Page# Showing 1 to 5 of 1207 Pic/Video Blogs next>>
20898/Ranchi - Howrah Vande Bharat Express
RNC/Ranchi Junction
44947 views
8
PowerBI Dashboard of 20898 and 20897: Ranchi Howrah Ranchi VB. 01-01-2024 to 31.03.2024 (Q1 2024)1. Occupancy Record: Average | Maximum | Minimum2. APJL(Average Passenger Journey Length). APJL/TJL ratio.3. Segmentation and % Total.
×
20898/Ranchi - Howrah Vande Bharat Express
RNC/Ranchi Junction
44947 views
8
PowerBI Dashboard of 20898 and 20897: Ranchi Howrah Ranchi VB. 01-01-2024 to 31.03.2024 (Q1 2024)1. Occupancy Record: Average | Maximum | Minimum2. APJL(Average Passenger Journey Length). APJL/TJL ratio.3. Segmentation and % Total.
×
22843/Bilaspur - Patna Weekly SF Express
PRR/Purulia Junction
BZA/WAP-4/22201
62309 views
36
Bza Wap4 #22201(in Bhilai Wam4 livery) with 22843 Bilaspur Patna Sf express departing from Purulia Junction
×
22843/Bilaspur - Patna Weekly SF Express
PRR/Purulia Junction
BZA/WAP-4/22201
62309 views
36
Bza Wap4 #22201(in Bhilai Wam4 livery) with 22843 Bilaspur Patna Sf express departing from Purulia Junction
08819/Tatanagar - Saharsa Special Fare Holi Special (via Asansol)
TATA/Tatanagar Junction
78266 views
1
Tatanagar - Saharsa Holi Special
×
PRR/Purulia Junction
21639 views
6
Major yard remodelling at PRR along with EI replacing age old RRI to start next month.Tentative SIPv1 for reference only. Final SIP for execution can be significantly different. Enhancements:1. Capacity increment to handle 6 simultaneous movements from present 2.2. Independent handling of PRR-KSX new double line traffic to improve seamless operation in BNR line.3. Provision of 3rd and 4th line (BNR).Civil Changes:1. Elimination of trespassing near Shankar Chitrayan by constructing a RHS.2. Commencement of platforn no. 5 and construction of platform no. 6 by demolishing Goods Shed.3. Construction of 2 new loop lines with sand hump.4. Modification of Yard Sleeper density...
×
PRR/Purulia Junction
21639 views
6
Major yard remodelling at PRR along with EI replacing age old RRI to start next month.Tentative SIPv1 for reference only. Final SIP for execution can be significantly different. Enhancements:1. Capacity increment to handle 6 simultaneous movements from present 2.2. Independent handling of PRR-KSX new double line traffic to improve seamless operation in BNR line.3. Provision of 3rd and 4th line (BNR).Civil Changes:1. Elimination of trespassing near Shankar Chitrayan by constructing a RHS.2. Commencement of platforn no. 5 and construction of platform no. 6 by demolishing Goods Shed.3. Construction of 2 new loop lines with sand hump.4. Modification of Yard Sleeper density...
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.