Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

मैं अकेला ही चला था जानिब-ए-मंज़िल मगर लोग साथ आते गए और कारवाँ बनता गया - Purnesh Upadhyay

Search Gallery
Post PNR
Close-up; Platform Pic; Large Station Board;
Entry# 3750466-0
Medium; Platform Pic; Large Station Board;
Entry# 3750466-0
Night Pic; Platform Pic; Small Station Board;
Entry# 3750466-0

TLO/Talandu (3 PFs)
तालाण्डु
তালাণ্ডু


Track: Triple Electric-Line

Updated: Mar 14 2023 (07:47) by Manoj851120~
Show ALL Trains
Number of Platforms: 3
Number of Halting Trains: 2
Number of Originating Trains: 0
Number of Terminating Trains: 0
Talandu - Sultangacha Road, Pin - 712148, Dist - Hooghly
State: West Bengal
Elevation: 27 m above sea level
Type: Regular
Category: SG-3
Zone: ER/Eastern
Division: Howrah
No Recent News for TLO/Talandu
Nearby Stations in the News

0 Follows
Rating: 1.9/5 (8 votes)
cleanliness - poor (1)
porters/escalators - poor (1)
food - poor (1)
transportation - poor (1)
lodging - poor (1)
railfanning - average (1)
sightseeing - excellent (1)
safety - poor (1)

Show ALL Trains
Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 6 to 10 of 17 Pic/Video Blogs  <<prev  next>>

TLO/Talandu


13405 views
3

Pic 1,2,3: Large Station BoardPic 4: Small Station BoardSource: click here
×

TLO/Talandu


13405 views
3

Pic 1,2,3: Large Station BoardPic 4: Small Station BoardSource: click here
×

TLO/Talandu


13405 views
3

Pic 1,2,3: Large Station BoardPic 4: Small Station BoardSource: click here
×

TLO/Talandu


13405 views
3

Pic 1,2,3: Large Station BoardPic 4: Small Station BoardSource: click here
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

BWN/Barddhaman Junction


779105 views
21

STATUS OF TRIPLING PROJECT BETWEEN BANDEL AND BARDHAMAN •> Between BANDEL and ADISAPTAGRAM - No work has been done•> Between ADISAPTAGRAM and TALANDU - Some bridges are getting constructed and at some places levelling of ground is going on•> Between TALANDU and KHANYAN - Poles have been erected but no track has been laid•> Between KHANYAN and DEBIPUR - Tripling done along with Electrification but the line has not been connected with main line•> Between DEBIPUR and BAGILA - After Debipur station, for some distance, Electrification has been done but no track has been laid. Levelling of ground...
×

53048/Viswabharati Fast Passenger

TLO/Talandu

GZB/WAP-1/22033


116545 views
20

Rarest capture, today capture when it is in-charged for 2nd consecutive day ...
×

13011/Howrah - Malda Town Intercity Express (via Rampurhat)

TLO/Talandu

HWH/WDP-4D/40373


12250 views
2

Thundering HWH WDP-4D greets HWH WAP-4 in style and aggression!! Two Intercities show off at Talandu!!Video link:click herePresenting you a crossing of two different trains with two different locomotives from the same Locomotive shed. On a hot afternoon, 22402 HWH WAP- 4 cruises towards Bandel Junction with the 13016 Bolpur Shantiniketan (BHP)- Howrah (HWH) KAVIGURU Express, and meets the speeding 13011 Howrah (HWH)- Malda Town (MLDT) INTERCITY Express (Via Bolpur) with 40373 HWH WDP- 4D in lead. Location is Talandu station on ER's HB Main enroute.
×

13011/Howrah - Malda Town Intercity Express (via Rampurhat)

TLO/Talandu

HWH/WDP-4D/40373


12250 views
2

Thundering HWH WDP-4D greets HWH WAP-4 in style and aggression!! Two Intercities show off at Talandu!!Video link:click herePresenting you a crossing of two different trains with two different locomotives from the same Locomotive shed. On a hot afternoon, 22402 HWH WAP- 4 cruises towards Bandel Junction with the 13016 Bolpur Shantiniketan (BHP)- Howrah (HWH) KAVIGURU Express, and meets the speeding 13011 Howrah (HWH)- Malda Town (MLDT) INTERCITY Express (Via Bolpur) with 40373 HWH WDP- 4D in lead. Location is Talandu station on ER's HB Main enroute.
×

13028/Azimganj - Howrah Kaviguru Express

BDC/Bandel Junction


572957 views
2

Traffic Block on Saktigarh - Bandel Section.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy