel for Naihati-Bandel branch line • Route indicators to PF1B, PF1A, PF1, PF2, Stabling line, PF3, PF5 (dock),PF4, Yard lines🔹Pic2 Bandel station from outer, Time-14:40, (L-R)PF1B - Bandel Howrah LocalPF1A - Bandel Katwa LocalPF1 - Empty for reception of HWH ASR ExpPF2 - Bandel Naihati LocalPF3 - Howrah Bandel Loacl (onboard, entering)PF5 - Not visible,on right sidePF4 - Not visible,on right side🔹Pic3- Bandel outer (HWH end)[All platforms in this station are common lines] #emuER
×

37542/Bandel - Naihati Local

BDC/Bandel Junction


284913 views
6

🔹Pic1 Home signal of Bandel for Naihati-Bandel branch line • Route indicators to PF1B, PF1A, PF1, PF2, Stabling line, PF3, PF5 (dock),PF4, Yard lines🔹Pic2 Bandel station from outer, Time-14:40, (L-R)PF1B - Bandel Howrah LocalPF1A - Bandel Katwa LocalPF1 - Empty for reception of HWH ASR ExpPF2 - Bandel Naihati LocalPF3 - Howrah Bandel Loacl (onboard, entering)PF5 - Not visible,on right sidePF4 - Not visible,on right side🔹Pic3- Bandel outer (HWH end)[All platforms in this station are common lines] #emuER
×

13106/Ballia - Sealdah Express

DBP/Debipur


1047530 views
1

Power & Traffic Block for Commissioning of 3rd Line in Howrah-Barddhaman Main
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


780761 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy